Loading...
HomeMy WebLinkAbout20081327 Ver 1_Information Letter_20100611 North Carolina Beverly Eaves Perdue Governor NCDENR Department of Environment and Division of Water Quality Colleen H. Sullins Director June 11, 2010 Mr. J. B. Setzer. P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Natural Resources Dee Freeman Secretary Subject: Stormwater Inspection Upward Road DWQ Project No. 081327 TIP No. R-4430 Henderson County Dear Mr. Setzer: On June 2, 2010, 1 conducted a stormwater inspection for TIP Project No. R-4430, NCSR 1783 Upward Road construction project in Henderson County. The rainfall data and erosion control records appear to be maintained in good order. Please note that all stormwater devices are to be inspected after every 0.5 inch rainfall event. Continue to ensure that these records are maintained during the life of the project. Please refer to the attached inspection report for additional comments and/or recommendations. ' If you have questions, please call me at 828-296-4500. Sincerely, Michael R. Parker Environmental Senior Specialist Attachment cc: Aaron Powell, P.E. Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office (Selzer) R4430 Upward Road June 2010 Storrawater Inspection SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NC 28778-8211 Phone: 828-296-0500 \ FAX : 828.299-7043 One Customer Service: 1-877-623-6748 NorthCarOllna Internet: wwwoowaterauality,oft ;Vaturally An Equal Oppor unity \ Affrmalive Action Employer K Form A June 2001 Site Inspection form- Construction Stormivater Permit IIPDES NCG010000 Site Name: Aat d r' DVIQ RD: Inspector: c. Oe ,I u 1. DWO Inspection date. (A1)( 8. On-site representative available during ins ection? AS Yea r No Name(s) '?? e "` `? ? Title(s) _ Em to ersl "' _ 9, Erosion and Sedimentation Control Plan (Part I. Section A: No. 2.) Is a copy of the approved plan on site and available for review? (A9) "" ,- N° .: Not Inspected- " 10 Rain Gauge ( Part t. Section B. No, 1.) Is a rain gauge present on the site at the time of inspection? (At 0) " Y ,a r No `rn Not .?-- Inspected.' '?: 11 Rain Gauge Data ( Par- 1. Section B. No. 1.). Nit Inspected- `u Is rain gauge data measured and recorded? (Al 1) Data from past 14 da s. Date S G €S' E .. ,9 Week 1 Amount: Week?. Date: Amount: 12 Minimum Monitoring & Record Keeping (Part I Section B. No. 31 Are inspection records of erosion & sedimentation control facilities complete & available on request.? _ No f- Not 2 r v° r (At ) Inspected' Dates of documented Week 1: Week 2: 's 14 13. Sedimentation impacts to waters 14. Linear k of stream Im acts Typical range of sediment depth: (A13a) to (A14) Maximum depth of sediment: (Al 3b) 15. Photo Documentation: Were photos taken? (Al 5) :::)r va _qr No e Photos (1. impacted water, 2. sedimentation depths, 3. sediment control naasures, and 4. un-impacted upstream waters) and sketch(map of where photos were taken are attached for case file - 16. Notes: Yro)acr pers°nnec noc avm.eurc uun,.y .+.•.. ?.?? .....r 1-4