Loading...
HomeMy WebLinkAbout20201475 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201115Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, November 15, 2020 12:01 AM To: josselyn@bfec.org Cc: Annino, Amy M Subject: Pre -Filing Time Clock has been reached for McClean SWPPP - 20201475 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for McClean SWPPP that you submitted on 10/15/2020. The I D number for that project is 20201475, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201475 Version* 1 Regional Office* Asheville Regional Office - (828) 296-4500 Reviewer List* Amy Annino Pre -Filing Meeting Request submitted 10/15/2020 Contact Name * Josselyn Lucas Contact Email Address* josselyn@bfec.org Project Name* McClean SWPPP Project Owner* Brushy Fork Environmental Consulting, Inc. Project County* Caldwell Owner Address: Street Address 10565 Highway 421 South Address Line 2 aty State / Frovince / Region Trade Tennessee Rbstal/Zip Code Country 37691 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below. Project is located in Caldwell County, NC. Proposed design is for the installation of a metal building 80' x 50', and the associated grading on the proposed building site. Failed culverts under the existing driveway will be replaced, and driveway will be re -graded and re -graveled. Please give a couple of dates you are available for a meeting. 10/20/2020 10/22/2020 Please attach the documentation you would like to have the meeting about. McLean Location.pdf 1.94MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/15/2020