HomeMy WebLinkAbout20171082 Ver 1_Certification of Completion_20201116 CERTIFICATE OF COMPLETION
NCDWR Project No.: 17-1082 County: Cabarrus
Applicant: (Nike E Yl f Yam{ ` Q'Yo'y Y1 a S, l..l..C.
Project Name: Windy Road
Date of Issuance of 401 Water Quality Certification: 12, C7 (o C ( 2..0 1"
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications,the applicant is required to return this certificate to the 401
Transportation Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center,
Raleigh, NC,27699-1650. This form may be returned to NCDWR by the applicant,the applicant's
authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, )vic.k* ,(-- , hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed
to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules,the approved plans and specifications, and other supporting materials.
Signature: nejTPCpe�L0 Date: o g 'n S 2020
Agent's Certification
I, MC.,1/41/4kWil , hereby state that,to the best of my abilities,due care
and diligence was used in the observation of the construction such that the construction was observed
to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules,the approved plans and specifications, and other supporting materials.
Signature: (Yr1CsjCJ\ Date: CThR't G5 I2
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State
of North Carolina,having been authorized to observe(periodically,weekly,full time)the construction of
the project for the Permittee hereby state that,to the best of my abilities,due care and diligence was
used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved
plans and specifications,and other supporting materials.
Signature Registration No. Date
RECEIVED 11E@MOW[Efit
•
NOV 0 3 2020 ,. .� :., ; t,;,:,: I , :F� > . Nay i b 2020
_!?� 5_li r,,,r�yL•<%! IC'' C tcr.;er E'a e; !l'C
DENR-WATER RESOURCES
NCD EQ/DWR/N PD E S TRANSPORTATION PERMITTING UNIT