Subject: Inspection
US Highway 25
DWQ Project 08-1754
TIP No. R-505
Henderson County
Dear Mr. Setzer:
Dee Freeman
Secretary
On June 3, 2010, I inspected the construction work on US Highway 25 between Interstate 26 and NC Highway
225 in Henderson County. Major grading and paving are underway along the entire length of the project.
Review of the sediment and erosion control program found that additional attention is needed on these
structures. Please ensure that all sediment and erosion control structures are maintained and that seeding and
mulching are performed as needed to protect downstream waters. Please refer to the attached copy of the
inspection report for additional comments regarding the inspection.
If you have questions, please call me at 828-296-4500.
Sincerely,
;7//?
Michael R. Parker
Environmental Senior Specialist
Attachment
cc: David Baker, USACE, Asheville Field Office.
Aaron Powell
Mark Davis, Division 14, DEO
Ed Ingle, Roadside Environmental
Transportation Permitting Unit
Mike Parker, Asheville Regional Office
US 25 Inspection Letter June 2010
SURFACE WATER PROTECTION SECTION -Asheville Regional Office
2090 U.S. 70 Highway, Swannanoa, NO 28778-8211
Phone: 828-296-45001 FAX: 828-299-7043 i. One 7
Customer Service. 1-877-623-6748 NOrthCarOhna
Internet: www.ncrvaten7ualitv.org
An Equal Opportunity l Affirmative Action Employer ??????????
DWQ Site Visits for DOT Projects
Field Sheet
DWQ representative: Michael R. Parker Date: June 2, 2010
County: Henderson Region: Asheville
DOT Division: Division 14
Activity: X 401 Compliance Evaluation ? Complaint
?DWQ Follow Up Evaluation ? Other
DWQ 401 #: 08-1754 NW Permit #: IP
Project Name:
Location of Project:
U S Hiahwav 25-1-26 Connector R-505
U S Highway 25 from NC 225 near Zirconia to Interstate 26 in Henderson County
Project Complete: ?Yes X No
Activities (DOT):
? Bridge
X? Culvert
? Bottomless Culvert
? Bottomless Arch
X? Riprap Inlet/Outlet Stabilization
? Spoil Pile
? Borrow Pit
? Wetland Mitigation
? Stream Restoration
? On-site Stream Relocation
? Buffer Restoration
X? Bank Stabilization
? Other
If no, estimated date of completion:
Water Quality Concerns (DWO):
? Steam Standards Violation
X? Turbidity
? Evidence of spills
? Oil/Petroleum
? Solid Waste
? Failed E & S control measures
X? Sedimentation Impacts
? Stormwater Permit Violation
X? Fill
? Buffer Impacts (see below)
? Other
Additional Wetland Impacts: ? yes X? no Estimated Acres
? Zone 1 Est Acres ? Zone 2 Est Acres
Additional Stream Impacts: ? yes X? no Est Linear feet
Estimated linear feet of impact:
Buffer Impacts: ?Neuse []Tar-Pam []Randleman []Catawba
Zone 1: ?Yes ?No Est linear ft/ acreage of buffer impact ac
Zone 2: ?Yes ?No Est linear ft/ acreage of buffer impact ft/ ac
Buffer Designation: []Exempt []Allowable []Allowable w/mitigation []Prohibited
DWO Site Visits for DOT Proiects
Background Info
Name of Waterway(s):
Laurel Creek, Green River, Bat Fork, King Creek, Freeman Creek ,
Lake Summit, Hill Branch, Jones Branch, Mill Creek, Laurel Branch,
Jones Creek
Basin/ Subbasin: Broad 030501
Wetland Type: []Isolated x?Non-Isolated (Waters of US)
Stream Class: []Class B ?303d Listed ?WS-11 ?WS-V ?SB
X?Class C ?ORW X?Trout ?WS-111 []NSW
X?HQW ?WS-I ?WS-IV ?SA ?CA
Type of Authorized Impact: X?Culvert []Bottomless Culvert
[]Bridge []Bottomless Arch
X?Riprap Inlet/Outlet Stabilization X?Fill
Authorized Wetland Impacts: X?0 - 1/10'h acre ?1/1 Ph to 1/3`d acre
? 1/3`d to 1.0 acre ?> 1.0 acre
Authorized Stream Impacts: ?< 150 linear feet X?> 150 linear feet 1,346 linear feet
Additional comments:
Reviewed project with DOT staff and Wright Brothers. Heavy construction is underway on the south end of the
project. Some paving has taken place and approximately 25% of the project has been paved.
Heavy rains continue to impact project. Some sediment and erosion control structures were in need of cleaning.
Rip rap should be added at end of pipe at Y-4.
Seeding and/or matting should be performed as areas are graded.
It is imperative that all erosion control devices be maintained. Please continue with seeding and matting as
required to protect State surface waters.