Loading...
HomeMy WebLinkAboutNCG020715_NOV Response_20201105 CW1 Triangle Brick 6523 NC Highway 55 October 28, 2020 Durham, NC 27713 Durham:(919)544-1796 Raleigh: (919)828-2070 r i° Toll Free:800-672-8547 North Carolina Department of Fax:800-849-0612 Environmental Quality Fayetteville Regional Office Division of Energy, Mineral and Land Resources 225 Green Street,Suite 714 DEQ- ATHEVILLE RFUNALOFFIGI Fayetteville, North Carolina 28301 Attention: Timothy L. La Bounty, PE Regional Engineer Reference: NOTICE OF VIOLATION (NOV-2020-PC-0440) NPDES Stormwater General Permit NCG020000 Triangle Brick Company-Wadesboro Plant, Certificate of Coverage NCG020715 Anson County Dear Mr. LaBounty: It is with great regret that Triangle Brick Company, Wadesboro Plant was determined out of compliance in reference to NOV-2020-PC-0440. Please accept my apology for our violations of permit conditions in reference to our Stormwater Pollution Prevention Plan (SWPPP), Qualitative Monitoring,and Analytical Monitoring. As a new plant manager with limited exposure to our SWPPP, the guidelines of compliance were not clear to me. I understand this is my responsibility and take pollution of any type very seriously. On 10/26/2020, 1 met with Senior Engineer, David W. Wasiela, PE with ERM NC, Inc. to evaluate our SWPPP and facility grounds. Below is the list of action items that are being addressed in reference to our evaluation; 1) We will install a fixed "V" notch weir plate at outfall 1 with graduated flow markings to aid in visual recording of Daily Flow Rates measured in Cubic Feet per Second. This will also enable sampling from exact location for each sampling event. 2) In lieu of our current inspection in reference to pH testing, as suggested by Melissa Joyner, Environmental Specialist, DEMLR, we have ordered and received a field pH meter and calibrated solutions of 4.01 pH, 7.01 pH and 10.01 pH for calibration. Testing and recording pH of all outfalls sampled will occur every sampling period within 15 minutes of sampling, as well as recording in the Wastewater Annual Summary Discharge Report by March 1st of each year. 3) Outfall's 2 and 3 will be viewed every sampling period, in the unlikely event of discharge they will be sampled as well. Otherwise these outfalls will be recorded as "No Flow" within 30 days of the sampling period in the monitoring reports and recorded in the Stormwater Annual -- -- - Summary Discharge Report by March 1st of each year. i 4) SWPPP site plan is being updated to illustrate drainage areas for each of the storm water outfalls; Outfall #s 1, 2 and 3. 5) With previous exceedances of turbidity NTU samples,we will sample quarterly in accordance with Tables 7 and 8 of the NPDES General Permit NCG020000. We will sample outfall 1 on our property at weir plate discharge, upstream of outfall 1 where Grindstone Branch crosses Hwy. 52 N. (.3 miles south of the access road to Outfall 1), and downstream of outfall 1 at I' Goulds Fork Creek at the bridge on Lockhart Road. Melissa Joyner and I verbally discussed upstream and downstream sampling on 10/27/2020 and this is the method we determined would be best practice to achieve our goal of collecting accurate sampling data. 6) We will perform a comprehensive site evaluation semi-annually to inspect storm water control measures, outfalls, identify any new sources of potential pollutants and review SWPPP for needed updates. I have been provided (by ERM) a form that I will use to record and file semi-annually in the SWPPP. 7) Conduct annual personnel training onsite for 2020 and record in the SWPPP. 8) Update SWPPP team members and contacts to reflect current personnel. 9) Update the list of significant spills in the SWPPP indicating that no spills have occurred, and maintain. In closing, I want to assure you that our goal as a company is to be compliant in reference to all environmental affairs, governmentally and self-regulated. Sincerely, TRIANGLE BRICK COMPANY David A. Gibson Director of Manufacturing, Wadesboro Facility Original: Timothy L. LaBounty, PE, Regional Engineer(via US Mail, certified) cc: Melissa Joyner, Environmental Specialist, DEMLR (via email) Howard P. Brown, President,Triangle Brick Co. (via email) David W. Wasiela, P.E., ERM NC. (via email) Edward M. Dutch, Assistant Dir. Of Mfg. (via email) Tommy A. Meggs II, Kiln Supervisor,Triangle Brick Co. (via email)