June 11, 2010
Mr. J. B. Setzer. P.E.
Division 14 Engineer
N.C. Department of Transportation
253 Webster Road
Sylva, North Carolina 28779
Natural Resources
Dee Freeman
Secretary
Subject: Stormwater Inspection
Upward Road
DWQ Project No. 081327
TIP No. R-4430
Henderson County
Dear Mr. Setzer:
On June 2, 2010, 1 conducted a stormwater inspection for TIP Project No. R-4430, NCSR 1783 Upward Road
construction project in Henderson County. The rainfall data and erosion control records appear to be
maintained in good order. Please note that all stormwater devices are to be inspected after every 0.5 inch
rainfall event.
Continue to ensure that these records are maintained during the life of the project. Please refer to the attached
inspection report for additional comments and/or recommendations. '
If you have questions, please call me at 828-296-4500.
Sincerely,
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: Aaron Powell, P.E.
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
(Selzer) R4430 Upward Road June 2010 Storrawater Inspection
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NC 28778-8211
Phone: 828-296-0500 \ FAX : 828.299-7043 One
Customer Service: 1-877-623-6748 NorthCarOllna
Internet: wwwoowaterauality,oft ;Vaturally
An Equal Oppor unity \ Affrmalive Action Employer K
Form A June 2001
Site Inspection form- Construction Stormivater Permit IIPDES NCG010000
Site Name: Aat d r'
DVIQ RD:
Inspector: c. Oe ,I u 1. DWO Inspection date. (A1)(
8. On-site representative available during ins ection? AS Yea r No
Name(s) '??
e "` `? ?
Title(s) _
Em to ersl "' _
9, Erosion and Sedimentation Control Plan (Part I. Section A: No. 2.)
Is a copy of the approved plan on site and available for review? (A9) "" ,- N° .: Not
Inspected- "
10 Rain Gauge ( Part t. Section B. No, 1.)
Is a rain gauge present on the site at the time of inspection? (At 0) " Y ,a r No `rn Not
.?-- Inspected.' '?:
11 Rain Gauge Data ( Par- 1. Section B. No. 1.). Nit
Inspected- `u
Is rain gauge data measured and recorded? (Al 1)
Data from past 14 da s.
Date S G €S' E .. ,9
Week 1
Amount:
Week?. Date:
Amount:
12 Minimum Monitoring & Record Keeping (Part I Section B. No. 31
Are inspection records of erosion & sedimentation control facilities complete & available on request.?
_ No f- Not
2 r v° r
(At ) Inspected'
Dates of documented
Week 1:
Week 2: 's
14
13. Sedimentation impacts to waters 14. Linear k of stream Im acts
Typical range of sediment depth: (A13a) to (A14)
Maximum depth of sediment: (Al 3b) 15. Photo Documentation: Were photos taken? (Al 5)
:::)r va _qr No e
Photos (1. impacted water, 2. sedimentation depths, 3. sediment control naasures, and 4. un-impacted upstream waters)
and sketch(map of where photos were taken are attached for case file -
16. Notes:
Yro)acr pers°nnec noc avm.eurc uun,.y .+.•.. ?.?? .....r
1-4