HomeMy WebLinkAbout20201467 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201114Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, November 14, 2020 12:01 AM
To: jon.swaim@mcgillassociates.com
Cc: Johnson, Alan
Subject: Pre -Filing Time Clock has been reached for Bessemer City Water Treatment Plant
Improvements - 20201467 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Bessemer City
Water Treatment Plant Improvements that you submitted on 10/14/2020. The ID number for that project is 20201467,
Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201467
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 10/14/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Jon Swaim
jon.swaim@mcgillassociates.com
Bessemer City Water Treatment Plant Improvements
City of Bessemer City
Gaston
Street Address
1013 State Farm Road
Address Line 2
aty
Boone
Rbstal / Zip Code
28607
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson
Please give a brief project description below.
In addition to proposed improvements to the existing Bessemer City Water
Plant, the City is proposing to replace the existing rawwater intake located
on Arrowood Reservoir. Proposed project plans call for the replacement of
the raw water intake along with the addition of a wet well, two (2) 1000 GPM
vertical turbine pumps with 75 HP motors, all related valves and piping, and
associated electrical components.
We anticipate that the proposed improvements will result in minimal
temporary and permanent open water impacts to Arrowood Reservoir. No
jurisdictional streams or wetlands were found within the proposed project
area.
Please give a couple of dates you are available for a meeting.
10/19/2020
10/20/2020
10/21 /2020
10/22/2020
Please attach the documentation you would like to have the meeting about.
Bessemer City - New Intake Plan.pdf 1.93MB
WTP Location Map.pdf 401.68KB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/14/2020