Loading...
HomeMy WebLinkAbout20100304 Ver 1_More Info Letter_20100608?? NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 8, 2010 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Cert. #7010 0290 0001 5628 1527 Markham Enterprises, Inc. Mr. Jerry W. Markham Post Office Box 432 Elizabeth City, NC 27907 Subject Property: Causeway Marina Bulkhead Construction Pasquotank River, Pasquotank River Basin REQUEST FOR ADDITIONAL INFORMATION Dear Mr. Markham: DWQ Project # 10-0304 Camden County On April 26, 2010, the Division of Water Quality (DWQ) received your application dated April 13, 2010 to impact 5,950 square feet of open waters to construct the proposed bulkhead with associated backfill. The DWQ has determined that your application is incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetland, streams and/or buffers on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H.0506 and 2B .0233(8) and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Avoidance and Minimization Your project proposes fill 20 feet water ward of the existing shoreline. Permit Number 3641 only allows bulkhead installation and associated fill 10 feet water North Carolina Division of Water Quality Internet: www.ncwaterqualitv.Ora 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarolina Naturally ward of the existing shoreline. It is therefore necessary to reduce water ward impacts by relocating the proposed bulkhead landward. Changes to plans and drawings should be forwarded to this Office as part of your response. Please respond in writing to the DWQ within 30 days of receipt of this letter with the requested information. If we do not hear from you within 30 days, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Roberto Scheller of the Washington Regional Office at 252-948-3940 or Ian McMillan of the DWQ Central Office at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, For Al Hodge cc: Hal Goodman, Construction Engineering Services, Inc. 401 Oversight/Express Permitting Unit USACE Washington Regulatory Field Office Doug Hogget, CAMA, Morehead City Kelly Russell, CAMA, Morehead City File Copy Filename: 10-0304