Loading...
HomeMy WebLinkAbout20100485 Ver 1_401 Application_20100610,rgi FAe,-r 2 0 1 0 0 485 F A \O??F WA7FRpG Office Use Only: Corps action ID no. o < DWQ project no. ' Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: 404 Permit El Section 10 Permit ? Section 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigattorr bank or in=lieu fee program. o El Yes XN 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ? Yes ? No 1h, Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ? No 2. Project Information 2a. Name of project: 0V4 4.Le. f lb@C/-5 2b. County: 2c. Nearest municipality / town: M 00 Ai ZI It, in) I r"5i ra ? t , v? 2d. Subdivision name: n I 2e. NCDOT only, T.I.P. or state project no: JUN ! 21010 3. Owner Information DENR-W.4TERMIALITY t M 3a. Name(s) on Recorded Deed: * a AND tTMl AYVf_ AliOA/4 ij S 3b. Deed Book and Page No, 3c. Responsible Party (for LLC if applicable): I 3d. Street address: 3 Z ( ?'??in /t,G k IZW, 3e. City, state, zip: OOlLCS'ud1e /'U C 2 3f. Telephone no.: Z 9Z y Z p/ p L) 3g. Fax no.: 3h. Email address: C ,q ,9 T N AfL VAI/1 /7 • CO," U a ANCH Page t of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no,: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Latitude: Longitude: - 1b. Site coordinates (In decimal degrees): (DD.DDDDDD) (-DD,DDDDDD) 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to }? A C ((A proposed project: , 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 11 Not 41~s tomjkttL?e my r /leer 0 A;4le-4 3b. List the total estimated acre ge of all existing wetlands on a property: List the total estimated linear feet of all existing streams (intermittent and perennial) on th property: 3c . - To 7 / l v -fee ? 1.4 /GL ??lo.?? &v De-4,A1 SbCA 41 d pp3d. Explain the purpose of the roposed project: SJ rGf ??? F d ib n/ D,, VL S 0? ??164 Q 3e. Describe the overall pr )ect in detail, including the type of equipment to be d: 40 140.CS J2 iet: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instru ions. 041V ?aOp?60Va G ?• c - ??i.u,dll ?J 9t U', 011 6. Future Project Plans 6a. Is this a phased project? ? Yes ? No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary k all that apply): 1 a. Which sections were completed below for your project ( ? Wetlands ? Streams - tributaries uffers XB ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact 2b. 2c. 2d. 2e. Type of jurisdiction 2f. number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Tem ora T ? Yes ? Corps W1 ? P ? T ? No ? DWQ ? Yes ? Corps W2 ? P [] T ? No ? DWQ ? Yes ? Corps W3 ? PEI T ? No ? DWQ ? Yes ? Corps W4 ? P ? T ? No ? DWQ ? Yes ? Corps W5 ? P ? T ? No ? DWQ ? Yes ? Corps W6 ? P ? T ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary Impacts) proposed on the site, then complete this question for all stream sites impacted, 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average t Impact length number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ - non-404, s ream width (linear Temporary (T) (INT)? other) (feet) feet) ? PER ? Corps S1 ? P ? T ? INT ? DWQ ? PER ? Corps S2 ? P ? T ? INT ? DWQ ? PER ? Corps S3 ? P ? T ? INT ? DWQ F1 PER El Corps S4 ? P ? T ? INT [:1 DWQ ? PER ? Corps S5 ? P ? T ? INT _ ? DWQ ? PER ? Corps S6 ? P ? T ? INT ? DWQ 3h. Total stream and tributary impacts 31. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open wate r impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g, Comments: 5. Pond or Lake Construction if and or lake construction ro osed the n com lete the chart below. 5a. 5b. 5c. Wetland Impacts (acres) 5d. 5e. Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will Impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below, If an im acts require mitigation, then you MUST fill out Section D of this form. 6a. 3o44-- )90- 91M 2 ? Neuse ? Tar-Pamlico ? Other: AJ Project is in which protected basin? j Catawba ? Randleman f!? 0AA 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? _ B1 []P?T pQGIG ?Nos ? Yes B2 ? P ? T ? No ?Yes B3 ?P?T ? No 6h. Total buffer impacts 6i. Comments: S 7'v 7? /Lt4 Page 5 of 10 Sfi f / G ,o.,A.A/ Z* L AwAhr?a ?j PC?yN GForm - Version 1.3 December 10, 2008 Version ?'/ LCo??.t I ?!I ` T'r ? /(t"L ? ?OAN???/j' ? /w r D. Impact Justification and Mitigation / 1. Avoidance and Minimization - To i. ? C 7i/9 "" e? lJl? Specifically describe}?easures taken to avoid or minim a the proposed I pacts in designing pro'ect.af li /3l ro fee Akk'661 1 b. Specifically describe measures taken to avoid r ni a the opose impacts through const uction techn'ques. L parck .r 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State T 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. if yes, which mitigation option will be used for this project? ? Mitigation bank Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits-Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres - 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 6. Complete if Using a Permittee Responsible Mitigation Plan 5a, If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. All, - /V/W. LAO GS. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ? No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total Impact Multiplier 6e. Required square mitigation ( feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, 6g . permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form -Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ? Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government Who will be-responsible for the review of the Stormwater Management Plan? 2e ? DWQ Stormwater Program . ? DWQ 401 Unit 3. Certified-Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II F] NSW 3b. Which of the following locally-implemented stormwater management programs ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c, Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a, Which of th-e following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been El Yes El No attached? 15, DWQ 401 Unit Stormwater Review 15a. Does the Stormwater Management Plan meet the appropriate requirements? I ? Yes ? No 15b. Have all of the 401 Unit submittal requirements been met? I ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a, Does the project involve an expenditure of public (federal/state/local) funds or the Yes No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) d s?.? /11 ?CGK 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated d d St ? ?w I v,? 4, l3tl ? Yes ? No s, an ar Wetland Rules (15A NCAC 2H.1300), DWQ Surface Water or Wetland or Riparian Buffer Rules (15A NCAC 2B.0200)? 2 2b. Is this an after-the-fact permit application? Yes ? No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. WIII this project (based on past and reasonably anticipated future Impacts) result in additional development, which could impact nearby downstream water quality? El Yes IiN? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative imp t analysis in accordance with the t JGG n arrative d scyppjJ? l l y ? ? '? e a s ?# , most recent DWQ Polly. It if y ?s?w d o-M pro U.ye,1 't? / / p /M rA 10 9 L A GGl r 4. Sewage Disposal (DWQ Requirement) , C 441-A eta, Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. n ,AA An >-y?.le . . k,P71- fl. OW, Page 9 of 10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? El Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes ? No 5c. If yes, indicate the USFWS Field Office you have contacted. El Raleigh Ej Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or nearan area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes ? No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did y u use to make the floodplain determine A/ u Applicant/Agent's Printed Name Applica Agent's S' lure (Agent's slg a re is valid o if an auth lion letter from the applicant Is rovide . Date Page 10 of 10 PCN Form -Version 1.3 December 10, 2008 Version