Loading...
HomeMy WebLinkAbout20081754 Ver 1_Information Letter_20100610FWAA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Colleen H. Sullins Governor Director June 10, 2010 Mr. J. B. Setzer, P.E. Division 14 Engineer N.C. Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Subject: Inspection US Highway 25 DWQ Project 08-1754 TIP No. R-505 Henderson County Dear Mr. Setzer: Dee Freeman Secretary On June 3, 2010, I inspected the construction work on US Highway 25 between Interstate 26 and NC Highway 225 in Henderson County. Major grading and paving are underway along the entire length of the project. Review of the sediment and erosion control program found that additional attention is needed on these structures. Please ensure that all sediment and erosion control structures are maintained and that seeding and mulching are performed as needed to protect downstream waters. Please refer to the attached copy of the inspection report for additional comments regarding the inspection. If you have questions, please call me at 828-296-4500. Sincerely, ;7//? Michael R. Parker Environmental Senior Specialist Attachment cc: David Baker, USACE, Asheville Field Office. Aaron Powell Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Transportation Permitting Unit Mike Parker, Asheville Regional Office US 25 Inspection Letter June 2010 SURFACE WATER PROTECTION SECTION -Asheville Regional Office 2090 U.S. 70 Highway, Swannanoa, NO 28778-8211 Phone: 828-296-45001 FAX: 828-299-7043 i. One 7 Customer Service. 1-877-623-6748 NOrthCarOhna Internet: www.ncrvaten7ualitv.org An Equal Opportunity l Affirmative Action Employer ?????????? DWQ Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: June 2, 2010 County: Henderson Region: Asheville DOT Division: Division 14 Activity: X 401 Compliance Evaluation ? Complaint ?DWQ Follow Up Evaluation ? Other DWQ 401 #: 08-1754 NW Permit #: IP Project Name: Location of Project: U S Hiahwav 25-1-26 Connector R-505 U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County Project Complete: ?Yes X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvert ? Bottomless Arch X? Riprap Inlet/Outlet Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? On-site Stream Relocation ? Buffer Restoration X? Bank Stabilization ? Other If no, estimated date of completion: Water Quality Concerns (DWO): ? Steam Standards Violation X? Turbidity ? Evidence of spills ? Oil/Petroleum ? Solid Waste ? Failed E & S control measures X? Sedimentation Impacts ? Stormwater Permit Violation X? Fill ? Buffer Impacts (see below) ? Other Additional Wetland Impacts: ? yes X? no Estimated Acres ? Zone 1 Est Acres ? Zone 2 Est Acres Additional Stream Impacts: ? yes X? no Est Linear feet Estimated linear feet of impact: Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited DWO Site Visits for DOT Proiects Background Info Name of Waterway(s): Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek , Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch, Jones Creek Basin/ Subbasin: Broad 030501 Wetland Type: []Isolated x?Non-Isolated (Waters of US) Stream Class: []Class B ?303d Listed ?WS-11 ?WS-V ?SB X?Class C ?ORW X?Trout ?WS-111 []NSW X?HQW ?WS-I ?WS-IV ?SA ?CA Type of Authorized Impact: X?Culvert []Bottomless Culvert []Bridge []Bottomless Arch X?Riprap Inlet/Outlet Stabilization X?Fill Authorized Wetland Impacts: X?0 - 1/10'h acre ?1/1 Ph to 1/3`d acre ? 1/3`d to 1.0 acre ?> 1.0 acre Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 1,346 linear feet Additional comments: Reviewed project with DOT staff and Wright Brothers. Heavy construction is underway on the south end of the project. Some paving has taken place and approximately 25% of the project has been paved. Heavy rains continue to impact project. Some sediment and erosion control structures were in need of cleaning. Rip rap should be added at end of pipe at Y-4. Seeding and/or matting should be performed as areas are graded. It is imperative that all erosion control devices be maintained. Please continue with seeding and matting as required to protect State surface waters. US Highway 25 Inspection June 2010