Loading...
HomeMy WebLinkAbout20201467 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201114Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, November 14, 2020 12:01 AM To: jon.swaim@mcgillassociates.com Cc: Johnson, Alan Subject: Pre -Filing Time Clock has been reached for Bessemer City Water Treatment Plant Improvements - 20201467 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Bessemer City Water Treatment Plant Improvements that you submitted on 10/14/2020. The ID number for that project is 20201467, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201467 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/14/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jon Swaim jon.swaim@mcgillassociates.com Bessemer City Water Treatment Plant Improvements City of Bessemer City Gaston Street Address 1013 State Farm Road Address Line 2 aty Boone Rbstal / Zip Code 28607 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country United States Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. In addition to proposed improvements to the existing Bessemer City Water Plant, the City is proposing to replace the existing rawwater intake located on Arrowood Reservoir. Proposed project plans call for the replacement of the raw water intake along with the addition of a wet well, two (2) 1000 GPM vertical turbine pumps with 75 HP motors, all related valves and piping, and associated electrical components. We anticipate that the proposed improvements will result in minimal temporary and permanent open water impacts to Arrowood Reservoir. No jurisdictional streams or wetlands were found within the proposed project area. Please give a couple of dates you are available for a meeting. 10/19/2020 10/20/2020 10/21 /2020 10/22/2020 Please attach the documentation you would like to have the meeting about. Bessemer City - New Intake Plan.pdf 1.93MB WTP Location Map.pdf 401.68KB pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/14/2020