Loading...
HomeMy WebLinkAbout20070609 Ver 1_401 Application_20070407p~.~. °'. 20070609 Office Use Only: Form Version March o5 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) I. Processing Check all of the approval(s) requested for this project: Q Section 404 Permit ^ Riparian or Watershed Buffer Rules ^ Section 10 Pet7nit ^ Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: ~Y1Ql~(t2lG~.~, 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Conceni (see the top of page 2 for further details), check here: ~ 1~ (~ V II. Applicant Information ~ ~ u 1. Owner/Applicant Infoi7nation t ASR 9 2007 Name: `T~il3f1'9C~S S `~-JC2~.( :~'~ (~ • ~ t'Yt,,~~y~1L.! _UF~t-WA7~RQUAIITY Mailing Address:_ `Zvx ~~lJ~~~ ~v~nA-~osArlosro~+~'~~~+ Telephone N>.unber:7Ca~ - (~,~ 3 - ~,~,$ ~ Fax Number: E-mail Address: 2. Agent/Consultant InfoiYnation (A signed, and dated copy of the Agent Authorization letter must he attached if the Agent has signatory authority for tht~ owner/applicant.) Name: ~~ ±Pnn:.yl,~;o, ~r~i-rah fors Company Affiliation: Mailing Address: ~I ~~/!~l)!`1 !-~/ i~~ ~'~~~~, Telephone Number: a~~„-"-t!~-~,- ~~ Fax Number: ova- ~i~a,(~ - ~ "J ~~ E-mail Address:!~!'.t°1~~t51t1i° ~ n7~r~L , (s~pl~ Updated l l/I/?005 Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must he included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size constzlction drawings rather than a sequential sheet version of the frill-size plans. If frill-size plans are reduced to a small scale such that the final version is illegible, the applicant v~rill be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: -Lc2m,~/s°e~ ~',~ , {'/ ~~ T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): `7~~o(v 3~Co ~C~G2 4. Location County: ~ Nearest Town: - ~~ ~ ~ Subdivision na e (include phase/lot number): /„~-~ ~~ ~~{ ~~ ~~,J~sp,-'~~ Pia/~~ Directions to site (include road numbers/names, landmarks, etc.): (-1]b~l~~r'lt°_ ~~~ O i'1 Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 3Co~C/S- 3~f~ °N O'ZC~B~~/. ~~~5. °W 6. Property size (acres): 7. Name of nearest receiving body of water: ~~Dl /yE G~(~~' 8. River Basin: (Note -this must be ode of North Carolina's seventeen designated major river basins. The River Basin map is available at http:/!h2o.eni-.statc.l~c.us/admi~~~s/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this app(l'i~cation: ~~s~dpxrf lea .~ ~r~~~~~ - ~~ h~z~" ~, ll1J ~"' /] Y~ ~ < ~ /~ -4 1/~'IYYI~ /11 .--~/~ ~w--v n r~" . ,. 1 - .,. L„ n ..-. ~ ~'~ t.- i . i<n ,.. a ~, _ r~ 1 il...~ ni~ ~. Updated 1 (/1/200$ Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: 11. Explain the purpose of the proposed work: ~L.~c.C.d~ ~~ kj'l.'~l~-c:~. ~Q-~ SP /1~rAiv~ n~ .lZt~ lI rn~tDr ~~'~,Nb~~DI.~ ~F^ll!'~ia Vii) o ) IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USAGE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other usefid information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and sheam evaluation and delineation forms shonld be included as appropriate. Photographs may be inchided at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Updated 1 Vl/2005 Page 7 of 12 PRE-CONSTRUCTION NOTIFICATION (PCN) APPLICATION Section III -Question 10 The proposed plan is to build a bulkhead on Lot 19 Section EE Bosher's Point in Albemarle Plantation in Hertford, NC. The purpose of this bulkhead is to build up a part of the wetland to put in a driveway up to where the house will be built. The bulkhead would start 30 feet right of the left property line. From that point, the bulkhead would be built out to the wetlands approximately 52 feet. A pipe would be place up near the road by the bulkhead to provide drainage for the wetland under the proposed driveway. The proposed bulkhead area would require approximately 138.7 cubic yards of fill. See attached lot plot. The proposed bulkhead will provide access to where the house will be built. 0 7 0 60 9 I o~r~ ~~ I ~~~.~~ ! I~~~~~<<z~ ~ ~~-..Jc c~~~: ti~ ~-I . ~~. ~~ -~ l `~ j t~'r~'~-I ~~ t ~ L--= . -~ ~r r ~~ ~~"i i ~ ,o :~ . ~~., ~ ~ C I ~` .~./''~ ~ •~''O 133, ,¢~ . `~`~i.~`J V~~~~ .. .._........ . _, ,f .~. y~'l, _ . ~Vi ~~ N ~ ~ Cn -v ~ Q',p. Q i _.~-~ ... . ~ , cy ~ ~~ ~1'~ anti ~ ~`~~ ~, ~!~ cF~ ~,~ u~ ..~`. , ... ~ ~ .~ ~~ o7•osos ',~ 4 ~ ~. ~ d a: ~~ r ~ ~~ ~. -~ ... • ., ~-~ ~ , ,~ .+, O c ~~ i~ r~ ~ F.. ~ / ~ ~-- d ""'~ ~~. r .d 4 ~ ~' ~ `'*` . m ~ ~ '~,~ ~.r ~ ' r s'~n I /7 i~ ,, ~i+, "~ ~,~ ,~r~~ Z•,,,,,~ ,~~', ,„,, , ~ 'r'~~ ~~ 91~~ ~" s 2. Individually list wetland impacts. Types of impacts include, Uut are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due t~ hctth structure and flooding. Wetland Impact Site Number (indicate on map) Type of Impact Type of Wetland (e.g., forested, marsh, herbaceous, bog, etc.) Located within 100-year Floodplain ( es/no) Distance to Nearest Stream (linear feet) Area of Impact (acres) _ ~.~ ~ ~~ ~ - 5 ~' . b y Total Wetland Impact (acres) y 3. List the total acreage (estimated) of all existing wetlands on file property:. ~ ~l G-~~f°-S 4. Individually list all intet7nittent and perennial sheam impacts. Be sure to identify temporary impacts. Stream impacts include, Uttt are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gaUions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for Uoth the original and relocated steams must Ue included. To calculate acreage, multivly Ien~th X width, then divide Uv 43,560. Stream Impact Number (indicate on ma Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length (linear feet) Area of Impact (acres Total Stream Impact (by length and acreage) 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, Utrt are not limited to fill. excavatirn~_ dred~int~_ fl~rtdinu_ ~lrainaue_ hnikhearlc etr. Open Water Impact Site Nunrbet (indicate on ma Name of Waterbody (if applicable) Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. Area of Impact (acres ~a C,r I .~n 1 eo m r ra 4, Total Open Water hnpact (acres) ,. b t.~ Updated l l/I/?005 Page 8 of 12 6. List t he cumulative im act to all Waters of the U.S. resulting from the pro-ect: Stream Impact (acres): Wetland Im act (acres): ~ ~ Open Water Impact (acres): Total Impact to Waters of the U.S. (acres) Total Stream hnpact (linear feet): ~.S Isolated Waters Do any isolated waters exist on the property? ^ Yes ©No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been detetnlined to be isolated by the USACE. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and ilhistrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dan~/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or propose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stoi-~nwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site conshaints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Li.11.A.~ ~ Sl ~-~° t 1 I t VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Updated Il/1/?005 Page 9 of 12 USAGE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource fiulctions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USAGE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Worlc in North Carolina (see DWQ website for most current version.). Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed reshictions, conservation easement, etc.), and a description of the cuu-rent site conditions and proposed method of conshtiiction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this fora. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://~~~ww.nceep.net~pa~es/i.nlicureplace.ht.n.~. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount ofNon-riparian wetland mitigation requested (acres): Arnotmt of Coastal wetland mitigation requested (acres); Updated I1/I/?005 Page 1.0 of 12 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ^ No ,~] 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether aNEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No ^ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ^ No ^ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neese), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Sepply Buffer Requirements), or other (please identify )? Yes ^ No ^ 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the Duffer multiuliers. Zone* Impact Multiplier Required (square feet) Mitieation 1 3 (2 for Catawba) 2 1.5 Total I I I J * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone ]. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. Updated I l/1/2005 Page 11 of 12 XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stoimwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No ~] Is this an after-the-fact permit application? Yes ^ No ,~ XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http:/!h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). ~v~ I ~-s~ Applicant/Agent's Signature n Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Updated 1 l/1/2005 Page 12 of 12