Loading...
HomeMy WebLinkAbout090022_Inspection_20201014 '- /0— / (c-�r vision of Water Resources Facility Number - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: O'Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: utine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit:I/U"N Arrival Time:I//, Departure Time: ' County: lo��,�.-� Region: D Farm Name: ,7 vc t v1. G/'1-.r.0 Owner Email: Owner Name: -S/1-jvt fi(� �Gt �c.�•� Phone: Mailing Address: Physical Address: Facility Contact: /fte 5 �,e/u ciT Title: �f r—� Phone: Onsite Representative: �r�� Integrator: Certified Operator: iYAy Certification Number: e}i-73 Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non-Layer Dairy Calf seder to Finish L-t jjk7Z? Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D Poul Ca aci Po . Non-Dairy Farrow to Finish Beef Stocker Gilts II Non-La ers -- Beef Feeder Boars El Pullets -- Beef Brood Cow Other •Turke Poults Other IN Other Discharges and Stream Impacts 1.Is any discharge observed from any part of the operation? ❑ Yes Q o ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? El Yes El"El<lo ❑ NA ❑ NE 3.Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Et< ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued 'Facility Number: 9' - ,22— I (Date of Inspection: /O 1*— Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes [�]No ❑ NA ❑ NE a.If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): a/4 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes dNo ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes "No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? ❑ Yes [r No ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes [/]/No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes [/]No ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ]No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes lallo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): �y y� /Qc/r js _d 13. Soil Type(s): ncf'ifie 7 4� 056D/9 /get,-'z5. 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [2]No ❑ NA D NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes []No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 1=I'Ko ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes fNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 2"No ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes L No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes [�]No ❑ NA ❑ NE the appropriate box. ❑WUP ['Checklists ❑Design ❑Maps ❑ Lease Agreements El Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes I No ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 121 Noo ❑ NA ❑ NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ElYes [3i ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued (Facility Number: g- - ,22 1 Date of Inspection: /D 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes 0 No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes 131Cir ❑ NA ❑ NE the appropriate box(es)below. 0 Failure to complete annual sludge survey ['Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes iNo ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes INo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes 0/No ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the 0 Yes dNo ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes la-No ❑ NA ❑ NE El Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes Q'IzIo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes [allo ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? 0 Yes ❑-No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). fifin- /f P`la.• J9�rt�-�— 9�"� s fi�4t • ?7i7- Reviewer/Inspector Name: Phone: j03 P75-7 Reviewer/Inspector Signature: Date: /i)`/ �0�7 Page 3 of 3 2/4/2015