Loading...
HomeMy WebLinkAbout20200967 Ver 2_2020-11-06_Davis Park East Hopson Road Widening- Full Set for Submittal_20201113386.6 385.5 385.4386.6 VICINITY MAP GRAPHIC SCALE PLANS PROFILE (HORIZONTAL) PROFILE (VERTICAL) 0 5025 0 5025 0 105 BYDATEAS SHOWNREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAR0.0011/6/2020TITLE SHEETA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_tsh.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583985' EAST OF DAVIS DRIVE (SR 1999) TO S MIAMI BOULEVARD (NC 54) LOCATION: ALONG HOPSON ROAD (SR 1978) FROM DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTS DAVIS PARK EAST - HOPSON ROAD WIDENING OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST for the specific purpose and client. reliance on this document instrument of service, is intended only Associates, Inc. for which it was prepared. Reuse of and improper Horn and Associates, Inc. shall be without liability to Kimley-Horn and herein, as an without written authorization and adaption by Kimley- This document, together with the concepts and designs presented BEFORE YOU DIG IT'S THE LAW N.C. ONE-CALL CENTER CALL 1 800 632-4949 STOP ENGINEER: SURVEYOR: DEVELOPER: -L- Sta. 18+70.71 BEGIN PROJECT PROJECT BEGIN 800.733.5646 DURHAM, NC 27713 2905 MERIDIAN PKWY. MCADAMS SHEET NO.DESCRIPTION TITLE SHEET CONVENTIONAL SYMBOLS TYPICAL SECTIONS R0.02 R0.01 R0.00 PROJECT NOTES ROADWAY CROSS SECTIONSR6.00 THRU 6.09 EROSION CONTROL PLAN R 2.00R2.01 -L- Sta. 44+01.87 END PROJECT -L- HOPSON ROAD (SR 1978) NOT TO SCALE (54 (54 (54 EMPEROR BLVD.S MIAMI BLVD. (NC 54)SLATER RD. PROJECT END TO SLATER RD HOPSON RD. (SR 1978) SLATER RD. (NC 54) R1.00 THRU R1.01 DISTRIBUTION DRIVES MIAMI BLVD (NC 54)R4.00 THRU R4.01 R5.00 THRU R5.03 DAVIS DRIVE (SR 1999)KEYSTONE PARK DRIVE TO DAVIS DR (SR 1999) ORLANDO, FL 32803 SUITE 100 600 E. COLONIAL DR. RESEARCH TRIANGLE, LTD. R2.00 THRU 2.01 PLAN SHEETS R2.02 PROFILE SHEET R3.00 THRU R3.08 R1.05 DRAINAGE DETAILS TRAFFIC MANAGEMENT PLAN PAVEMENT MARKING AND SIGNING PLAN PAGE ROAD DESIGN DATA 2020 ADT VOLUME 15,000 VPD 22,000 VPD2040 ADT VOLUME % TRUCKS 2% DESIGN SPEED 40 MPH chad.beck@kimley-horn.com 919.677.2000 CHADWICK BECK, P.E. DURHAM, NC 27701 SUITE 200 300 MORRIS ST. KIMLEY-HORN AND ASSOCIATES, INC. R1.02 THRU R1.04 TYPICAL SECTIONS R7.00 RAILROAD CROSSING FIGURE APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECTNORTH CAROLINAR0.01 A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCIWDAHC PROJECT NOTESNTSDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_tsh.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583013276001 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST UTILITY NOTES TO BE RELOCATED OUT OF THE PROPOSED PAVEMENT. WATER METER BOXES THAT ARE ENCOUNTERED WITHIN THE PROPOSED PAVEMENT SECTION ARE 3. WORK. PROPOSED PAVEMENT SECTION ARE TO BE RAISED OR LOWERED TO MATCH THE ADJACENT FINISHED WATER METER BOXES THAT ARE ENCOUNTERED WITHIN THE PROJECT LIMITS OUTSIDE THE 2. RAISED OR LOWERED TO MATCH THE ADJACENT FINISHED WORK. WATER VALVE BOXES THAT ARE ENCOUNTERED WITHIN THE PROJECT LIMITS ARE TO BE 1. GENERAL NOTES ISSUED. TREE PROTECTION FENCING SHALL BE INSTALLED AND INSPECTED BEFORE THE GRADING PERMIT IS AND SAFETY REQUIREMENTS. ENCOUNTERED. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLAST ROCK IS EXCAVATE BENCHES WITH A MAXIMUM DEPTH OF 3'. WHERE FILL IS TO BE PLACED ON EXISTING SLOPES STEEPER THAN 4:1, CONTRACTOR SHALL REFER TO ROADWAY PLAN FOR HORIZONTAL DIMENSIONS. PROFILES/SUPERELEVATIONS ARE TO BE USED IN CASE OF DISCREPANCY. PROPOSED CONTOURS AND GUTTER GRADIENTS ARE APPROXIMATE. PROPOSED ROADWAY BY THE OWNER AND PROPERLY DISPOSED OF. ALL DEMOLITION DEBRIS AND OTHER EXCESS MATERIAL SHALL BE HAULED OFF-SITE AS DIRECTED FROM THE DEPARTMENT'S MATERIALS AND TESTS UNIT. DEPARTMENT. COPIES OF THESE MODIFIED TESTING PROCEDURES ARE AVAILABLE UPON REQUEST ADHERE TO NCDOT REQUIREMENTS, IN ACCORDANCE WITH AASHTO T99 AS MODIFIED BY THE ALL GRADING / SOIL COMPACTION OPERATIONS WITHIN THE LIMITS OF STATE RIGHT OF WAYS SHALL MAN-MADE FILLS AND REFUSE DEBRIS DERIVED FROM ANY SOURCE. OTHER NON-COMPATIBLE SOIL TYPE MATERIAL. UNSATISFACTORY MATERIALS ALSO INCLUDE ALL MATERIALS USED FOR BACKFILL SHALL BE FREE OF WOOD, ROOTS, ROCKS, BOULDERS, OR ANY ADJUSTMENTS AND/OR RELOCATIONS. GRADING CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANIES FOR ANY REQUIRED UTILITY GRASS OR OTHER GROWTH TO PREVENT EROSION. UPON COMPLETION OF PERMANENT DRAINAGE FACILITIES AND THE ESTABLISHMENT OF A STAND OF SILTATION ORDINANCES. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL DEVICES CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE STATE AND LOCAL EROSION, CONSERVATION, AND PREVENT SILT AND CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES. SHOWN ON THESE PLANS, TO BEST UTILIZE THE EROSION CONTROL DEVICES IN PLACE, AND TO FENCES, DIVERSION DITCHES, BERMS, OR OTHER METHODS AS REQUIRED TO DIRECT DRAINAGE AS ADDITION TO THE MEASURES SHOWN IN THESE PLANS, THE CONTRACTOR SHALL USE INTERIM SILT CONTRACTOR SHALL MAINTAIN ADEQUATE SITE DRAINAGE DURING ALL PHASES OF CONSTRUCTION. IN ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE, AND AS SHOWN ON THESE PLANS. THE NECESSARY TO OBTAIN A DENSE STAND OF GRASS. BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED, AND MULCHED AS WHEN AND AS NECESSARY, AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED DEVICES TO BE INSTALLED PRIOR TO COMMENCING CONSTRUCTION. REFER TO EROSION CONTROL SHEETS FOR CLEARING LIMITS AND TEMPORARY EROSION CONTROL ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. BEGINNING AND ENDING AND AT STRUCTURES AND EXISTING PAVEMENT AS DIRECTED BY THE GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE ADJUSTED AT THEIR THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. GRADING 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. PAVING/CURBING SECTIONS. SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL 225.05 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD. 225.04 & PAVEMENT IS BEING WIDENED OR WHERE NEW CURB AND GUTTER IS PROPOSED. CONTRACTOR SHALL SAWCUT & REMOVE ANY THE EXISTING PAVEMENT WHEN THE EXISTING ON THE PLANS AT APPROXIMATE LOCATIONS. ALL RAMPS SHALL COMPLY WITH THE LATEST NCDOT STANDARDS. WHEELCHAIR RAMPS ARE SHOWN REQUIREMENTS AND THE "NORTH CAROLINA STATE BUILDING CODE, VOL 1-C ACCESSIBILITY CODE." ALL HANDICAP RAMPING, STRIPING, AND PAVEMENT MARKINGS SHALL CONFORM TO ADA SHALL CONFORM TO MUTCD, AND NCDOT STANDARDS. ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES ON PUBLIC STREETS GRADE 60, AND SHALL BE SUPPORTED BY BAR CHAIRS. ALL REINFORCING STEEL SHALL BE NEW DOMESTIC BILLET STEEL CONFORMING TO ASTM A-615, SPECIFICATIONS. PROCEDURES THAT THE WORK CONSTRUCTED DOES MEET THE REQUIREMENTS OF THE NCDOT OWNER. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SHOW BY STANDARD TESTING TESTING LABORATORY AND THE PAYMENT OF SUCH TESTING SERVICES SHALL BE MADE BY THE BE PERFORMED BY AN APPROVED AGENCY FOR TESTING MATERIALS. THE NOMINATION OF THE TESTING OF MATERIALS REQUIRED FOR THE CONSTRUCTION OF THE PAVING IMPROVEMENTS SHALL RADIUS POINTS IS 1.5 FEET. ALL JOINTS SHALL BE SEALED WITH JOINT SEALANT. ALL CURB JOINTS SHALL EXTEND THROUGH THE CURB. MINIMUM LENGTH OF OFFSET JOINTS AT PLACEMENT. MATERIAL TO BE USED SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO CONDITION ALL FILL PER THE PROJECT GEOTECHNICAL ENGINEER'S SPECIFICATIONS. THE FILL THE CONTRACTOR SHALL CLEAR AND GRUB THE SITE AND PLACE, COMPACT, AND MOISTURE PROVIDE A SMOOTH SURFACE FOR PAVING. LEVELING COURSE OF SANDY CLAY OR CLAYEY SAND (P.I. BETWEEN 4 AND 15) AS NEEDED TO IS ENCOUNTERED AT FINAL SUB GRADE ELEVATION, THE EXPOSED ROCK SHALL BE TOPPED WITH A ENGINEER. FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 8" LIFTS. IN AREAS WHERE ROCK UNLESS OTHERWISE SHOWN ON THE CONSTRUCTION PLANS OR AS DIRECTED BY THE GEOTECHICAL A MINIMUM DENSITY OF 100 PERCENT OF ASTM D-1557 DENSITY AT OPTIMUM MOISTURE CONTENT ALL PAVEMENT SUB GRADES SHALL BE SCARIFIED TO A DEPTH OF 8 INCHES AND COMPACTED TO EARTHWORK. NECESSARY ENGINEERING AND SURVEYING FOR LINE AND GRADE CONTROL POINTS RELATED TO PAVEMENT AND OTHER ITEMS ESTABLISHED IN THE PLANS. THE CONTRACTOR SHALL PROVIDE ALL BEFORE ANY EARTHWORK IS DONE, THE CONTRACTOR SHALL STAKE OUT AND MARK THE LIMITS OF OF 10' SHALL BE MADE TO CONFORM TO THE EXISTING HEIGHTS AND SHAPES. WHERE PROPOSED CURB AND GUTTER TIES TO EXISTING CURB OR CURB AND GUTTER, A TRANSITION LIMITS OF OFFSITE IMPROVEMENTS NOT WITHIN FLOODPLAIN. OF THE PROJECT ARE KEPT CLEAN AT ALL TIMES OR A WASH STATION WILL BE REQUIRED. CONTRACTOR TO ENSURE THAT ALL STREETS WITHIN THE LIMITS OF THE PROJECT AND IN FRONT OCCUPANCY (CO). FENCING SHALL BE REMOVED PRIOR TO THE FINAL SITE INSPECTION FOR THE CERTIFICATE OF ALL TREE PROTECTION FENCING SHALL BE MAINTAINED UNTIL ALL SITE WORK IS COMPLETED. THE APPROVAL OF NCDOT. LANDSCAPING, GRADING, BUILDING ELEVATIONS, LIGHTING, OR UTILITIES WILL BE MADE WITHOUT THE NO CHANGES TO ANY ASPECT OF THIS ROADWAY PLAN, INCLUDING BUT NOT LIMITED TO, DETAILS AND ENCROACHMENT AGREEMENTS. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CURRENT NCDOT STANDARDS, SPECIFICATIONS, ROADWAYS MUST BE CAPABLE OF SUPPORTING FIRE APPARATUS DURING CONSTRUCTION. ELEVATIONS AND SLOPES. MAIN, GAS, AND WIRE UTILITY STRUCTURES SHALL BE ADJUSTED TO MATCH PROPOSED FINISHED THE FRAMES AND COVERS OF ALL EXISTING AND PROPOSED DRAINAGE, SANITARY SEWER, WATER THE ENGINEER. APPROVALS PRIOR TO COMMENCING CONSTRUCTION. NCDOT ENCROACHMENTS SHALL BE OBTAINED BY CONTRACTOR IS RESPONSIBLE FOR VERIFYING OR OBTAINING ALL REQUIRED PERMITS AND CONTRACTOR SHALL ARRANGE THE MEETING WITH NCDOT AND THE CITY OF DURHAM. A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONSTRUCTION STAKEOUT FOR THIS PROJECT SHALL BE PROVIDED BY THE CONTRACTOR. INCONSISTENCIES, OR AMBIGUITIES SHALL BE DONE AT THE CONTRACTOR'S RISK. AMBIGUITIES. WORK DONE BY THE CONTRACTOR AFTER HIS DISCOVERY OF SUCH DISCREPANCIES, REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS SHALL BE IMMEDIATELY ANY DISCREPANCIES FOUND BETWEEN THE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS OR SHALL BE INSTALLED PER THE MANUFACTURERS' SPECIFICATIONS. ALL MANUFACTURERS' PRODUCTS SPECIFIED IN THESE PLANS OR USED AS APPROVED ALTERNATES DEVICES," AND AS FURTHER DIRECTED BY THE TOWN AND STATE INSPECTORS. IN CONFORMANCE WITH THE TRAFFIC CONTROL PLAN, THE "MANUAL OF UNIFORM TRAFFIC CONTROL TRAFFIC CONTROL ON PUBLIC STREETS IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE SHALL REPAIR, AT HIS OWN EXPENSE, ANY EXISTING UTILITIES DAMAGED DURING CONSTRUCTION. TELEPHONE RISERS, WATER VALVES, ETC. DURING ALL CONSTRUCTION PHASES. THE CONTRACTOR THE CONTRACTOR SHALL SALVAGE AND PROTECT ALL EXISTING POWER POLES, SIGNS, MANHOLES, SITE. SERVICE (ULOCO) AT 1-800-632-4949 FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA ONE-CALL UTILITIES LOCATION CONSTRUCTION SITE. AT LEAST 48 HOURS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION PUBLIC OR PRIVATE UTILITIES (SHOWN OR NOT SHOWN) WHICH LIE IN OR ADJACENT TO THE CONTRACTOR IS RESPONSIBLE FOR HORIZONTALLY AND VERTICALLY LOCATING AND PROTECTING ALL THE LOCATION AND SIZE OF EXISTING UTILITIES AS SHOWN IS APPROXIMATE ONLY. THE LIMITED TO TRENCH SAFETY, DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL JOBSITE SAFETY, INCLUDING BUT NOT OTHERWISE NOTED IN THESE PLANS. THESE STANDARDS, SPECIFICATIONS, OR PLANS, THE MOST STRINGENT SHALL GOVERN UNLESS SPECIFICATIONS, AND GENERAL DESIGN STANDARDS. IN THE EVENT OF CONFLICT BETWEEN ANY OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL REGULATIONS, CITY OF DURHAM ROAD AND BRIDGE STANDARDS, THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK, CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) ROAD AND BRIDGE SPECIFICATIONS, THE NCDOT WORK IN THIS PROJECT SHALL CONFORM TO THESE PLANS, THE LATEST EDITIONS OF THE NORTH 17. 16. 15. 14. 13. 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE *S.U.E. = Subsurface Utility Engineering Note: Not to Scale CONVENTIONAL PLAN SHEET SYMBOLS Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut Proposed Slope Stakes Fill Proposed Wheel Chair Ramp Curb Cut for Future Wheel Chair Ramp WCR CCFR Existing Metal Guardrail Existing Cable Guiderail Proposed Guardrail Equality Symbol Pavement Removal Baseline Control Point RIGHT OF WAY: Existing Right of Way Marker Existing Right of Way Line h Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker Proposed Right of Way Line with Existing Control of Access Proposed Control of Access Proposed Right of Way Line C F:Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement HYDROLOGY: Hydro, Pool or Reservoir Flow Arrow Disappearing Stream Spring Swamp Marsh ;zvW Proposed Lateral, Tail, Head Ditch False Sump Proposed Cable Guiderail MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall MINOR: Head and End Wall Pipe Culvert Footbridge Paved Ditch Gutter UTILITIES: ROADS AND RELATED FEATURES: Existing Power Pole Proposed Power Pole P U/G Power Cable Hand Hole Power Manhole Power Line Tower Power Transformer Existing Joint Use Pole Proposed Joint Use Pole Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Booth Telephone Pedestal U/G Telephone Cable Hand Hole R }Tp ] Q l e ] / b H-Frame Pole O O POWER: TELEPHONE: Telephone Cell Tower Recorded U/G Power Line Recorded U/G Telephone Cable Designated U/G Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated U/G Telephone Conduit (S.U.E.*) Recorded U/G Fiber Optics Cable WATER: Water Manhole Water Meter Water Valve Water Hydrant Recorded U/G Water Line 4 I H a TV: TV Satellite Dish TV Pedestal TV Tower U/G TV Cable Hand Hole Recorded U/G TV Cable Recorded U/G Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*) r | I ] GAS: Gas Valve Gas Meter Recorded U/G Gas Line n c SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) d o A/G Water Above Ground Gas Line A/G Gas Above Ground Water Line Above Ground Sanitary Sewer A/G Sanitary Sewer MISCELLANEOUS: Utility Pole O F S 3 Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line ? CONC CONC WW vvDrainage Box: Catch Basin, DI or JB Storm Sewer Storm Sewer Manhole m U/G Tank; Water, Gas, Oil A/G Tank; Water, Gas, Oil BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence g F 123 Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Area Outline Gas Pump Vent or U/G Tank Cap Church School Dam Sign Small Mine Well V M WW S x Foundation S Building y y VEGETATION: Single Tree X Y Vineyard Single Shrub Hedge Woods Line Orchard Vineyard RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled S FLOW Designated U/G Power Line (S.U.E.*) Designated U/G Fiber Optics Cable (S.U.E.*) Designated U/G Water Line (S.U.E.*) Designated U/G TV Cable (S.U.E.*) Designated U/G Gas Line (S.U.E.*) U/G Test Hole (S.U.E.*) WLB EIP BECM CONC HW CB CSX TRANSPORTATION MILEPOST 35 SWITCH Cemetery EXISTING STRUCTURES: Parcel / Sequence Number E AATUR End of Information E.O.I. Abandoned According to Utility Records WLB EAB EPB R W R W R W C A E TDE PDE PUE S P P T T TC TC T FO T FO W W TV TV TV FO TV FO G G SS FSS FSS ?UTL Jurisdictional Stream JS Buffer Zone 1 Buffer Zone 2 BZ 1 BZ 2 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAR0.02SYMBOLSCONVENTIONAL NTSDRAWN BY: TDW Stream or Body of Water 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_tsh.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC NTSTYPICAL SECTIONSDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_typ.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST R1.01 GRADE POINT TYPICAL SECTION NO. 3 CL -L- HOPSON ROAD ROW EXIST VAR11'3.5' 0.5' R1 C2 UD1E1 T2:1 T O 4 :12:1 TO 4:1 2' 0.02 -L- STA. 34+00.00 TO STA 37+41.00 11'11'11' VARVAR GROUND EXISTING 1.5'1.5' 28.5'-30.25' 9'-16.5' 10' PATH 1' C1S 1-1/2" MILL SAWCUT 1' D1 E1 C2 R2 U VAR W D1E1 C2R2 1-1/2" MILL R1 T 2:1 TO 4:1 2 :1 T O 4:1 0.02 GROUND EXISTING D1 J1 C2 5.5' 0.5' 2' 1' SAWCUT VAR VAR 36'-44.75 EXIST 28.5'-30.25' ROW EXIST 47'-56' TYPICAL SECTION NO. 4 CL -L- HOPSON ROAD ROW EXIST 11'11' R1 C2 C1 UUD1J1 T EXIST 1-1/2" MILL -L- STA. 41+50.00 TO STA 44+01.87 EXIST 11'11'11' 0.75' 0.75' 50'-56' VAR33' W 1-1/2" MILL VAR 29.5'-34' GRADE POINTR3 VAR 2 :1 T O 4:1 2:1 TO 4:1 0.02 GROUND EXISTING S 0.5' 10' PATH 1'2.5' ROW PROP PAVEMENT SCHEDULE C1 C2 PROPOSED 2'-6" CONCRETE CURB & GUTTER PROPOSED 5" MONOLITHIC CONCRETE ISLAND (KEYED-IN) D1 E1 R1 T U AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE TYPE I19.OC, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. PROPOSED APPROX 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, EXISTING PAVEMENT EARTH MATERIAL AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS PROPOSED APPROX 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, EXISTING MONOLITHIC CONCRETE ISLAND S PROPOSED 4" CONCRETE SIDEWALK PROPOSED 1'-6" CONCRETE CURB & GUTTERR2 R3 R4 W C3 LAYERS NOT LESS THAN 1.5" IN DEPTH OR GREATER THAN 2" IN DEPTH. AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED IN PROPOSED VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, AT IN LAYERS NOT LESS THAN 2.5" IN DEPTH OR GREATER THAN 4" IN DEPTH. AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED PROPOSED VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE. TYPE I19.0C, D2 E2 IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 5" IN DEPTH. AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED PROPOSED VAR. DEPTH ASPHALT CONCRETE BASE COURSE TYPE B25.OC, VARIABLE DEPTH ASPHALT OVERLAY (SEE DETAIL W)MATCHLINE BMATCHLINE BGRADE POINT D1 E1 C2 R5 D1J1MATCHLINE BMATCHLINE B6.5' CL -L- HOPSON ROAD TYPICAL SECTION NO. 3B -L- STA. 34+88.00 TO STA 35+49.00 6.5' 2' PS PS 2' R5 PIER BRIDGE EXIST EXIST VAR 1.5'1.5' C2MATCHLINE AMATCHLINE CR5 SINGLE FACED PRECAST CONCRETE BARRIER 3.5' 0.5' R1 T2:1 T O 4 :1 2:1 TO 4:1 2' 0.02 GROUND EXISTING 10' PATH 1' S MATCHLINE AE1 T T TYPICAL SECTION NO. 3A -L- STA. 34+42.00 TO STA 36+32.00 R1 T 2:1 TO 4:1 2:1 T O 4 :10.02 GROUND EXISTING 5.5' 0.5' 2'MATCHLINE CE1 TYPICAL SECTION NO. 3C GROUND EXISTING 46.5' 7.5'-12' -L- STA. 32+99.00 TO STA 38+21.00.00 0.5' 0.5' 0.5' 0.5' 0.5' 0.5'0.5' AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE BASE COURSE TYPE B25.OC, J1 PROPOSED 8" AGGREGATE BASE COURSE DEPTH PRIOR TO CONSTRUCTION. MINIMUM DEPTH. CONTRACTOR TO FIELD VERIFY LOCATION AND SHOWN IN CROSS SECTIONS IS APPROXIMATE LOCATION ASSUMING 3. EXISTING WATERLINE, FORCE MAIN, AND SANITARY SEWER LINE PLACE OF THE 8" OF AGGREGATE BASE COURSE (J1). 4" OF ASPHALT BASE COURSE TYPE B25.0C (E1) SHOULD BE USED IN 2. IN PAVEMENT WIDENING SECTIONS NARROWER THAN 6' IN WIDTH 1. REFER TO PLAN SHEETS FOR VARIABLE WIDTHS. NOTES: SEE NOTE 2 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC NTSTYPICAL SECTIONSDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_typ.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST R1.00 TYPICAL SECTION NO. 1 CL -L- HOPSON ROAD ROW EXIST ROW EXIST 12'11'5.5' 0.5' R1 C2 C1 UUD1J1 T 2 :1 T O 4:1 2:1 TO 4:1 EXIST EXIST 2' 0.02 1-1/2" MILL -L- STA. 18+70.71 TO STA 20+25.00 GROUND EXISTING EXISTEXIST VAR VAR 11' GRADE POINT 11'-12' EXIST 0.75' 0.75' 0'-5.5' VAR11'-14' 54'-59' VAR 30.25'-33.25'30.25'-33.25' VAR 65'-72' GROUND EXISTING TYPICAL SECTION NO. 2 CL -L- HOPSON ROAD ROW EXIST VAR11'VAR 0.5' R1 C2 UD1J1 T2:1 T O 4 :1 2:1 TO 4:1 2' 0.02 -L- STA. 20+25.00 TO STA 34+00.00 11'11'11' VARVAR GROUND EXISTING VAR 28.5'-33' 1.5'1.5' 28.5'-30.25' VAR 9'-16.5' C1 1-1/2" MILL 10' PATH 1' WS -L- STA. 37+41.00 TO STA 41+52.00 1-1/2" MILL SAWCUT 1' D1 E1 C2 R2 U VAR W D1E1 C2R2 1-1/2" MILL R1 T 2:1 TO 4:1 2:1 T O 4 :10.02 GROUND EXISTING D1 J1 C2 5.5' 0.5' 2' 1' SAWCUT ROW PROP VAR VAR 44.75'-55.75 R3 MIN.MIN.3" C1 E2 2 •" C3 D2 WEDGING DETAIL FOR RESURFACING W MATCHLINE AMATCHLINE AMATCHLINE BGRADE POINT VAR MATCHLINE AMATCHLINE ACL -L- HOPSON ROAD TYPICAL SECTION NO. 2A U VAR 8.25'-11' VAR 8.25'-9.84' 0'-11' VAR 5.5'-16.5' W R3 0.75'0.75' 1-1/2" MILL -L- STA. 20+41.00 TO STA 22+41.00 (LT) -L- STA. 39+15.00 TO STA 41+52.00 (RT) R1 T 2:1 TO 4:1 2 :1 TO 4:1 0.02 GROUND EXISTING VAR 0.5' 2'MATCHLINE BTYPICAL SECTION NO. 2B -L- STA. 20+23.78 TO STA 20+74.00 E1 3.5'-10.5' 5' SIDEWALK 1' -L- STA. 28+23.45 TO STA 29+15.03 -L- STA. 38+96.00 TO STA 41+42.00 36'-50' 0'-11' T T BY OTHERS IMPROVEMENTS** -L- STA. 20+65.00 TO 31+00.00 CONSTRUCTED PRIOR TO CONSTRUCTION IMPROVEMENTS BY OTHERS TO BE -L- STA. 25+34.00 TO STA 32+20.00 (LT & RT) 0'-3.5' S 0.5' 0.5'0.5' 0.5' 0.5'0.5' PAVEMENT SCHEDULE C1 C2 PROPOSED 2'-6" CONCRETE CURB & GUTTER PROPOSED 5" MONOLITHIC CONCRETE ISLAND (KEYED-IN) D1 E1 R1 T AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE TYPE I19.OC, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. PROPOSED APPROX 1.5" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, EXISTING PAVEMENT EARTH MATERIAL AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO LAYERS PROPOSED APPROX 3" ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, EXISTING MONOLITHIC CONCRETE ISLAND S PROPOSED 4" CONCRETE SIDEWALK PROPOSED 1'-6" CONCRETE CURB & GUTTERR2 R3 R4 W C3 LAYERS NOT LESS THAN 1.5" IN DEPTH OR GREATER THAN 2" IN DEPTH. AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED IN PROPOSED VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE TYPE S9.5C, AT IN LAYERS NOT LESS THAN 2.5" IN DEPTH OR GREATER THAN 4" IN DEPTH. AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH TO BE PLACED PROPOSED VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE. TYPE I19.0C, D2 E2 IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER THAN 5" IN DEPTH. AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO BE PLACED PROPOSED VAR. DEPTH ASPHALT CONCRETE BASE COURSE TYPE B25.OC, VARIABLE DEPTH ASPHALT OVERLAY (SEE DETAIL W) R5 SINGLE FACED PRECAST CONCRETE BARRIER AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD. PROPOSED APPROX. 4" ASPHALT CONCRETE BASE COURSE TYPE B25.OC, J1 PROPOSED 8" AGGREGATE BASE COURSE DEPTH PRIOR TO CONSTRUCTION. MINIMUM DEPTH. CONTRACTOR TO FIELD VERIFY LOCATION AND SHOWN IN CROSS SECTIONS IS APPROXIMATE LOCATION ASSUMING 3. EXISTING WATERLINE, FORCE MAIN, AND SANITARY SEWER LINE PLACE OF THE 8" OF AGGREGATE BASE COURSE (J1). 4" OF ASPHALT BASE COURSE TYPE B25.0C (E1) SHOULD BE USED IN 2. IN PAVEMENT WIDENING SECTIONS NARROWER THAN 6' IN WIDTH 1. REFER TO PLAN SHEETS FOR VARIABLE WIDTHS. NOTES: SEE NOTE 2 SEE NOTE 2 SEE NOTE 2 U APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC NTSDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_typ.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST R1.02SHEETDRAINAGE SUMMARY APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC NTSDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_typ.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST SHEETDRAINAGE SUMMARY R1.03 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINAA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC NTSDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_typ.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST SHEETDRAINAGE SUMMARY R1.04 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\013276001_psh_2D-1.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST R1.052:1D B ( Not to Scale) Flatter4:1 or SPECIAL LATERAL BASE DITCH FROM STA. 35+80 TO STA. 36+30 -L- (LT) DETAIL 2 B= 2.0 Ft. Min. D= 1.0 Ft. Ground Natural Slope Fill ( Not to Scale) SPECIAL LATERAL 'V' DITCH 3:1D FROM STA. 38+70 TO STA. 39+75 -L- (LT) FROM STA. 20+50 TO STA. 22+60 -L- (LT) Min. D= 1.0 Ft. DETAIL 1 Ground Natural Flatter4:1 or Slope Fill FROM STA. 37+50 TO STA. 39+00 -L- (RT) Fill Slope2:1 or Flatter b= 2.0 Ft. d= 2.0 Ft. Type of Liner= Class 'B' Rip-Rap b DETAIL 3 Ground Natural ( Not to Scale) TOE PROTECTION d Geotextile DRAINAGE DETAILSAPPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE VAN VAN VAN VAN DN UP E ICV E GTV C C WV BPFBPF GTS C C WV WV WV WVWV WV WV WV WV HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH T T 1 T 2 T 3 T 4 5 T T 6 T 7 P W W W W W W S YARD INLET YARD INLET YARD INLET YARD INLET 8.70 AC. 407 DAVIS DRIVE D.B. 7361, PG. 42 PIN NO. 0747-03-13-4998 0.85 AC. 4511 HOPSON ROAD PIN NO. 0747-03-14-6630 D.B. 4697, PG. 396 D.B. 6301, PG. 761 4523 HOPSON ROAD 0.70 AC. 4603 HOPSON ROAD D.B. 8231, PG. 151 PIN NO. 0747-03-24-0620 3.17 AC. 4524 HOPSON ROAD D.B. 989, PG. 567 PIN NO. 0747-03-14-9163 0.86 AC. 4608 HOPSON ROAD D.B. 287, PG. 107 PIN NO. 0747-03-24-1187 PIN NO. 0747-03-23-1684 10.14 AC. 4610 HOPSON ROAD D.B. 2428, PG. 411 PIN NO. 0747-03-23-7335 11.95 AC. 4700 HOPSON ROAD D.B. 7072, PG. 284 D.B. 8468, PG. 30 PIN NO. 0747-03-24-6764 21.07 AC. 4701 HOPSON ROAD PIN NO. 0747-03-14-8632 NC REGION NO 15 EXCHANGE LLC MALLETT, ROBERT H. SEARLS, WENDY L. PROCTOR, RAYMOND M. PROCTOR, RAYMOND M. PROCTOR, RAYMOND M. NC DEPT. OF TRANSPORTATION DAVIS PARK EAST POD EF LLC. PRESCHOOL ENTERPRISES, LLC BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_psh_4.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST MATCHLI NE -L- STA. 32+50.00 (SEE SHEET R2.01)PLAN VIEWR2.00 CONCRETE ISLAND 5" MONOLITHIC LIMITS OF MILL AND OVERLAY NCDOT STD. 848.02. 2. ALL DRIVEWAYS SHALL BE CONSTRUCTED PER UNLESS OTHERWISE NOTED (APPLIES TO ALL SHEETS) 1. RADII DIMENSIONS ARE TO THE EDGE OF PAVEMENT GENERAL SHEET NOTES: APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 0101 0102 0107 0111 0112 0117 0118 0116 0119 0120 0114 0115 0113 0108 0109 0110 0106 0105 0103 0104 0121 0122 0123 0124 0126 0125 0134 0133 0127 0128 0130 0129 0135 0131 0132 15" RCP-IV RCP-IV 15" 15" RCP-IV 15" RCP-IV EST 7 SY GFD EST 2 TONS CLASS 'B' RIP RAP REMOVE SEE DETAIL 1/SHEET R1.02 SPECIAL LATERAL 'V' DITCH 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV EXIST 18" RCP COLLAR & EXTEND 18" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV CB-G 15" RCP-IV 15" RCP-IV EST 7 SY GFD EST 2 TONS CLASS 'B' RIP RAP EST 7 SY GFD EST 2 TONS CLASS 'B' RIP RAP DI DI DI CB-G CB-G CB-G DI DI CB-G CB-G CB-G DI CB-G CB-G DI DI CB-G CB-F CB-F CB-G CB-G DI DI DI CB-G CB-G CB-G 15" CSP W/ ELBOWS EST 10 SY GFD EST 3 TONS CLASS 'B' RIP RAP SYSTEM RETAIN SYSTEMREMOVE REMOVE SYSTEM REMOVE REMOVE SYSTEM RETAIN 18" RCP-IV SYSTEM REMOVE 15"RETAI N15" RETAIN 15' RETAIN SYSTEM RETAIN CONDITION. EXPECTED TO REMAIN IN GOOD VEGETATED AND STABLE. EXISTING OUTFALL IS HEAVILY CONDITION. TO REMAIN IN GOOD AND STABLE. EXPECTED HEAVILY VEGETATED EXISTING OUTFALL IS SYSTEM REMOVE CONDITION. EXPECTED TO REMAIN IN GOOD WITH DENSE VEGETATION AROUND OUTLET. EXISTING OUTFALL IS STABLE GUTTERTIE TO EXISTING CURB &1 2 TIE TO EXISTING SIDEWALK TIE-IN NOTES: 100' LT TURN LANE 30.25'202530-L- PC Sta. 18+57.00 -L- PT Sta. 23+85.72 -L- PC Sta. 28+00.06 -L- PT Sta. 31+67.53 PI Sta 21+26.57 D L = 528.72' T = 269.57' R = 1,100.00' PI Sta 29+84.86 D L = 367.48' T = 184.80' R = 1,400.00' -L-2.75'8.25' E XI S T 41.25'30.25'2.75'8.25'2.75'8.25' 100' LT TURN LANE TAPER 150' LANE TRANSITION 100' LT TURN LANE TAPER 150' LT TURN LANE 100' RT TURN LANE 100' RT TURN LANE TAPER 200' LT TURN LANE 100' LT TURN LANE TAPER + 4 1. 0 0+41.00+41.00+16.00+41.00+91.00+34.00+16.00+91.00+84.00+02.00+20.00+02.00+02.00+20.00EXI S T30.25'5.5'5.5'5.5'41.25'30.25'11'11'11'11'11'11'11'11'11'11'11'11'30.25' -L- -L- (SR 1978) HOPSON ROAD KEYSTONE PARK DRI VEDRI VEDI STRI BUTI ON 30'R 30'R 45'R 30'R 30'R 30'R 30'R 30'R 30'R TYPE 1 TYPE 1 TYPE 1 TYPE 1 TYPE 3 TYPE 4 TYPE 3 TYPE 3 TYPE 3 TYPE 4 TYPE 3 12' DW 12' DW 20' DW41.25' 75' RT TURN TAPER 12' DW 065050403403020100010206030201000102010203TURN LANE 25' RT 100' RT TURN LANE TAPER +34.00+20.00+25.00+64.50+76.50+92.50TYP45' INC.034+34.72+52.72+97.72TYP 45' INC.+65.06+20.06TYP 45' INC.+67.53+22.53TYP39' INC. 150' LANE TRANSITION + 9 1.0 0 1 1' 14'+91.0010' PATH 10' PATH 10' PATH 1 2 1 1 1 2 1 1 1 1 2 2 2 2 1 1 -L- Sta. 18+70.71 BEGIN PROJECT TBM #1 COTTON SPINDLE 40.00' (RT) -L- STA. 18+39.28 EL=364.09' E 2041593.63 N 774364.16 TBM #1 TBM #2 NAIL 13.41' (LT) -L- STA. 20+60.14 EL=399.65' E 2042488.71 N 774282.62 TBM #2 TBM #3 COTTON SPINDLE 197.54' (RT) -L- STA. 29+29.37 EL=400.82' E 2042608.68 N 774032.92 TBM #3 -L- POT Sta. 17+00.00 TRANSITION25' SW +77.00+42.00+30.00+55.00TRANSITION25' SW 8.25'30.25'11'11'11'11'06BY OTHERS DESIGN BY OTHERS DESIGN BY OTHERS DESIGN TO BE REMOVED EXIST SIDEWALK (TYP.) EXIST FM (TYP.) EXIST WL F C F F F F F F C F C F F F F F F C F F C F F F F F F F F C CC C C EOSAC AC AC AC D GT GT GT GT ICV ICV ICV ICV ICV ICV ICV ICV WV GTGTGTGT ICV ICV ICV ICV ICV GTS GV C C C CCC C WV WV WV WV WV WVWV W B6B6 B6 B6 B7 B8 B4 B6 B6 B4 B6 B4 B7 B6 O8 O11 O16 O12 O12 O12 O12 O12 O8 O12 O12 O12 HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HHHH EOS TT EOS T T T 8 T 9 T 10 11 T 12 T 13 T T 14 15 T 16 T 17 T 18 T W W W W W W W W WWWW W W W W W W W W W EOS S 49 40 46 53 ROOF DRAIN ROOF DRAIN INV.COVERED UNDER RIPRAP C HH 386.6 385.5 385.4 386.6 PIN NO. 0747-03-33-2860 D.B. 4432, PG. 331 4.69 AC. 4804 HOPSON ROAD PIN NO. 0747-03-34-2391 0.42 AC. 4801 HOPSON ROAD D.B. 5444, PG. 342 PIN NO. 0747-03-34-3599 0.64 AC. 4803 HOPSON ROAD D.B. 5444, PG. 342 PIN NO. 0747-03-35-5362 13.63 AC. PIN NO. 0747-03-35-5362 13.63 AC.PIN NO. 0747-03-33-6832 6.92 AC. 4812 HOPSON ROAD D.B. 7879, PG. 362 D.B. 7270, PG. 31 PIN NO. 0747-03-34-8810 4805 HOPSON ROAD PIN NO. 0747-03-34-5371 0.82 AC. 4813 HOPSON ROAD D.B. 6516, PG. 602 D.B. 7270, PG. 31 PIN NO. 0747-03-34-8810 14.77 AC. 5508 S MIAMI BOULEVARD PIN NO. 0747-03-34-7391 0.82 AC. 4823 HOPSON ROAD D.B. 8217, PG. 163 PIN NO. 0747-03-34-9350 0.40 AC. 4827 HOPSON ROAD D.B. 8121, PG. 559 D.B. 7270, PG. 31 PIN NO. 0747-03-34-8810 5516 S MIAMI BOULEVARD PIN NO. 0747-03-33-9963 1.85 AC. 5600 S MIAMI BOULEVARD D.B. 7424, PG. 656 1.25 AC. 5630 S MIAMI BOULEVARD PIN NO. 0747-03-33-9549.L00 D.B. 6716, PG. 424 D.B. 4832, PG. 690 PIN NO. 0747-03-44-3587 5503 S MIAMI BOULEVARD D.B. 4455, PG. 428 PIN NO. 0747-03-44-3375 5507 S MIAMI BOULEVARD D.B. 8426, PG. 444 PIN NO. 0747-03-43-2998 D.B. 8426, PG. 444 PIN NO. 0747-03-43-2699 5611 S MIAMI BOULEVARD 5431 PAGE ROAD PIN NO. 0747-03-43-1890 5607 S MIAMI BOULEVARD EXEMPT LOT NORTH CAROLINA RAILROAD CO. NORTH CAROLINA RAILROAD CO. NORTH CAROLINA RAILROAD CO. NORTH CAROLINA RAILROAD CO.919 STORAGE HOPSON ROAD LLC TS CREEKSTONE LLC. THE CAROLINAS INC. NEW COMMUNICATIONS OF TS CREEKSTONE LLC. SVASTI HOLDINGS LLC.SVASTI HOLDINGS LLC. TS CREEKSTONE LLC. SPIRIT MASTER FUNDING VII LLC. COLE BK DURHAM NC, LLC ARBYS DURHAM, LLC TRIPLE NET VENTURES, LLC TRIPLE NET VENTURES, LLC ARCHLAND PROPERTY I, LLC WEATHERSPOON HEIRS CEMETERY RAILROAD CO. NORTH CAROLINA BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_psh_5.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST MATCHLINE -L- STA. 32+50.00 (SEE SHEET R2.00)R2.01PLAN VIEWAPPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 0217 0219 0218 0201 0202 0203 0204 0205 0206 0207 0238 0208 0221 0220 0241 0212 0240 0215 0211 0210 0209 0239 0222 0223 0216 0224 0233 0234 0235 0236 0237 0242 0232 0231 0230 0229 02280227 0226 0225 0213 0214 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV RCP-IV 15" 15" RCP-IV RCP-IV 15" RCP-IV 15" RCP-IV 15" 15" RCP-IV 15" RCP-IV 15" RCP-IV 48" RCP-IV 48" RCP-IV STD 838.01 NCDOT HW RCP-IV 48" 48" RCP-IV RCP-IV 15" CB-G 15" RCP-IV 48" RCP-IV EST 50 SY GFD EST 26 TONS CLASS I RIP RAP 15" RCP-IV RCP-IV 15" 15" RCP-IV 15" RCP-IV 15" RCP-IV SEE DETAIL 1/SHEET R1.02 SPECIAL LATERAL 'V' DITCH 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV 15" RCP-IV SEE DETAIL 2/SHEET R1.02 SPECIAL LATERAL BASE DITCH EST 7 SY GFD EST 2 TONS CLASS 'B' RIP RAP CB-G CB-F CB-F CB-F CB-F CB-F CB-F CB-G CB-F CB-G CB-G CB-F CB-G CB-F CB-E CB-E CB-G DI CB-E CB-F CB-G CB-G CB-G ADJUST CB CB-F CB ADJUST CB-F CB-F DI CB-FCB-F CB-F 15" CSP W/ ELBOWS 48" RCP-IV GRADE TO DRAIN EST 50 SY GFD EST 25 TONS SEE DETAIL 3/SHEET R1.02 TOE PROTECTION REMOVE G CB- REMOVE SYSTEM SYSTEM RETAIN SYSTEM RETAIN SYSTEM RETAIN SYSTEM RETAIN SYSTEM RETAIN SYSTEM RETAINRETAIN 15"15"RETAINRETAIN SYSTEM SYSTEM RETAIN RETAIN 18" SYSTEM REMOVE GUTTERTIE TO EXISTING CURB &1 2 TIE TO EXISTING SIDEWALK TIE-IN NOTES:354045-L- PC Sta. 35+35.34 -L- PT Sta. 36+84.77 -L- PC Sta. 40+71.97 -L- PT Sta. 44+31.61 -L- POT Sta. 45+28.45 PI Sta 36+10.07 D L = 149.44' T = 74.73' R = 3,000.00' PI Sta 42+51.83 D L = 359.64' T = 179.86' R = 7,220.00' -L-29.5'34'300' LT TURN LANE11'11'11'11'11'11'11'11'11'30.25'30.25'-L- -L-(NC 54)S. MIAMI BOULEVARD50'R 30'R 30'R +65.00+65.00+95.00+85.0090' UNIFORM SHIFT +40.00+65.00+95.0029.5'28.5'28.5'28.5'30.25'30.25'+40.0025' SW TRANSITION 20' DW 02010001020201000101502020100022100' LT TURN LANE TAPER+65.00225' WB SHIFT 33'16' DW 16' DW20' DW -L-(SR 1978) HOPSON ROAD TYP 45' INC.+79.34+24.34022+68.34+51.77+95.77+40.77TYP 45' INC.02+27.50+50.0010' PATH 10' PATH 5' SIDEWALK 1 1 2 2 2 1 -L- Sta. 44+01.87 END PROJECT TBM #4 PK NAIL 38.59' (LT) -L- STA. 36+53.54 EL=382.36' E 2043370.08 N 774224.07 TBM #4 TBM #5 PK NAIL 40.54' (RT) -L- STA. 40+21.04 EL=387.60' E 2043738.54 N 774151.35 TBM #5 TBM #6 COTTON SPINDLE 292.97' (LT) -L- STA. 44+16.14 EL=393.62' E 2044141.60 N 774483.58 TBM #6 COTTON SPINDLE 297.80' (RT) -L- STA. 44+44.46 EL=383.72' E 2044151.66 N 773892.21 TBM #7 TBM #7 TYPE 1 TYPE 10201000101000102012+41.00012+00.00+85.00+40.00TYP 45' INC.+56.00+01.00TYP 45' INC.+60.77+32.00+52.00180' EXIST EB SHIFT3.5'29.5'7.5'+90.00+15.00 TRANSITION 25' SW TYP 45' INC.+02.53+47.53-L- STA. 32+99.00 GREU TL-3 BEGIN GUARDRAIL -L- STA. 38+21.00 CAT-1 END GUARDRAIL -L- STA. 34+42.00 CAT-1 BEGIN GUARDRAIL -L- STA. 36+32.00 GREU TL-3 END GUARDRAIL 4:14:1 4:14:1 2' PS 2' PS B-77 GAU-TYPE B-77 GAU-TYPE B-77 GAU-TYPE 33'20' DW 000102+66.87+11.87TYP 45' INC.01+01.87TL-3 ATTENUATOR IMPACT TL-3 ATTENUATOR IMPACT LT & RT -L- STA. 34+88.00 TO 35+49.00 NCDOT STD. 857.01 PRECAST CONCRETE BARRIER (TYP.) EXIST WL PAGE ROAD +45.00SHIFT 50' EB28.5'11'11'11'28.5'30' DW 2A TYPE TO BE RELOCATED FIRE HYDRANT F F F F F F C F F F F C C C F F F F C F C C C F F F CC BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECTNORTH CAROLINA11/6/20201"=50'PROFILEDRAWN BY: TDW DURHAM013276001WWW.KIMLEY-HORN.COMNC LICENSE #: F-0102PHONE: 919-682-3583© 202011/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Plan Sheets\013276001_pfl.dgnA NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCIWDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST 360 370 380 390 400 410 420 430 360 370 380 390 400 410 420 430 33 34 35 36 37 38 39 40 41 42 43 44 45 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 R2.02 -L- -L- 360 370 380 390 400 410 420 360 370 380 390 400 410 420 430 46 350 350 440 450 440 450 440 450 350 350 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE PI = 24+12.00 EL = 383.94' VC = 150' K = 99 PI = 27+49.00 EL = 400.22' VC = 195' K = 33 (-)1.07% (+)4.83% (+)3.31% GROUND EXISTING GRADE PROPOSED TIE TO EXIST PAVEMENT ELEV = 365.80' -L- STA 18+70.71 BEGIN MILL & OVERLAY ELEV = 371.13' -L- STA 20+25.00 BEGIN GRADE GROUND EXISTING ELEV = 374.00' -L- STA 20+50 DITCH GRADE LT BEGIN SPECIAL -L- STA 21+85 LTELEV = 376.75'ELEV = 380.00' -L- STA 22+60 DITCH GRADE LT END SPECIAL (+)4.33%(+)2.04% ELEV = 388.54' -L- STA 41+52.00 BEGIN MILL & OVERLAY END GRADE RT GROUND EXISTING PI = 33+18.00 EL = 394.15' VC = 150' K = 45 PI = 36+51.00 EL = 379.40' VC = 335' K = 50 PI = 40+51.00 EL = 388.24' VC = 85' K = 45 (-)4 .4 3%(+)2.21%(+)0.30% (-)1.07% ELEV = 390.52' -L- STA 34+00.00 BEGIN MILL & OVERLAY END GRADE LT ELEV = 381.99' -L- STA 37+41.00 BEGIN MILL & OVERLAY BEGIN GRADE LT GRADE PROPOSED 402.80' OF STEEL EXIST BOTTOM402.78' OF STEEL EXIST BOTTOM GROUND EXISTING BRIDGE EXIST PROVIDED 16' OF CLEARANCE TIE TO EXIST PAVEMENT ELEV = 389.30' -L- STA 44+01.87 END MILL & OVERLAY END GRADE LT END CONSTRUCTION ELEV = 383.00 -L- STA 38+70 DITCH GRADE LT BEGIN SPECIAL ELEV = 385.00' -L- STA 39+75 DITCH GRADE LT END SPECIAL (- )3 .00% ELEV = 382.70' -L- STA 35+80 DITCH GRADE LT BEGIN SPECIAL ELEV = 381.20 -L- STA 36+30 DITCH GRADE LT END SPECIAL (+)1.90% BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_tsh.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583 A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200LEGENDROADWAY STANDARD DRAWINGS TITLESTD. NO. FLAGGER TRAFFIC CONTROL DEVICES CONE DRUM STATIONARY SIGN PORTABLE SIGN CHANGEABLE MESSAGE SIGN STATIONARY OR PORTABLE SIGN SKINNY DRUM BARRICADE (TYPE III) TEMPORARY SIGNING SIGNALS PAVEMENT MARKERS CRYSTAL/CRYSTAL CRYSTAL/RED YELLOW/YELLOW PAVEMENT MARKINGS E M P T LAW ENFORCEMENT TEMPORARY CRASH CUSHION PAVEMENT MARKING SYMBOLS EXISTING LINES TEMPORARY LINES PAVEMENT MARKING SYMBOLS EXISTING PROPOSED TEMPORARY DIRECTION OF TRAFFIC FLOW NORTH ARROW GENERAL EXIST. PVMT. PROPOSED PVMT. DIRECTION OF PEDESTRIAN TRAFFIC FLOW TUBULAR MARKER REMOVAL WORK AREA TEMPORARY PAVEMENT MARKING THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" - 1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING 1205.10 PAVEMENT MARKINGS - SCHOOL AREAS 1205.11 PAVEMENT MARKINGS - RAILROAD CROSSINGS 1205.12 PAVEMENT MARKINGS - BRIDGES 1205.13 PAVEMENT MARKINGS - LANE REDUCTIONS 1250.01 RAISED PAVEMENT MARKERS - INSTALLATION SPACING 1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING 1262.01 GUARDRAIL END DELINEATION 1264.01 OBJECT MARKERS - TYPES 1264.02 OBJECT MARKERS - INSTALLATION 1205.09 PAVEMENT MARKINGS - PAINTED ISLANDS 1205.08 PAVEMENT MARKINGS - SYMBOLS AND WORD MESSAGES 1205.07 PAVEMENT MARKINGS - PEDESTRIAN CROSSWALKS 1205.06 PAVEMENT MARKINGS - LANE DROPS 1205.05 PAVEMENT MARKINGS - TURN LANES 1205.04 PAVEMENT MARKINGS - INTERSECTIONS 1205.03 PAVEMENT MARKINGS - EXITS AND ENTRANCE RAMPS 1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTI-LANE ROADWAYS 1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS 1165.01 WORK VEHICLE LIGHTING SYSTEMS AND TMA DELINEATION 1160.01 TEMPORARY CRASH CUSHION 1150.01 FLAGGING DEVICES 1145.01 BARRICADES 1135.01 CONES 1130.01 DRUM 1115.01 FLASHING ARROW BOARDS 1110.02 PORTABLE WORK ZONE SIGNS 1110.01 STATIONARY WORK ZONE SIGNS 1101.11 TRAFFIC CONTROL DESIGN TABLES 1101.06 WARNING SIGNS FOR BLASTING ZONES 1101.05 WORK ZONE VEHICLE ACCESSES 1101.04 TEMPORARY SHOULDER CLOSURES 1101.03 TEMPORARY ROAD CLOSURES 1101.02 TEMPORARY LANE CLOSURES FLASHING ARROW BOARD TRUCK MOUNTED ATTENUATOR (TMA) TEMP. SHORING (LOCATION PURPOSES ONLY) E M P T 1101.01 WORK ZONE ADVANCE WARNING SIGNS 1170.01 POSITIVE PROTECTION 1180.01 SKINNY-DRUM 1251.01 RAISED PAVEMENT MARKERS - PERMANENT AND TEMPORARY N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: TEMPORARY PAVEMENT OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST R3.01 PLANTRAFFIC CONTROL P74 - PAINT 2X COMBO RIGHT/STRAIGHT ARROW P73 - PAINT 2X COMBO LEFT/STRAIGHT ARROW P72 - PAINT 2X STRAIGHT ARROW P71 - PAINT 2X RIGHT TURN ARROW P70 - PAINT 2X LEFT TURN ARROW P61 - PAINT (24" WHITE, 2X) STOP BARS P46 - PAINT (8" WHITE, 2X) CROSSWALK P42 - PAINT (8" YELLOW, 2X) DIAGONAL P41 - PAINT (8" WHITE, 2X) DIAGONAL P13 - PAINT (4" YELLOW, 2X) DOUBLE CENTERLINE P10 - PAINT (4" YELLOW, 2X) EDGELINE P4 - PAINT (4" WHITE, 2X) 3' X 9'/SP MINISKIP P3 - PAINT (4" WHITE, 2X) 10 FT. WHITE SKIP P2 - PAINT (4" WHITE, 2X) SOLID LANE LINE P1 - PAINT (4" WHITE, 2X) EDGELINE APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_tsh.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST R3.02 GENERAL NOTES PLANTRAFFIC CONTROL TIME RESTRICTIONS LANE AND SHOULDER CLOSURE REQUIREMENTS PAVEMENT EDGE DROP OFF REQUIREMENTS TRAFFIC PATTERN ALTERATIONS MISCELLANEOUS PAVEMENT MARKINGS AND MARKERS TRAFFIC CONTROL DEVICES SIGNING BARRIER OR GUARDRAIL OR AS DIRECTED BY THE ENGINEER. OF AN OPEN TRAVELWAY UNLESS THE HAULING OPERATION IS PROTECTED BY C) DO NOT CONDUCT ANY HAULING OPERATIONS AGAINST THE FLOW OF TRAFFIC TUESDAY AFTER THE WEEK OF CHRISTMAS. BEFORE THE WEEK OF CHRISTMAS DAY AND 7:00 P.M. THE FOLLOWING 8. FOR CHRISTMAS, BETWEEN THE HOURS OF 7:00 A.M. THE FRIDAY 7:00 P.M. MONDAY. 7. FOR THANKSGIVING DAY, BETWEEN THE HOURS OF 7:00 A.M. TUESDAY TO 7:00 P.M. TUESDAY. 6. FOR LABOR DAY, BETWEEN THE HOURS OF 7:00 A.M. FRIDAY AND INDEPENDENCE DAY. INDEPENDENCE DAY AND 7:00 P.M. THE TUESDAY AFTER THEN BETWEEN THE HOURS OF 7:00 A.M. THE THURSDAY BEFORE IF INDEPENDENCE DAY IS ON A FRIDAY, SATURDAY, SUNDAY OR MONDAY INDEPENDENCE DAY. DAY BEFORE INDEPENDENCE DAY AND 7:00 P.M. THE DAY AFTER 5. FOR INDEPENDENCE DAY, BETWEEN THE HOURS OF 7:00 A.M. THE 7:00 P.M. TUESDAY. 4. FOR MEMORIAL DAY, BETWEEN THE HOURS OF 7:00 A.M. FRIDAY TO 7:00 P.M. MONDAY. 3. FOR EASTER, BETWEEN THE HOURS OF 7:00 A.M. THURSDAY AND TUESDAY. SATURDAY, SUNDAY, OR MONDAY THEN UNTIL 7:00 P.M. THE FOLLOWING TO 7:00 P.M. JANUARY 2ND. IF NEW YEAR'S DAY IS ON A FRIDAY, 2. FOR NEW YEAR'S, BETWEEN THE HOURS OF 7:00 A.M. DECEMBER 31st VOLUMES, AS DIRECTED BY THE ENGINEER. 1. FOR ANY UNEXPECTED OCCURRENCE THAT CREATES UNUSUALLY HIGH TRAFFIC HOLIDAY S. MIAMI BLVD (NC-54) HOPSON RD (SR 1978) ROAD NAME EVENTS AS FOLLOWS: B) DO NOT CLOSE OR NARROW TRAVEL LANES DURING HOLIDAYS AND SPECIAL TO 7:00 PM MON THRU FRI 7:00 AM TO 9:00 AM & 4:00 PM HOPSON RD (SR 1978) ROAD NAME DAY AND TIME RESTRICTIONS A) DO NOT CLOSE OR NARROW TRAVEL LANES AS FOLLOWS: OR DIRECTED BY THE ENGINEER. THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF ENGINEER. SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING, TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL ENGINEER, AT NO EXPENSE TO THE DEPARTMENT. BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE POSTED SPEED LIMITS LESS THAN 45 MPH. BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH POSTED SPEED LIMITS OF 45 MPH OR GREATER. BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH EDGE OF PAVEMENT DROP-OFF AS FOLLOWS: PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN J) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING PATTERN ALTERATION. K) NOTIFY THE ENGINEER THIRTY (30) CALENDAR DAYS PRIOR TO ANY TRAFFIC ENGINEER. (W8-1) 300 IN ADVANCE OF THE UNEVEN AREA, OR AS DIRECTED BY THE N) INSTALL BLACK ON ORANGE ''DIP'' SIGNS (W8-2) AND/OR "BUMP" SIGNS TRAFFIC PATTERN. M) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY (3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION. 40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE L) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN UNOPENED LANES ARE CLOSED TO TRAFFIC. PERPENDICULAR TO THE EDGE OF TRAVELWAY ON 500 FT CENTERS WHEN U) PLACE ADDITIONAL SETS OF THREE CHANNELIZING DEVICES DRUMS FOR ADDITIONAL REQUIREMENTS. STRUCTURES SECTIONS 1130 (DRUMS), 1135 (CONES) AND 1180 (SKINNY DRUMS) TRAVELWAY. REFER TO STANDARD SPECIFICATIONS FOR ROADS AND EXCEPT, 10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN OPEN WORK AREAS NO GREATER IN FEET THAN TWICE THE POSTED SPEED LIMIT (MPH) S) WHEN LANE CLOSURES ARE NOT IN EFFECT SPACE CHANNELIZING DEVICES IN TO DELINEATE ANY PROPOSED MONOLITHIC ISLANDS BEFORE INSTALLATION. PAVEMENT MARKINGS PRIOR TO INSTALLATION. PLACE TUBULAR MARKERS Z) TRACE THE PROPOSED MONOLITHIC ISLAND LOCATIONS WITH PROPER COLOR MARKERS BY THE END OF EACH DAY'S OPERATION. Y) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND LINES. X) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING APPLICATION AND EVERY SIX MONTHS AS DIRECTED BY THE ENGINEER. PLACE A SECOND APPLICATION OF PAINT SIX (6) MONTHS AFTER THE INITIAL W) PLACE ONE APPLICATION OF PAINT FOR TEMPORARY TRAFFIC PATTERNS. ALL PAINT NONE ROAD NAME MARKING MARKER MARKERS ON INTERIM LAYERS OF PAVEMENT AS FOLLOWS: V) INSTALL TEMPORARY PAVEMENT MARKINGS AND TEMPORARY PAVEMENT IN COORDINATION WITH THE SIGNING AND DELINEATION UNIT. SHOWN ON PAVEMENT MARKING PLANS OR AS DIRECTED BY THE ENGINEER BB) ALL CURB RAMP LOCATIONS SHALL BE DERIVED FROM STATIONING WORK AREA AND/OR INTERSECTIONS AS DIRECTED BY THE ENGINEER. AA) LAW ENFORCEMENT MAY BE USED TO MAINTAIN TRAFFIC THROUGH THE ON HOPSON RD. I) DO NOT INSTALL MORE THAN ONE LANE CLOSURE IN ANY ONE DIRECTION WITH GUARDRAIL OR BARRIER. TRAVELWAY, RAMP, OR LOOP WITHIN THE SAME LOCATION UNLESS PROTECTED H) DO NOT WORK SIMULTANEOUSLY WITHIN 15 FT ON BOTH SIDES OF AN OPEN TRAVEL LANE. THAT ALL PERSONNEL AND/OR EQUIPMENT REMAIN WITHIN THE CLOSED DRAWINGS, OR AS DIRECTED BY THE ENGINEER. CONDUCT THE WORK SO ACCORDING TO THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD TRAVEL OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE G) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF BY BARRIER OR GUARDRAIL. STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY ADJACENT TO A DIVIDED FACILITY AND WITHIN 10 FT OF AN OPEN WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER PROTECTED BY BARRIER OR GUARDRAIL. ROADWAY STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN F) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER BARRIER OR GUARDRAIL OR A LANE CLOSURE IS INSTALLED. STANDARD DRAWING NO. 1101.04 UNLESS THE WORK AREA IS PROTECTED BY OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN SHOULDER USING ROADWAY E) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 15 FT OF AN LONGER NEEDED OR AS DIRECTED BY THE ENGINEER. PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO D) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_tsh.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST PHASING NOTES PLANTRAFFIC CONTROL R3.03 PHASE 1 PHASE 2 PHASE 3 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE DRAINAGE AND SMOOTH TRANSITIONS. - PROVIDE WEDGING AS REQUIRED TO ENSURE POSITIVE AS REQUIRED. - STEPS 3 THRU 5 MAY BE PERFORMED CONCURRENTLY NOTES: CONDITIONS AT THE END OF EACH WORK PERIOD. EXISTING TRAVED WAY IS RESTORED TO SUITABLE DRIVING ACCORDANCE WITH RSD 1101.02 SHEET 1 OF 14. ENSURE THAT THE USING NIGHTTIME TEMPORARY LANE CLOSURES AND FLAGGING IN ASSOCIATED 48" RCP WITHIN THE EXISTING LANES OF TRAFFIC INSTALL DRAINAGE STRUCTURES 0240, 0239, AND 0222 AND STEP 5A: ENSURE A SMOOTH TRAVEL SURFACE. BETWEEN -L- STA. 40+27 AND -L- STA. 41+78 AND PATCH TO 28+95 AND STA 41+52. REMOVE EXISTING MONOLITIC ISLAND GUARDRAIL RIGHT OF -L- HOPSON RD (SR 1978) BETWEEN STA. DRAINAGE NETWORKS, AND PROPOSED MEDIAN BARRIER AND SURFACE COURSE, CURB & GUTTER CONSTRUCTION, ASSOCIATED CONSTRUCT WIDENING UP TO BUT NOT INCLUDING THE FINAL STEP 5: RD (SR 1978) BETWEEN STA. 25+50 AND STA. 28+20 (APPROX.) CONSTRUCTION, AND ASSOCIATED DRAINAGE LEFT OF -L- HOPSON SURFACE COURSE, CURB & GUTTER CONSTRUCTION, SIDEWALK PERFORM WIDENING UP TO BUT NOT INCLUDING THE FINAL STEP 4: AND PATCH TO ENSURE A SMOOTH TRAVEL SURFACE. MONOLITHIC ISLAND BETWEEN -L- STA. 21+51 AND -L- STA. 24+58 (SR 1978) FROM STA. 20+07 TO STA. 25+50. REMOVE EXISTING ASSOCIATED DRAINAGE INSTALLATION RIGHT OF -L- HOPSON RD SURFACE COURSE, CURB & GUTTER CONSTRUCTION, AND PERFORM WIDENING UP TO BUT NOT INCLUDING THE FINAL STEP 3: R3.05. INSTALL TRAFFIC CONTROL DEVICES AS SHOWN ON SHEETS R3.04 & STEP 2: 1101.01. INSTALL ADVANCE WARNING SIGNS IN ACCORDANCE WITH RSD STEP 1: ON SHEETS R3.04 & R3.05: CLOSURES AS NECESSARY, PERFORM THE FOLLOWING AS SHOWN RSD 1101.04 FOR SHOULDER CLOSURES AND RSD 1101.02 FOR LANE WHILE MAINTAINING TRAFFIC IN THE EXISTING PATTERN AND USING DRAINAGE AND SMOOTH TRANSITIONS. - PROVIDE WEDGING AS REQUIRED TO ENSURE POSITIVE AS REQUIRED. - STEPS 2 THRU 4 MAY BE PERFORMED CONCURRENTLY NOTES: STA. 28+64 (APPROX.) AND STA. 44+01.87. ASSOCIATED DRAINAGE LEFT OF -L- HOPSON RD (SR 1978) BETWEEN SURFACE COURSE, CURB & GUTTER CONSTRUCTION, AND PERFORM WIDENING UP TO BUT NOT INCLUDING THE FINAL STEP 4: (SR 1978) FROM STA. 25+50 TO STA. 28+62 (APPROX.). ASSOCIATED DRAINAGE INSTALLATION RIGHT OF -L- HOPSON RD SURFACE COURSE, CURB & GUTTER CONSTRUCTION, AND PERFORM WIDENING UP TO BUT NOT INCLUDING THE FINAL STEP 3: OF -L- HOPSON RD (SR 1978) FROM STA. 18+70.71 TO STA. 25+50. CONSTRUCTION AND ASSOCIATED DRAINAGE INSTALLATION LEFT SURFACE COURSE, CURB & GUTTER CONSTRUCTION, SIDEWALK PERFORM WIDENING UP TO BUT NOT INCLUDING THE FINAL STEP 2: TEMPORARY PATTERN. REMOVE CONFLICTING MARKINGS AND SHIFT TRAFFIC ONTO 54). INTERSECTION OF -L- HOPSON RD (SR 1978) AND S. MIAMI BLVD (NC RD (SR 1978) AND KEYSTONE PARK DRIVE AND AT THE INSTALL TEMPORARY SIGNALS AT THE INTERSECTION OF -L- HOPSON MARKINGS AS SHOWN ON SHEETS R3.06 & R3.07. INSTALL TRAFFIC CONTROL DEVICES AND TEMPORARY PAVEMENT STEP 1: SHOWN ON SHEETS R3.06 & R3.07: FOR LANE CLOSURES AS NECESSARY, PERFORM THE FOLLOWING AS USING RSD 1101.04 FOR SHOULDER CLOSURES AND RSD 1101.02 FINAL SURFACE COURSE AND FINAL PAVEMENT MARKINGS. USING RSD 1101.02 SHEETS 1, 2 AND 3 OF 14 AS REQUIRED, INSTALL STEP 4: REMOVE ANY CONFLICTING MARKINGS. FINAL PATTERN. REMOVE ALL TRAFFIC CONTROL DEVICES AND SHIFT TRAFFIC ONTO VERSION OF FINAL PAVEMENT MARKINGS, INSTALL FINAL SIGNALS, UPON COMPLETION OF ALL MEDIAN CONSTRUCTION, INSTALL PAINT STEP 3: STA. 20+38.61 TO STA. 43+69.25. DRAIANAGE STRUCUTRES AND PIPES ALONG -L- HOPSON RD. FROM PROPOSED MONOLITHIC ISLANDS, AND INSTALL ASSOCIATED CONSTRUCT MEDIAN CURB & GUTTER, PAVEMENT REMOVAL, STEP 2: TEMPORARY PATTERN. REMOVE CONFLICTING MARKINGS AND SHIFT TRAFFIC ONTO 54). INTERSECTION OF -L- HOPSON RD (SR 1978) AND S. MIAMI BLVD (NC RD (SR 1978) AND KEYSTONE PARK DRIVE AND AT THE INSTALL TEMPORARY SIGNALS AT THE INTERSECTION OF -L- HOPSON MARKINGS AS SHOWN ON SHEETS R3.08 & R3.09. INSTALL TRAFFIC CONTROL DEVICES AND TEMPORARY PAVEMENT STEP 1: SHOWN ON SHEETS R3.08 & R3.09: FOR LANE CLOSURES AS NECESSARY, PERFORM THE FOLLOWING AS USING RSD 1101.04 FOR SHOULDER CLOSURES AND RSD 1101.02 VAN VAN BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_psh_4.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST MATCHLI NE -L- STA. 32+50.00 (SEE SHEET R3.05) R3.04PLAN DETAILSTRAFFIC MANAGEMENT PHASE 1STATION 30+00 LC -L- (VARIES) EXIST EXIST EXIST EXIST 3' STATION 25+00 SECTION A-A -L-LC EXISTEXIST (MEDIAN) EXIST (VARIES) EXIST 3' WORK ZONE WORK ZONE STATION 27+00 SECTION B-B -L-LC EXISTEXISTWORK ZONE EXIST 3' SECTION C-C WORK AREA WEDGING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE202530KEYSTONE PARK DRI VEDRI VEDI STRI BUTI ON (SR 1978) HOPSON ROAD-L-R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX A A C C P1 B B R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX DRAIAGE SYSTEM IS COMPLETE. FLOW UNTIL REMAINING AND 0118 AND DO NOT ALLOW COVER STRUCTURES 0117 -L- Sta. 20+07.90 BEGIN CONSTRUCTION ISLAND AND PATCH REMOVE EXISTING MONOLITHIC FROM -L- STA. 23+00 TO -L- STA. 24+25 (10' ON-CENTER) IN ISLAND LOCATION AND PATCHED, INSTALL TUBULAR MARKERS AFTER MONOLITHIC ISLAND HAS BEEN REMOVED ELEVATION AND COVER WITH STEEL PLATE. INSTALL STRUCTURE 0130 TO TEMPORARY 0105 0106 0114 0109 0110 0117 0118 0128 0127 0135 0130 18"RCP INV.OUT=383.71 24"RCP INV.OUT=377.64 CB RIM=383.20 OPEN BOX INV.OUT=380.80 CB RIM=387.98 30"RCP INV.IN(E)=380.93 36"RCP INV.IN(N)=380.73 36"RCP INV.OUT=380.71 CB RIM=388.04 12"RCP INV.IN=383.62 30"RCP INV.OUT=383.53 CB RIM=388.24 12"RCP INV.OUT=384.31 CB RIM=388.35 36"RCP INV.IN=381.61 36"RCP INV.OUT=381.28 CB RIM=388.34 36"RCP INV.IN=381.83 36"RCP INV.OUT=381.75 CB RIM=389.20 30"RCP INV.IN=382.12 36"RCP INV.OUT=382.02 CB RIM=388.71 24"RCP INV.IN(N)=383.51 24"RCP INV.OUT=383.07 48"RCPX2 INV.IN(W)=383.69 48"RCPx2 INV.OUT=384.75 CB RIM=389.77 36"RCP INV.IN=383.29 36"RCP INV.OUT=378.89 CB RIM=393.29 24"RCP INV.IN=388.04 30"RCP INV.OUT=387.89 CB RIM=392.96 18"RCP INV.IN=388.71 24"RCP INV.OUT=388.29 CB RIM=394.06 18"RCP INV.IN=389.39 18"RCP INV.OUT=389.29 CB RIM=395.61 36"RCP INV.IN=389.27 36"RCP INV.OUT=389.14 36"RCP INV.OUT=391.58 DI RIM=382.22 18"RCP INV.IN=379.86 18"RCP INV.OUT=379.78 DI RIM=384.16 18"RCP INV.IN=382.07 18"RCP INV.OUT=382.16 DI RIM=386.80 18"RCP INV.IN=384.37 18"RCP INV.OUT=384.35 DI RIM=384.06 18"RCP INV.IN=380.55 18"RCP INV.OUT=380.66 DI RIM=387.63 36"RCP INV.IN=381.22 36"RCP INV.OUT=381.18 DMH RIM=383.26 36"RCP INV.IN=376.42 36"RCP INV.OUT=376.31 DMH RIM=386.53 36"RCP INV.IN(N)=377.92 36"RCP INV.IN(NW)=377.78 36"RCP INV.OUT=377.75 DMH RIM=388.38 24"RCP INV.IN(N)=383.09 30"RCP INV.IN(E)=384.82 30"RCP INV.OUT=384.33 24"RCP INV.OUT=383.62 DMH RIM=392.09 36"RCP INV.IN(N)=386.09 30"RCP INV.IN(E)=385.99 36"RCP INV.OUT=385.94 18"FES=383.82 18"RCP INV.=378.63 DMH RIM=387.80 18"RCP INV.IN=383.26 18"RCP INV.OUT=383.18 3x24"RCP WEST INV.=378.30 CENTER INV.=378.74 EAST INV.=379.10 3x24"RCP WEST INV.=378.02 CENTER INV.=377.82 EAST INV.=378.16 18"RCP INV.=378.92 18"RCP INV.=377.45 48"RCP INV.=374.85 48"RCP INV.=374.41 18"RCP 15" RCP 18" RCP 18" RCP BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_psh_5.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST MATCHLINE -L- STA. 32+50.00 (SEE SHEET R3.04)R3.05 PLAN DETAILSTRAFFIC MANAGEMENT PHASE 1STATION 39+50 -L-LC SECTION E-E EXIST 3' WORK ZONEEXISTEXIST (VARIES) EXIST MEDIAN SECTION D-D -L-LC STATION 34+00 EXISTEXIST (MEDIAN) EXIST 3' WORK ZONE WORK AREA WEDGING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE354045(NC 54)S. MIAMI BOULEVARD(SR 1978) HOPSON ROAD -L- R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX E E D D -L- Sta. 41+78.04 END CONSTRUCTION PROPOSED BARRIER AND GUARDRAIL ARE INSTALLED. TEMPORARY BARRIER AS REQUIRED UNTIL MAINTAIN EXISTING GUARDRAIL OR UTILIZE ISLAND AND PATCH REMOVE EXISTING MONOLITHIC ELEVATION AND COVER WITH STEEL PLATE. INSTALL STRUCTURES 0202 AND 0203 TO TEMPORARY PIPES USING RSD 1101.02 SHEET 1 OF 14 AS REQUIRED. INSTALL STRUCTURES 0202 AND 0203 AND ASSOCIATED TRAVEL SURFACE AT THE END OF EACH WORK PERIOD. AND BACKFILL AS REQUIRED TO MAINTAIN A SUITABLE - INSTALL PROPOSED 48" PIPES, REMOVE EXISTING 48" PIPE TEMPORARY ELEVATION AND COVER WITH STEEL PLATES. - INSTALL STRUCTURES 0222. 0239, AND 0240 TO WITH RSD 1101.02 SHEET 1 OF 14: USING NIGHTTIME LANE CLOSURES IN ACCORDANCE PAGE ROAD 0202 0203 0204 0205 0206 0207 0238 0219 0218 0221 0220 0241 0240 0215 0211 0239 0222 0223 0224 0233 0234 0213 0214 0212 0235 VAN VAN BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_psh_6.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST MATCHLI NE -L- STA. 32+50.00 (SEE SHEET R3.07) R3.06PLAN DETAILSTRAFFIC MANAGEMENT PHASE 2STATION 25+00 3' 11'2' (VARIES) 11' MEDIAN11' (RT TURN LANE) VARIES 1.76' WORK ZONE SECTION F-F STATION 27+00 SECTION G-G -L-LC 11'2'11'11' 3' ZONE WORK 3' LC -L- WORK AREA WEDGING STATION 30+00 LC -L- SECTION H-H 3' 11'9.53' (MEDIAN) VARIES 11'11'WORK ZONE 11' APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE202530E M P T DRI VEDI STRI BUTI ON (SR 1978) HOPSON ROAD-L- R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX F F H H+91.00+91.00LANE TURN 25' RT TAPER 100' RT TURN LANE +20.00+20.00+20.00LANE TAPER100' RT TURN TURN LANE100' RT +90.00+90.00+90.00100' LT TURN LANE +00.00+00.00LANE TAPER100' LT TURN 175' LT TURN LANE TAPER+15.0090' RT TURN TAPER +25. 0 0R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX +20.00655' WESTBOUND SHIFT 11' 11'11' R=1160' 11' 7.86' 430' WESTBOUND SHIFT +5 5. 7 2 +85.72+5 5. 7 2 +85.72430' EASTBOUND SHIFT R=1049' 11' 11' 11' 6.12' 2' 11' 11' 2' 11'11' BEGIN -L- STA 20+25 P2P4 BEGIN -L- STA 20+13 P1 BEGIN -L- STA 20+08 P1 BEGIN -L- STA 20+28 P13 P42 P2 BEGIN END -L- STA 22+00 P4 P4END -L- STA 23+00 P1END -L- STA 23+43 BEGIN -L- STA 23+65 P1 P2 P2 BEGIN END -L- STA 24+16 P4 P4END -L- STA 25+16 LANE TAPER 100' LT TURN P4 P2 P13 END -L- STA 26+90 P13 P42 INSTALL END -L- STA 27+90 P61 BEGIN END -L- STA 26+90 P2 INSTALL END -L- STA 28+13 P61 BEGIN -L- STA 25+90 P4 P1 BEGIN -L- STA 28+72 P1 PARK DRI VEKEYSTONEP10 P10BEGIN -L- STA 29+18.50 INSTALL BEGIN -L- STA 29+20 P2 P61 P2 P4BEGIN END -L- STA 30+70 P4END -L- STA 31+70 R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX P10 P42 P61 P70 P74 P71 P71 BEGIN -L- STA 23+91 P70 P72 P71 11' P4END -L- STA 31+20+70.00+70.00P2 BEGIN END -L- STA 30+20 P4 LANE TAPER100' LT TURN TURN LANE150' LT STEEL PLATE COVER WITH ELEVATION AND 0122 TO TEMPORARY INSTALL STRUCTURE R9-9 24'' X 12'' CLOSED SIDEWALK PEDESTRIAN BARRICADE 2" MAX+16.00BEGIN -L- STA 21+15 P4 EXIST21.7' 18.3'EXIST -L- Sta. 18+70.71 CONSTRUCTION BEGIN 11' 11' 11' P70 P72 P2 G G VAR. 28.25' 4.75' (TYP.). RSD 1101.02 SHEET 1 OF 14 IN ACCORDANCE WITH TEMPORARY LANE CLOSURES AND SMALLER USING INSTALL CROSSPIPES 24" P61 END -L- STA 28+16 P61 0119 0120 0121 0122 0107 0111 0112 0108 0102 0101 0124 0126 0125 0129 0132 4.75' 24"RCP INV.OUT=377.64 CB RIM=383.20 OPEN BOX INV.OUT=380.80 CB RIM=387.98 30"RCP INV.IN(E)=380.93 36"RCP INV.IN(N)=380.73 36"RCP INV.OUT=380.71 CB RIM=388.04 12"RCP INV.IN=383.62 30"RCP INV.OUT=383.53 CB RIM=388.24 12"RCP INV.OUT=384.31 CB RIM=388.35 36"RCP INV.IN=381.61 36"RCP INV.OUT=381.28 CB RIM=388.34 36"RCP INV.IN=381.83 36"RCP INV.OUT=381.75 CB RIM=389.20 30"RCP INV.IN=382.12 36"RCP INV.OUT=382.02 CB RIM=388.71 24"RCP INV.IN(N)=383.51 24"RCP INV.OUT=383.07 48"RCPX2 INV.IN(W)=383.69 48"RCPx2 INV.OUT=384.75 CB RIM=389.77 36"RCP INV.IN=383.29 36"RCP INV.OUT=378.89 CB RIM=393.29 24"RCP INV.IN=388.04 30"RCP INV.OUT=387.89 CB RIM=392.96 18"RCP INV.IN=388.71 24"RCP INV.OUT=388.29 CB RIM=394.06 18"RCP INV.IN=389.39 18"RCP INV.OUT=389.29 CB RIM=395.61 36"RCP INV.IN=389.27 36"RCP INV.OUT=389.14 36"RCP INV.OUT=391.58 DI RIM=382.22 18"RCP INV.IN=379.86 18"RCP INV.OUT=379.78 DI RIM=384.16 18"RCP INV.IN=382.07 18"RCP INV.OUT=382.16 DI RIM=386.80 18"RCP INV.IN=384.37 18"RCP INV.OUT=384.35 DI RIM=384.06 18"RCP INV.IN=380.55 18"RCP INV.OUT=380.66 DI RIM=387.63 36"RCP INV.IN=381.22 36"RCP INV.OUT=381.18 DMH RIM=383.26 36"RCP INV.IN=376.42 36"RCP INV.OUT=376.31 DMH RIM=386.53 36"RCP INV.IN(N)=377.92 36"RCP INV.IN(NW)=377.78 36"RCP INV.OUT=377.75 DMH RIM=388.38 24"RCP INV.IN(N)=383.09 30"RCP INV.IN(E)=384.82 30"RCP INV.OUT=384.33 24"RCP INV.OUT=383.62 DMH RIM=392.09 36"RCP INV.IN(N)=386.09 30"RCP INV.IN(E)=385.99 36"RCP INV.OUT=385.94 18"FES=383.82 18"RCP INV.=378.63 18"RCP INV.=378.92 18"RCP INV.=377.45 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_psh_7.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST MATCHLINE -L- STA. 32+50.00 (SEE SHEET R3.06)R3.07PLAN DETAILSTRAFFIC MANAGEMENT PHASE 2SECTION I-I -L-LC STATION 34+00 11'11' 3' WORK ZONE 3' -L-LC 11'11' 3' 11'11'WORK ZONE SECTION J-J STATION 42+00 WORK AREA WEDGING APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE354045(NC 54)S. MIAMI BOULEVARDE M P T CROSS HERE SIDEWALK CLOSED 24'' X 12'' R9-11a PEDESTRIAN BARRICADE 2" MAXCROSS HERE SIDEWALK CLOSED2" MAX PEDESTRIAN BARRICADE 24'' X 12'' R9-11a MAINTAIN ACCESS TO PEDESTRIAN CROSSWALK AT ALL TIMES I I +60.00+65.00+60.00+60.00+40.00320' WESTBOUND SHIFT -L- STA. 37+38.00 END 1'-6'' CURB & GUTTER 11' 11'11' 11' 11' 11' END -L- STA 32+85 P42 P4 P4 P2BEGIN END -L- STA 41+10 P13 P2 P3 INSTALL END -L- STA 43+69 P61 P4END -L- STA 42+82 P70 P72 P74 200' DOWNSTREAM TAPER +60.00TAPER TURN LANE 100' LT 105' LT TURN LANE P10 P10 BEGIN END -L- STA 42+60 P13 P10BEGIN -L- STA 37+38 -L- STA. 38+11.94 END 1'-6'' CURB & GUTTER BEGIN END -L- STA 39+60 P3BEGIN -L- STA 37+60 P4+95.00SHIFT 655'' WESTBOUND END -L- STA 33+99 P10 P10 (SR 1978) HOPSON ROAD -L- END -L- STA 35+54 P10 BEGIN -L- STA 34+85 J J -L- Sta. 44+01.87 END CONSTRUCTION INSTALL STRUCTURES 0240 AND 0239 TO FINAL ELEVATION. 0222 TO FINAL ELEVATION. INSTALL STRUCTURES (TYP.). RSD 1101.02 SHEET 1 OF 14 IN ACCORDANCE WITH TEMPORARY LANE CLOSURES AND SMALLER USING INSTALL CROSSPIPES 24" PAGE ROAD 0201 0217 0211 02100209 0239 0222 0223 0232 02310230 0229 02280227 0226 0225 0242 19.25' 19.25'14.5' 29.5' VAN VAN VAN VAN A C C VAN VAN VAN VAN DN UP BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_psh_8.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST MATCHLI NE -L- STA. 32+50.00 (SEE SHEET R3.09) R3.08PLAN DETAILSTRAFFIC MANAGEMENT PHASE 3STATION 25+00 -L-LC 3' 11'11' (RT TURN LANE) VARIES 1.76' 3' WORK ZONE STATION 30+00 LC -L- 3' 11'11'11' 3' WORK ZONE SECTION L-L 11' SECTION K-K WORK AREA PAVEMENT REMOVAL APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE202530(SR 1978) HOPSON ROAD-L-DRI VEDI STRI BUTI ON KEYSTONE PARK DRI VEE M P T +02.00+02.00+20.00+20.00LANE TAPER100' LT TURN +89.00155' LT TURN LANE+34.00+34.00LANE TAPER 100' LT TURN +91.00+16.00+91.00LANE TURN 25' RT +41.00+41.00+41.00+16.00+20.00K K L L R=1160'+85.72430' EASTBOUND SHIFT +5 5. 7 2 11' 11' 11' 11' 11' 11' 11' 11' 11' 11' 11' 11'11' 11' BEGIN -L- STA 20+40 P2P4 BEGIN -L- STA 20+35 P10 BEGIN -L- STA 20+08 P1 P1END -L- STA 23+85.72 END -L- STA 21+16 P4 TURN TAPER75' RT TURN LANE100' LT P2 BEGIN END -L- STA 21+41 P4 P4 LANE TAPER100' LT TURN END -L- STA 22+41 BEGIN -L- STA 23+91 P2 LANE TAPER 100' RT TURN P4BEGIN END -L- STA 24+16 P2 P2END -L- STA 25+16 P10 BEGIN -L- STA 25+34 P4 P2BEGIN END -L- STA 26+34 P4 INSTALL -L- STA 27+89 P61 P2 INSTALL END -L- STA 28+14 P61 P10END -L- STA 28+01 P10 P46 P46 P61 P10 P42 P46 P46 P61 P2 TURN LANE 100' RT P2 P2 INSTALL BEGIN -L- STA 29+02 P61 INSTALL -L- STA 29+20 P61 TURN LANE200' LT P4BEGIN END -L- STA 30+02 P2 P4BEGIN END -L- STA 31+02 P2 P4BEGIN END -L- STA 31+20 P2 P4END -L- STA 31+20 BEGIN -L- STA 29+09 P10 P10 P71 P72 P70 P74 P70P70 P71 P70 P72P71 0108 FINAL ELEVATION. INSTALL STRUCTURE 0130 TO 18.3' 21.7' -L- Sta. 20+38.61 BEGIN CONSTRUCTION +02.00LANE TAPER100' RT TURN (TYP.). RSD 1101.02 SHEET 1 OF 14 IN ACCORDANCE WITH TEMPORARY LANE CLOSURES AND SMALLER USING INSTALL CROSSPIPES 24" P61 0103 0104 0116 0115 0113 0122 0123 0133 0134 0130 30.25' 24"RCP INV.OUT=377.64 CB RIM=383.20 OPEN BOX INV.OUT=380.80 CB RIM=387.98 30"RCP INV.IN(E)=380.93 36"RCP INV.IN(N)=380.73 36"RCP INV.OUT=380.71 CB RIM=388.04 12"RCP INV.IN=383.62 30"RCP INV.OUT=383.53 CB RIM=388.24 12"RCP INV.OUT=384.31 CB RIM=388.35 36"RCP INV.IN=381.61 36"RCP INV.OUT=381.28 CB RIM=388.34 36"RCP INV.IN=381.83 36"RCP INV.OUT=381.75 CB RIM=389.20 30"RCP INV.IN=382.12 36"RCP INV.OUT=382.02 CB RIM=388.71 24"RCP INV.IN(N)=383.51 24"RCP INV.OUT=383.07 48"RCPX2 INV.IN(W)=383.69 48"RCPx2 INV.OUT=384.75 CB RIM=389.77 36"RCP INV.IN=383.29 36"RCP INV.OUT=378.89 CB RIM=393.29 24"RCP INV.IN=388.04 30"RCP INV.OUT=387.89 CB RIM=392.96 18"RCP INV.IN=388.71 24"RCP INV.OUT=388.29 CB RIM=394.06 18"RCP INV.IN=389.39 18"RCP INV.OUT=389.29 CB RIM=395.61 36"RCP INV.IN=389.27 36"RCP INV.OUT=389.14 36"RCP INV.OUT=391.58 DI RIM=384.06 18"RCP INV.IN=380.55 18"RCP INV.OUT=380.66 DI RIM=387.63 36"RCP INV.IN=381.22 36"RCP INV.OUT=381.18 DMH RIM=383.26 36"RCP INV.IN=376.42 36"RCP INV.OUT=376.31 DMH RIM=386.53 36"RCP INV.IN(N)=377.92 36"RCP INV.IN(NW)=377.78 36"RCP INV.OUT=377.75 DMH RIM=388.38 24"RCP INV.IN(N)=383.09 30"RCP INV.IN(E)=384.82 30"RCP INV.OUT=384.33 24"RCP INV.OUT=383.62 DMH RIM=392.09 36"RCP INV.IN(N)=386.09 30"RCP INV.IN(E)=385.99 36"RCP INV.OUT=385.94 18"FES=383.82 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: DAW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\WZTC\Sheets\013276001_tcp_psh_9.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENING DAVIS PARK EAST MATCHLINE -L- STA. 32+50.00 (SEE SHEET R3.08)R3.09PLAN DETAILSTRAFFIC MANAGEMENT PHASE 3WORK AREA PAVEMENT REMOVAL -L-LC STATION 39+50 SECTION M-M 11'11' 3'3' WORK ZONE APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE354045E M P T +63.00+68.00+63.00TURN LANE 105' LT+63.00200' THRU LANE TAPER 300' WESTBOUND SHIFT +72.00+72.00M M 11' 11' 33' 11' 11' 11' 11' BEGIN -L- STA 39+63 P3 BEGIN -L- STA 41+63 P4 LANE TAPER 100' LT TURN P3 BEGIN END -L- STA 41+63 P2 P4 P2 P46 P2 P2 INSTALL END -L- STA 41+68 P61 BEGIN -L- STA 40+72 P1 P41 P1 P41END -L- STA 43+79 P1 P70 P72 P74 02030202 TO FINAL ELEVATION. INSTALL STRUCTURES 0202 AND 0203 (NC 54)S. MIAMI BOULEVARD(SR 1978) HOPSON ROAD -L- -L- Sta. 43+69.25 END CONSTRUCTION PAGE ROAD 0216 27' 22' 7.9' VAN VAN VAN VAN BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Pavement Marking & Signing\013276001_pmp_psh_4.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST MATCHLI NE -L- STA. 32+50.00 (SEE SHEET R4.01) R4.00AND SIGNING PLANPAVEMENT MARKING DENOTES SIGNALIZED INTERSECTION DENOTES EXISTING SIGNAL DENOTES NEW "U" CHANNEL POST/PROPOSED SIGN LOCATION DENOTES EXISTING "U" CHANNEL POST/EXISTING SIGN LOCATION DENOTES EXISTING SIGN DEPARTMENT STAFF PRIOR TO INSTALLATION. NAME SIGNS SHALL BE APPROVED BY THE TRANSPORTATION AND FACILITIES 5. ALL STREET NAME SIGNS SHALL ADHERE TO 2009 MUTCD. ALL STREET REFLECTIVE SHEETING. 4. THE BACKGROUND FOR TYPE E & F SIGNS SHALL BE TYPE C 3. REMOVE AND DISPOSE OF EXISTING SIGNS AND "U" CHANNEL POST. 2. ERECT EXISTING SIGN ON NEW "U" CHANNEL POST. 1. REMOVE AND DISPOSE OF EXISTING "U" CHANNEL POST. PAVEMENT MARKING SNOWPLOWABLE 4. ALL RAISED REFLECTIVE PAVEMENT MARKERS TO BE DRAWINGS. PLACED ACCORDING TO NCDOT ROADWAY STANDARD 3. RAISED REFLECTIVE PAVEMENT MARKERS ARE TO BE OR SYMBOLS IN CONFLICT WITH PROPOSED MARKINGS. 2. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS EXISTING MARKINGS AT PROJECT LIMITS. 1. CONTRACTOR TO TIE PROPOSED MARKINGS TO NOTES: PAVEMENT MARKER LEGEND - CRYSTAL / RED PAVEMENT MARKER - YELLOW / YELLOW PAVEMENT MARKER - DIRECTION OF TRAFFIC FLOW SIGNING LEGEND SIGNING NOTES PAVEMENT MARKING SYMBOLS PAVEMENT MARKING LINES T72 - THERMOPLASTIC (STRAIGHT ARROW) (90 MILS) T71 - THERMOPLASTIC (RIGHT TURN ARROW) (90 MILS) T46 - THERMOPLASTIC (8" WHITE, 90 MILS) CROSSWALK LINE T2 - THERMOPLASTIC (4" WHITE, 90 MILS) LANE LINE T70 - THERMOPLASTIC (LEFT TURN ARROW) (90 MILS) T10 - THERMOPLASTIC (4" YELLOW, 90 MILS) EDGELINE T61 - THERMOPLASTIC (24" WHITE, 90 MILS) STOPBAR T42 - THERMOPLASTIC (8" YELLOW, 90 MILS) DIAGONAL LINE T13 - THERMOPLASTIC (4" YELLOW, 90 MILS) YELLOW DOUBLE CENTER 500' ALONG HOPSON ROAD BE REMOVED EASTBOUND "RIGHT ONLY" SIGNS SHALL EASTBOUND THRU LANE ARROW MARKINGS IN ONLY" NUMERIC AND GRIND EXISTING "RIGHT T74 - THERMOPLASTIC (COMBO. RIGHT/STRAIGHT ARROW) (90 MILS) T3 - THERMOPLASTIC (4" WHITE, 90 MILS) 10 FT. SKIP T4 - THERMOPLASTIC (4" WHITE, 90 MILS) 3' - 9'/SP MINISKIP APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE202530-L- -L- (SR 1978) HOPSON ROAD KEYSTONE PARK DRI VEDRI VEDI STRI BUTI ON -L- Sta. 18+70.71 BEGIN PROJECT T74 T74 T71 T70 T71 T70 T70 T74 T72 T70 T72 T72 T71 T70 T46 T61 T61 T61 T61 T61 T61 T61 T46 T46T46 T46 END -L- STA 25+16 T2BEGIN -L- STA 23+91 T2 BEGIN END -L- STA 24+16 T4 T4 T4END -L- STA 21+16 T2 BEGIN END -L- STA 20+41 BEGIN END -L- STA 19+57 T2 END -L- STA 22+41 T4 BEGIN END -L- STA 20+41 T4 BEGIN -L- STA 25+34 T4 BEGIN END -L- STA 26+84 T4 T2 END -L- STA 28+10 T2 END -L- STA 28+14 END -L- STA 28+02 T13 T2 T3 T4 T4 T4 T3 T3 T13 T42 END -L- STA 32+20 T4 T2 END -L- STA 31+02 T4 T4 BEGIN END -L- STA 30+70 T4 T2BEGIN -L- STA 29+03 T3BEGIN -L- STA 29+05 T2BEGIN -L- STA 29+08 BEGIN END -L- STA 29+52 T2 -L- STA 29+14 BEGIN T3 T10T10BEGIN -L- STA 26+02 T10T10END -L- STA 27+84 T10T10 -L- STA 29+20 BEGIN T10T10END -L- STA 31+52 T10T10END -L- STA 21+73 SPEED4 5LIMIT SPEED45LIMIT ONE WAY STOP STOP STOP ONE WAY HOPSON RD. DISTRIBUTION DR. HOPSON RD. KEYSTONE PARK DR. ONLY11'11'11'11'5.5'11'11'11'11'11'11'5.5'11'5.5'11'11'11'11'11' 11' 1 4' SEE NOTE 3 REMOVE SEE NOTE 3 REMOVE RETAIN RETAIN RETAIN SEE NOTE 3 REMOVE SEE NOTE 3 REMOVE 30" X 36" R4-7 -L- STA 20+44 30" X 36" R4-7 -L- STA 27+84 T10 TIE TO EXIST BEGIN -L- STA 18+71 T10 T4 T10 T10 SEE NOTES 1 & 2 -L- STA 23+59 RELOCATE TO ONE WAYSEE NOTE 3 REMOVE SEE NOTES 1 & 2 -L- STA 28+38 RELOCATE TO T2 30" X 36" R4-7 -L- STA 29+22 STOP SEE NOTES 1 & 2 -L- STA 23+29 RELOCATE TO T72 T72 T2T4 SEE NOTE 3 REMOVE SPEED35LIMIT 30" X 36" R2-1 -L- STA 26+18 SEE NOTE 3 REMOVE T72 T74 T72 T72 SPEED35LIMIT 30" X 36" R2-1 -L- STA 30+39 SPEED35LI MI T 30" X 36" R2-1 -L- STA 18+43 BEGIN -L- STA 17+00 T3 36" X 36" W3-5 LI MIT S P E E D 35 11'11'11' BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Pavement Marking & Signing\013276001_pmp_psh_5.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST MATCHLINE -L- STA. 32+50.00 (SEE SHEET R4.00)R4.01AND SIGNING PLANPAVEMENT MARKING DENOTES SIGNALIZED INTERSECTION DENOTES EXISTING SIGNAL DENOTES NEW "U" CHANNEL POST/PROPOSED SIGN LOCATION DENOTES EXISTING "U" CHANNEL POST/EXISTING SIGN LOCATION DENOTES EXISTING SIGN DEPARTMENT STAFF PRIOR TO INSTALLATION. NAME SIGNS SHALL BE APPROVED BY THE TRANSPORTATION AND FACILITIES 5. ALL STREET NAME SIGNS SHALL ADHERE TO 2009 MUTCD. ALL STREET REFLECTIVE SHEETING. 4. THE BACKGROUND FOR TYPE E & F SIGNS SHALL BE TYPE C 3. REMOVE AND DISPOSE OF EXISTING SIGNS AND "U" CHANNEL POST. 2. ERECT EXISTING SIGN ON NEW "U" CHANNEL POST. 1. REMOVE AND DISPOSE OF EXISTING "U" CHANNEL POST.PAVEMENT MARKING SNOWPLOWABLE 4. ALL RAISED REFLECTIVE PAVEMENT MARKERS TO BE DRAWINGS. PLACED ACCORDING TO NCDOT ROADWAY STANDARD 3. RAISED REFLECTIVE PAVEMENT MARKERS ARE TO BE OR SYMBOLS IN CONFLICT WITH PROPOSED MARKINGS. 2. CONTRACTOR SHALL MILL ANY EXISTING MARKINGS EXISTING MARKINGS AT PROJECT LIMITS. 1. CONTRACTOR TO TIE PROPOSED MARKINGS TO NOTES: PAVEMENT MARKER LEGEND - CRYSTAL / RED PAVEMENT MARKER - YELLOW / YELLOW PAVEMENT MARKER - DIRECTION OF TRAFFIC FLOW SIGNING LEGEND SIGNING NOTES PAVEMENT MARKING SYMBOLS PAVEMENT MARKING LINES T72 - THERMOPLASTIC (STRAIGHT ARROW) (90 MILS) T71 - THERMOPLASTIC (RIGHT TURN ARROW) (90 MILS) T46 - THERMOPLASTIC (8" WHITE, 90 MILS) CROSSWALK LINE T2 - THERMOPLASTIC (4" WHITE, 90 MILS) LANE LINE T70 - THERMOPLASTIC (LEFT TURN ARROW) (90 MILS) T10 - THERMOPLASTIC (4" YELLOW, 90 MILS) EDGELINE T61 - THERMOPLASTIC (24" WHITE, 90 MILS) STOPBAR T42 - THERMOPLASTIC (8" YELLOW, 90 MILS) DIAGONAL LINE T13 - THERMOPLASTIC (4" YELLOW, 90 MILS) YELLOW DOUBLE CENTER 500' T74 - THERMOPLASTIC (COMBO. RIGHT/STRAIGHT ARROW) (90 MILS) T3 - THERMOPLASTIC (4" WHITE, 90 MILS) 10 FT. SKIP T4 - THERMOPLASTIC (4" WHITE, 90 MILS) 3' - 9'/SP MINISKIP APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE354045-L- -L-(NC 54)S. MIAMI BOULEVARD-L-(SR 1978) HOPSON ROAD -L- Sta. 44+01.87 END PROJECT T74 T72 T70 T61 T46 T46 T46 T46 T61 BEGIN END -L- STA 41+65 T4 T2 T4END -L- STA 41+47 T4BEGIN -L- STA 40+66 END -L- STA 43+65 END -L- STA 43+67 T2 END -L- STA 43+72 BEGIN -L- STA 39+65 T4 T3 T3 T10T10BEGIN -L- STA 40+48 T10T10BEGIN -L- STA 34+83 T10T10END -L- STA 35+54 11'11'11'11'11'11'11'11'11'11'11'11'SEE NOTE 3 REMOVE STOP STOP STOP RETAIN ONE WAY 36" X 12" R6-1 -L- STA 41+07 -L- STA 36+30 36" X 36" W3-3 T70 T10 T10 30" X 36" R4-7 -L- STA 43+64 ONE WAY36" X 12" R6-1 -L- STA 40+14 SPEED35LIMIT 30" X 36" R2-1 -L- STA 38+72 T70 T72 T74 T74 SPEED35LIMIT 30" X 36" R2-1 -L- STA 38+72 LIMITSPEED3536" X 36" W3-5 T74 PAGE ROAD VAN VAN VAN VAN DN UP F C F F F F F F C F C F F F F F F C F F C F F F F F F F F C CC C C E ICV E GTV C C WV BPFBPF GTS C C WV WV WV WVWV WV WV WV WV HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH T T 1 T 2 T 3 T 4 5 T T 6 T 7 P W W W W W W S YARD INLET YARD INLET YARD INLET YARD INLET 360 360 360 360365365365 3 6 5 365 3 6 5370370 370 370 370 370370375 375 3 7 5 375 375375 375380 380 380380385 385385385385 390390390395395395395 395 395 395395395 395 3953954004004 0 0 4004004004004008.70 AC. 407 DAVIS DRIVE D.B. 7361, PG. 42 PIN NO. 0747-03-13-4998 0.85 AC. 4511 HOPSON ROAD PIN NO. 0747-03-14-6630 D.B. 4697, PG. 396 D.B. 6301, PG. 761 4523 HOPSON ROAD 0.70 AC. 4603 HOPSON ROAD D.B. 8231, PG. 151 PIN NO. 0747-03-24-0620 3.17 AC. 4524 HOPSON ROAD D.B. 989, PG. 567 PIN NO. 0747-03-14-9163 0.86 AC. 4608 HOPSON ROAD D.B. 287, PG. 107 PIN NO. 0747-03-24-1187 PIN NO. 0747-03-23-1684 10.14 AC. 4610 HOPSON ROAD D.B. 2428, PG. 411 PIN NO. 0747-03-23-7335 11.95 AC. 4700 HOPSON ROAD D.B. 7072, PG. 284 D.B. 8468, PG. 30 PIN NO. 0747-03-24-6764 21.07 AC. 4701 HOPSON ROAD PIN NO. 0747-03-14-8632 NC REGION NO 15 EXCHANGE LLC MALLETT, ROBERT H. SEARLS, WENDY L. PROCTOR, RAYMOND M. PROCTOR, RAYMOND M. PROCTOR, RAYMOND M. NC DEPT. OF TRANSPORTATION DAVIS PARK EAST POD EF LLC. PRESCHOOL ENTERPRISES, LLC BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Erosion Control\013276001_ero_psh_4.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST MATCHLI NE -L- STA. 32+50.00 (SEE SHEET R5.01) R5.00 EROSION CONTROL MEASURES INLET PROTECITON BLOCK AND GRAVEL FENCE TEMPORARY SEDIMENT PLANEROSION CONTROL A WASH STATION WILL BE REQUIRED. 2. ALL PUBLIC STREETS TO BE KEPT CLEAN OF SEDIMENT AT ALL TIMES OR 1. TOTAL DISTURBED AREA FOR OFFSITE IMPROVEMENTS = 3.54 AC. NOTES: APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE CONDITION. EXPECTED TO REMAIN IN GOOD VEGETATED AND STABLE. EXISTING OUTFALL IS HEAVILY CONDITION. TO REMAIN IN GOOD AND STABLE. EXPECTED HEAVILY VEGETATED EXISTING OUTFALL IS CONDITION. EXPECTED TO REMAIN IN GOOD WITH DENSE VEGETATION AROUND OUTLET. EXISTING OUTFALL IS STABLE20 2530-L- Sta. 18+70.71 BEGIN CONSTRUCTION BEGIN PROJECT (SR 1978) HOPSON ROAD-L-DI STRI BUTI ON DRI VE(SR 1978)HOPSON ROAD-L-KEYSTONE PARK DRI VE202530FENCE (TYP.) TEMPORARY SILT DISTURBANCE (TYP.) LIMITS OF INLET PROTECTION (TYP.) BLOCK AND GRAVEL F F F F F F C F F F F C C C F F F F C F C C C F F F CC EOSAC AC AC AC D GT GT GT GT ICV ICV ICV ICV ICV ICV ICV ICV WV GTGTGTGT ICV ICV ICV ICV ICV GTS GV C C C CCC C WV WV WV WV WV WVWV W B6B6 B6 B6 B7 B8 B4 B6 B6 B4 B6 B4 B7 B6 O8 O11 O16 O12 O12 O12 O12 O12 O8 O12 O12 O12 HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HH HHHH EOS TT EOS T T T 8 T 9 T 10 11 T 12 T 13 T T 14 15 T 16 T 17 T 18 T W W W W W W W W WWWW W W W W W W W W W EOS S 49 40 46 53 ROOF DRAIN ROOF DRAIN INV.COVERED UNDER RIPRAP C HH 386.6 385.5 385.4 386.6 375375375 3 8 0 3803 8 0 380380380 3 8 0 380380380380 380 380385385 385385385385385385385385385385385385385385385 385385385385385 385 385385 385385390 390 390 3903903903 9 0 390 390 3903 9 0 390390390 390390 3953953 9 5 395395 395 400400400405 405PIN NO. 0747-03-33-2860 D.B. 4432, PG. 331 4.69 AC. 4804 HOPSON ROAD PIN NO. 0747-03-34-2391 0.42 AC. 4801 HOPSON ROAD D.B. 5444, PG. 342 PIN NO. 0747-03-34-3599 0.64 AC. 4803 HOPSON ROAD D.B. 5444, PG. 342 PIN NO. 0747-03-35-5362 13.63 AC. PIN NO. 0747-03-35-5362 13.63 AC.PIN NO. 0747-03-33-6832 6.92 AC. 4812 HOPSON ROAD D.B. 7879, PG. 362 D.B. 7270, PG. 31 PIN NO. 0747-03-34-8810 4805 HOPSON ROAD PIN NO. 0747-03-34-5371 0.82 AC. 4813 HOPSON ROAD D.B. 6516, PG. 602 D.B. 7270, PG. 31 PIN NO. 0747-03-34-8810 14.77 AC. 5508 S MIAMI BOULEVARD PIN NO. 0747-03-34-7391 0.82 AC. 4823 HOPSON ROAD D.B. 8217, PG. 163 PIN NO. 0747-03-34-9350 0.40 AC. 4827 HOPSON ROAD D.B. 8121, PG. 559 D.B. 7270, PG. 31 PIN NO. 0747-03-34-8810 5516 S MIAMI BOULEVARD PIN NO. 0747-03-33-9963 1.85 AC. 5600 S MIAMI BOULEVARD D.B. 7424, PG. 656 1.25 AC. 5630 S MIAMI BOULEVARD PIN NO. 0747-03-33-9549.L00 D.B. 6716, PG. 424 D.B. 4832, PG. 690 PIN NO. 0747-03-44-3587 5503 S MIAMI BOULEVARD D.B. 4455, PG. 428 PIN NO. 0747-03-44-3375 5507 S MIAMI BOULEVARD D.B. 8426, PG. 444 PIN NO. 0747-03-43-2998 D.B. 8426, PG. 444 PIN NO. 0747-03-43-2699 5611 S MIAMI BOULEVARD 5431 PAGE ROAD PIN NO. 0747-03-43-1890 5607 S MIAMI BOULEVARD EXEMPT LOT NORTH CAROLINA RAILROAD CO. NORTH CAROLINA RAILROAD CO. NORTH CAROLINA RAILROAD CO. NORTH CAROLINA RAILROAD CO.919 STORAGE HOPSON ROAD LLC TS CREEKSTONE LLC. THE CAROLINAS INC. NEW COMMUNICATIONS OF TS CREEKSTONE LLC. SVASTI HOLDINGS LLC.SVASTI HOLDINGS LLC. TS CREEKSTONE LLC. SPIRIT MASTER FUNDING VII LLC. COLE BK DURHAM NC, LLC ARBYS DURHAM, LLC TRIPLE NET VENTURES, LLC TRIPLE NET VENTURES, LLC ARCHLAND PROPERTY I, LLC WEATHERSPOON HEIRS CEMETERY RAILROAD CO. NORTH CAROLINA BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Erosion Control\013276001_ero_psh_5.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST MATCHLINE -L- STA. 32+50.00 (SEE SHEET R5.00)R5.01PLANEROSION CONTROL EROSION CONTROL MEASURES INLET PROTECITON BLOCK AND GRAVEL FENCE TEMPORARY SEDIMENT A WASH STATION WILL BE REQUIRED. 3. ALL PUBLIC STREETS TO BE KEPT CLEAN OF SEDIMENT AT ALL TIMES OR 2. NO WETLANDS OR STREAMS WITHIN LIMITS OF OFFSITE IMPROVEMENTS. 1. TOTAL DISTURBED AREA FOR OFFSITE IMPROVEMENTS = 3.54 AC. NOTES: APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE (SR 1978) HOPSON ROAD -L- (SR 1978) HOPSON ROAD -L-(NC 54)S. MIAMI BOULEVARD-L- Sta. 44+01.87 END CONSTRUCTION END PROJECT3540 45DISTURBANCE (TYP.) LIMITS OF FENCE (TYP.) TEMPORARY SILT INLET PROTECTION (TYP.) BLOCK AND GRAVEL PAGE ROAD354045 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Erosion Control\013276001_ero_DTL.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST R5.02DETAILSEROSION CONTROL CONSTRUCTION SEQUENCE MAINTENANCE PLAN is an essential part of an effective erosion and sedimentation control plan. maintenance of small eroded areas before they become significant gullies washouts or breaks occur, repair them immediately. Prompt remove all sediment from diversion and other water-disposal practices. If sedimentation control practices, especially after heavy rainfalls. Promptly Periodically check all graded areas and the supporting erosion and MAINTENANCE stabilization of these areas in the plan. make sure they are adequately protected from erosion. Include final 12. Show topsoil stockpiles, borrow areas, and spoil areas on the plans, and 15 working days or longer. measures on all graded areas when work is to be interrupted or delayed for completed on each area in the grading plan. Apply temporary stabilization 11. Permanently stabilize all graded areas immediately after final grading is with approved methods. 10. Handle seeps or springs encountered during construction in accordance during all phases of development. 9. Keep diversions and other water conveyance measures free of sediment slippage. 8. Do not place fill on a frozen foundation, due to possible subsidence and materials into fill slopes. 7. Do not incorporate frozen material or soft or highly compressible related problems. the layers as required to reduce erosion, slippage, settlement, or other 6. Place all fill in layers not to exceed 9 inches in thickness, and compact building debris, and other materials inappropriate for constructing stable fills. 5. Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, other objectionable material that would affect the planned stability of the fill. 4. Clear and grub areas to be filled to remove trees, vegetation, roots, or placing topsoil. 3. Scarify areas to be topsoiled to a minimum depth of 2 inches before it for use in finishing the grading of all critical areas. 2. Remove good topsoil from areas to be graded and filled, and preserve construction schedule. measures in accordance with the approved sedimentation control plan and 1. Construct and maintain all erosion and sedimentation control practices and CONSTRUCTION SPECIFICATIONS LAND GRADING (6.02) TOPSOILING (6.04)VEGETATIVE PLAN (NCDENR 6.11) fine gravel or sand may be needed to protect the filter cloth. Where large stones are used or machine placement is difficult, a 4-inch layer of If extensive damage is suspected, remove and replace the entire sheet. of filter material with a minimum overlap of 12 inches around the damaged area. If damage occurs remove the riprap and repair the sheet by adding another layer next section as required. Take care not to damage the cloth when placing riprap. ground and where necessary, bury the lower end of the cloth or overlap with the the overlap. Bury the upstream end of the cloth a minimum of 12 inches below Overlap the edges by at least 12 inches, and space anchor pins every 3 ft along Synthetic filter fabric - Place the cloth filter directly on the prepared foundation. layers with minimal mixing. specified depth. Where more than one layer of filter material is used, spread the foundation is prepared. For gravel, spread filter stone in a uniform layer to the Sand and gravel filter blanket - Place the filter blanket immediately after the ground inside dimensions and grade of the riprap meet design specifications. sufficiently to allow placement of the riprap in a manner such that the finished will be at the elevation of the surrounding area. Channels should be excavated material. Cut the subgrade sufficiently deep that the finished grade of the riprap depressions with riprap. Remove brush, trees, stumps and other objectional to a density approximating that of the surrounding undisturbed material or overfill lines and grades shown on the plans. Compact any fill required in the subgrade Subgrade Preparation - Prepare the subgrade for riprap and filter to the required CONSTRUCTION SPECIFICATIONS flow. Control of weed and brush growth may be needed in some locations. vigorous condition to protect the area from erosion and scour during out-of-bank immediately. Maintain all vegetation adjacent to the channel in a healthy, look for indications of piping, scour holes, or bank failures. Make repairs where concentrated flow enters. Carefully check stability at road crossings and promptly. Give special attention to the outlet and inlet sections and other points Inspect channels at regular intervals as well as after major rains, and make repairs MAINTENANCE riprap should be apparent. of the riprap should blend with the surrounding area. No overfall or protrusion of stone sizes to produce a relatively smooth, uniform surface. The finished grade stones. Hand placing may be necessary to achieve the proper distribution of The finished slope should be free of pockets of small stone or clusters of large the stones. stone sizes. Take care not to dislodge the underlying base or filter when placing riprap by dumping through chutes or other methods that cause segregation of final placement. Place riprap to its full thickness in one operation. Do not place be obtained by selective loading at the quarry and controlled dumping during a minimum of voids. The desired disbribution of stones throughout the mass may of the filter. Place riprap so that if forms a dense, well-graded mass of stone with Stone Placement - Placement of riprap should follow immediately after placement RIP RAP (6.15) retain sediment. Sediment barriers - Use sediment fences or other barriers where necessary to All stockpile areas used shall be stabilized with silt fence and seeded. topsoil is stockpiled in small piles located near areas where they will be used. traffic routes. On large sites, respreading is easier and more economical when Select stockpile location to avoid slopes and natural drainageways, avoiding STOCKPILING basins, diversions, and other controls into place before stripping. generally varies along a gradient from hilltop to toe of the slope. Put sediment soil cores at several locations within each area to be stripped. Topsoil depth but depth varies depending on the site. Determine depth of stripping by taking roadbuilding, or compaction by equipment. A 4 to 6-inch stripping depth is common, Strip topsoil only from those areas that will be disturbed by excavation, filling, STRIPPING identified by their extremely light weight when dry. Organic soils such as mucks and peats do not make good topsoil. They can be if it meets the other criteria listed above. desirable; however, material excavated from deeper layers may be worth storing Generally, the upper part of the soil, which is richest in organic matter, is most thickness affect the ease of excavation and spreading of topsoil. Soil factors such as rock fragments, slope, depth to water table, and layer The depth of material meeting the above qualifications should be at least 2 inches. Sodium - sodium adsorption ratio should be less than 12. Soluble salts - should be less than 500 ppm. it is less than 6.0. Acidity - pH should be greater than 3.6 before liming, and liming is required if greater than 1.5% by weight. Organic matter content - (sometimes referred to as "humic matter") should be soils such as peat or muck as topsoil. loam, clay loam, and loamy sand are fair. Do not use heavy clay and organic Texture - loam, sandy loam, and silt loam are best; sandy clay loam, silty clay handling. Quality topsoil has the following characteristics: Determine whether the quality and quantity of available topsoil justifies selective MATERIALS CONSTRUCTION SPECIFICATIONS to avoid excessive mixing of topsoil into the subsoil. After topsoil application, follow procedure for seedbed preparation, taking care between topsoil and subsoil. after spreading topsoil. A disk may be used to promote bonding at the interface On slopes and areas that will not be mowed, the surface may be left rough high-maintenance turf is to be established. germination. Light packing with a roller is recommended where but avoid excessive compaction, as it increases runoff and inhibits seed Compact the topsoil enough to ensure good contact with the underlying soil, water pockets. topsoiling or other operations to prevent the formation of depressions or wet or frozen. Correct any irregularities in the surface that result from Do not spread topsoil while it is frozen or muddy or when subgrade is SPREADING TOPSOIL the soil to a depth of at least 6 inches before spreading topsoil. the topsoil and subsoil. If no amendments have been incorporated, loosen by disking or scarifying to a depth of at least 4 inches, to ensure bonding of Roughening - Immediately prior to spreading the topsoil. loosen the subgrade Incorporate lime to a depth of at least 2 inches by disking. recommended by soil tests or specified for the seeding mixture to be used. soil is composed of heavy clays, incorporate agricultural limestone in amounts Liming of subsoil - Where the pH of the existing subsoil is 6.0 or less, or the approved plan and do not alter them by adding topsoil. Grading - Maintain grades on the areas to be topsoiled according to the such as diversions, berms, dikes, waterways, and sediment basins. Before spreading topsoil, establish erosion and sedimentation control practices SITE PREPARATION growth. must be stabilized with permanent vegetation to control erosion and weed Permanent vegetation - If stockpiles will not be used within 12 months they formation of the stockpile. as possible, no more than 30 working days or 120 calendar days after the Temporary seeding - Protect topsoil stockpiles by temporarily seeding as soon Slopers flatter than 4:1- 14 days Slopes between 3:1 and 4:1 greater than 50' in length- 7 days Slopes between 3:1 and 4:1 less than 50' in length-14 days Slopes between 2:1 and 3:1 less than 10' in length- 14 days Slopes between 2:1 and 3:1 greater than 10' in length- 7 days Slopes 2:1 or steeper- 7 days High Quality Water Zones- 7 days Perimeter dikes, swales, ditches and slopes- 7 days per the following guidlines. areas within 7 or 14 days of termination of grading operations Contractor shall stabilize (temporary or permanent) all disturbed table or sooner of completion of any phase of grading. or other areas within the timeframe speficied in the stabilization 6. The Contractor shall provide ground cover on exposed slopes or causes a visible increase in turbidity of any waterbody. sediment is deposited off site or into stream or wetland, streams or wetlands. Corrective action must be taken if runoff leaves the site and evaluate the effect on nearby 5. The Contractor must inspect all outlets where stormwater cover. vegetative plan to maintain a vigorous, dense vegetative mulch all seeded areas according to specifications in the 4. The Contractor shall fertilize, reseed as necessary, and to maintain a barrier. fence. Silt fence will be repaired as necessary fence when it becomes 0.5 feet deep at the 3. The Contractor shall remove sediment from behind silt sediment pool no longer drains properly. filled. Gravel will be cleaned or replaced when the basin when storage capacity has been approximately 50% 2. The Contractor shall remove sediment from sediment half inch of rainfall and once a week. the Contractor must be made and logged after every The rain gauge must be kept onsite and inspections by stormwater permit, a rain gauge must be installed on site. Pollutant Discharge Elimination System (NPDES) general to maintain all practices as designed. Also per National needed repairs will be made immediately by the Contractor period) but in no case less than once every week. Any following every runoff producing 0.5" rainfall (in a 24 hour control practices for stability and operation within 24 hours 1. The Contractor shall inspect all erosion and sediment Land Resources at (919) 791-4200. or cannot access the form, please contact NCDENR Division of http://portal.ncdenr.org/web/lr/erosion. If you have questions form is available as an Excel spreadsheet from 113A-54.1 and 15A NCAC 4B.0131. The Self-Inspection Report permanent ground cover is established in accordance with NCGS conducted after each phase of the project, and continue until according to the approved plan. The inspections must be maintenance of erosion and sedimentation control measures focus of the self-inspection report is the installation and the NPDES Stormwater Permit for Construction Activities. The program is separate from the weekly self-monitoring program of inspections took effect October 1, 2010. The self-inspection being followed. Rules detailing the documentation of these sure that the approved erosion and sedimentation control plan is inspect a project after each phase of the project to make to require that persons responsible for land-disturbing activities The Sedimentation Pollution Control Act was amended in 2006 Self-Inspection Program: Notification of Land Resources Sediment and Erosion Control sequence schedule in advance to maintain management control. When changes in construction activities are needed, amend the Follow the construction sequence throughout project development. MAINTENANCE 10. Remove soil erosion control measures and stabilize these areas. 9. Request final approval by Erosion Control Officer; cover is established; Maintain soil erosion control measures until permanent ground8. shorter, after any phase of grading; shown on ground stabilization requirements, whichever is 7. Seed and mulch denuded area within 15 days or duration 6. Clean sediment basins when one-half full; 5. Proceed with grading; by Erosion Control Officer; 4. Obtain certificate of compliance through on-site inspection 3. Install all erosion control measures as shown; 2. Obtain grading permit; 1. Request preconstruction meeting. CONSTRUCTION SPECIFICATIONS Adventure II Chieftain Approved Tall Fescue Cultivars Adventure Debutante Amigo Anthem Apache Apache II Arid Austin Brookstone Bonanza Bonanza II Chapel Hill Chesapeake Coronado Crossfire II Duster Falcon Falcon II Finelawn Petite Finelawn Finelawn I Genesis Grande Guardian Mustang Olympic Phoenix Pixie Pyramid Rebel Tempo Tribute Wolfpack of plant flood as a 10-20-20 analysis. maintained and the rate of application adjusted to provide the same amount a different analysis of fertilizer may be used provided the 1-2-2 ratio is Fertilizer shall be 10-20-20 analysis. Upon written approval of the Engineer, SEEDBED PREPARATION APPLYING AND COVERING LIMESTONE, FERTILIZER, AND SEED B) C) GRASS-LINED CHANNELS (6.30) establishment period. or a temporary liner sufficient to withstand anticipated velocities during the severity of the conditions and selection of species. Protect the channel with mulch 4. The procedure used to establish grass in the channel will depend upon the enter the channel freely. 3. Remove and properly dispose of all excess soil so that surface water may during seedbed preparations and sod buildup. the plans plus a 0.2-ft overcut around the channel perimeter to allow for bulking 2. Excavate the channel and shape it to neat lines and dimensions shown on foundation area and dispose of properly. 1. Remove all trees, brush, stumps, and other objectionable material from the CONSTRUCTION SPECIFICATIONS condition at all times, since it is the primary erosion protection for the channel. maintain the designed carrying capacity. Keep the grass in a healthy, vigorous of piping or scour holes. Remove all significant sediment accumulations to check the channel outlet and all road crossings for bank stability and evidence heavy rainfall event. Immediately make repairs. It is particularly important to After grass is established, periodically check the channel; check it after every During the establishment period, check grass-lined channels after every rainfall. MAINTENANCE APPLYING AND COVERING LIMESTONE, FERTILIZER, AND SEED A) A) MULCHING B) of approval. material will be established by the Engineer at the time material, or other conditions governing the use of such methods and rates of application, the type of binding approved by the Engineer, the seasonal limitations, the requested by the Contractor and the use of such material is permissions to use material other than grain straw is Grain straw may be used as mulch at any time of year. If in the special provisions or directed by the Engineer. All seeded areas shall be mulched unles otherwise indicated GENERAL: C) the ground, reduce erosion, and conserve soil moisture. penetrate and air to circulate but will also partially shade application will be that which will allow some sunlight to provide an acceptable application. An acceptable by approved mechanical spreaders or blowers that will operations. Mulch shall be uniformly spread by hand or or other damage to the seeded area during the mulching shall be exercised to prevent displacement of soil or seed seeding unless otherwise permitted by the Engineer. Care Mulch shall be applied within 24 hours after completion of APPLYING MULCH: any blockage to drainage facilities that may occur. by wind, water, or other causes and shall promptly remove mulch from entering drainage structures through displacement The Contractor shall take sufficient precautions to prevent that may be necessary. occurs the Contractor shall repair it, including any cleaning required to avoid such damage. When such damage adequate covering or change methods of application as other appurtenances. The Contractor shall either provide traffic, structures, guardails, traffic control devices, or any adequate precautions shall be taken to prevent damage to approved binding materials which may cause damage, During the application of asphalt binding material, or other mulch application. with the mulch it shall be applied immediately following the Engineer. Where the binding material is not applied directly application of binding material shall meet the approval of the the mulch is properly held in place. The rate and method of of asphalt or other approved binding material to assure that Mulch shall be held in place by applying a sufficient amount HOLDING MULCH:GROUND STABILIZATION REQUIREMENTS SEEDING AND MULCHING Jaguar Hawk Houndog Jaguar III Kentucky 31 Kitty Monarch Montauk Pacer Rebel Jr.Rebel II Renegade Safari Shenandoah Titan Tomahawk Trailblazer Vegas Wrangle January 1-December 31. On cut and fill slopes 2:1 or steeper, add 30# (23kg) Sericea Lespefeza unfavorable working condition. extremely wet, or when the Engineer determines that it is an otherwise The preparation of seedbeds shall not be done when the soil is frozen, shall be limited to a depth of 2 to 3 inches. Seedbed preparation within 2 feet of the edge of any pavement seedbed preparation may be reduced or eliminated. preparation is still in a condition acceptable to the Engineer, additional of the slope. If at the time of seeding and mulching operations such the preparation of a partial or complete seedbed during the grading On cut slopes that are either 2:1 or steeper, the Engineer may permit necessary to seed these sections with a hydro-seeded. shall be responsible for providing the required seed bed. It may be ridges, or trenches in which the seeding materials can lodge. Contractor scarified, grooved, trenched, or punctured so as to provide pockets, permitted by the Engineer, but in all cases the slope surface shall be and the degree of smoothness of the seedbed may be reduced as On cut slopes that are 2:1 and steeper, both the depth of preparation prior to the application of seed and fertilizer. median, shoulder, and ditch cut or fill slopes which are 3:1 or flatter, Engineer. All rock and debris 3 inches or larger shall be removed on pulverizers, drags,or harrows; or by other methods approved by the of soil shall be worked into an acceptable seedbed by the use of soil directed by the Engineer. Clods shall be broken and the top 2 to 3 inches less than 5 inches except as otherwise provided below or otherwise The soil shall then be scarified or otherwise loosened to a depth of not subsequent mowing operations. Engineer to provide for more effective seeding and for ease of preparation operations, shall be shaped and smoothed as directed by the other minor irregularities which cannot be obliterated by normal seedbed and ditch spoil banks, fence line and hedgerow soil accumulations, and outside of the graded section, such as crop rows, farm contours, ditches, unacceptable growth on the areas to be seeded. Uneven and rough areas The Contractor shall cut and satisfactorily dispose of weeds or other including any cleaning that may be necessary. When such damage occurs the Contractor shall repair it, change methods of application as required to avoid such damage. Contractor shall either provide adequate drainage covering or traffic control devices, or any other appurtenances. The be taken to prevent damage to traffic, structures, guardrails, During the application of fertilizer, adequate precautions shall for such operations. determines the weather and soil conditions are unfavorable be distributed and no seed shall be sown when the Engineer permitted by the Engineer, but no limestone or ferilizer shall after completion of seedbed preparation unless otherwise Limestone, fertilizer, and seed shall be applied within 24 hours equipment operation damages the seed. maintained in satisfactory working condition, or if the Approval may be revoked at any time if equipment is not approved by the Engineer before being used on the project. compaction of limestone, fertilizer, and seed shall have been Equipment to be used for the application, covering, or fertilizer, and seed shall be as stated in the special provisions. fertilizers; the kinds of seed; and the rates of application of limestone, Seasonal limitation for seeding operations; the kinds of grades of GENERAL: that the required rate of fertilizer is applied uniformly. other than a hydraulic seeder,shall be calibrated to ensure the container. Application equipment for liquid fertilizer, any time the amount of liquid that has been removed from metering devices which will enable the Engineer to record at containers shall be equipped with approved measuring or for agitation of the liquid prior to its use. The storage fertilizer shall be located on the project and shall be equipped If liquid fertilizer is used, storage containers for the liquid worked or mixed into the seedbed. application and then harrowed, raked, or otherwise thoroughly uniformly over the prepared seedbed at the specified rate of If not so applied, limestone and fertilizer shall be distributed preparation, provided it is immediately worked into the soil. Limestone may be applied as a part of the seedbed LIMESTONE AND FERTILIZER: approved by the Engineer. seedbed shall be compacted in the manner and degree Immediately after seed has been properly covered the unless otherwise permitted by the Engineer. fertilizer for more than 30 minutes prior to application and fertilizer, the seed shall not remain in water containing When a hydraulic seeder is used for application of seed drill, or drilled lightly following the initial drilling operation. be sown broadcast or with a special attachment to the covering, the seeding requiring the lighter covering may of seed are being used which require different depth of has been applied and worked into the soil. If 2 kinds fertilizer may be drilled in with the seed after limestone When a combination seed and fertilizer drill is used, separately. require different depths of covering, they shall be sown by the Engineer. If 2 kinds of seed are to be used which with a layer of soil. The depth of covering shall be as directed dragged, raked, or otherwise worked so as to over the seed required rate of application, and immediately harrowed, Seed shall be distributed uniformly over the seedbed at the SEED: Date Type Planting RateDateType Tall Fescue Tall Fescue Date Mar. 1-Aug. 31 50 lbs./acre Centipede 5 lbs./acre 25 lbs./acre Fertilizer 500 lbs./acre Hulled Common Bermudagrass Limestone 4000 lbs./acre Sep. 1-Feb. 28 50 lbs./acre Centipede 5 lbs./acre Unhulled Common Bermudagrass 35 lbs./acre Fertilizer Limestone 500 lbs./acre 4000 lbs./acre Slopes (2:1 and steeper) and Waste & Borrow Locations Jan. 1-Dec. 31 Tall Fescue 75 lbs./acre Unhulled Common Bermudagrass 35 lbs./acre Fertilizer Limestone 500 lbs./acre 4000 lbs./acre SEEDING AND MULCHING by the Engineer. overlapping dates, the kind of seed to be used shall be determined fertilizer, and limestone shall be as stated below. During periods of The kinds of seed and fertilizer, and the rates of application of seed, APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA1"=50'DRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Erosion Control\013276001_ero_DTL.dgn11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST DETAILSEROSION CONTROL R5.03 LINE WIRES MINIMUM 10 GAUGE SIDE VIEW FRONT VIEW STANDARD TEMPORARY SILT FENCE DIRECTED BY ENGINEER ANCHOR SKIRT AS OVER SKIRT 6" MINIMUM COVER GRADE FILL SLOPE SILT FENCE FABRIC WOVEN WIRE FABRIC STEEL POST 32" MIN. WIDTHAREAS OF CONCENTRATED FLOW. DOES NOT EXCEED 1/4 ACRE AND NEVER IN USE SILT FENCE ONLY WHEN DRAINAGE AREA :NOTE VARIABLE AS DIRECTED BY THE ENGINEER WIRE FROM TOP INSTALLED TO SECOND SILT FENCE FABRIC INTERMEDIATE WIRES GAUGE 2 1MINIMUM 12 GRADE 8'-0" MAXIMUM 3'-0"2'-0"26"* * * USE REINFORCED SILT FENCE OUTLET DETAIL FOR REPAIR OF SILT FENCE FAILURES DEWATERING CONCRETE BLOCK 2:1 SLOPE, GRAVEL FILTER TEMPORARY SEDIMENT POOL WIRE SCREEN DEWATERING 1' MIN. 2' MAX. SEDIMENT 16" ton "Sediment Control Stone". 7. No. 57 stone shall be paid for at the contract unit price per #57 WASHED STONE remaining drainage area has been properly stabilized. 6. Structures shall be removed and the area stabilized when the suitable area and in such a manner that it will not erode. depth of the trap. Removed sediment shall be deposited in a dimensions when the sediment has accumulated to •the design 5. Sediment shall be removed and the trap restored to its original made as needed. 4. The structure shall be inspected after each rain and repairs smooth it to an even grade. Use DOT #57 washed stone. inches below the top of the block on a 2:1 slope or flatter and 3. Use clean gravel,ƒto •-inch diameter, placed 2 •-inch openings over all block openings to hold gravel in place. 2. Carefully fit hardware cloth or comparable wire mesh with by placing 2x4 wood studs through block openings. overflow occurs. If needed, give lateral support to subsequent rows storm drain for lateral support and to avoid washouts when Place the bottom row of blocks against the edge of the be excavated at least 2 inches below the crest of the storm drain. the button row to allow pool drainage. The foundation should 1. Lay one block on each side of the structure on its side in CONSTRUCTION SPECIFICATIONS drain holes. 2. Use block & gravel device or acceptable alternative over grate pavement locations. 1. Use block and gravel inlet protection when inlet is at existing NOTES: BLOCK AND GRAVEL INLET PROTECTION (6.52) APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/2020A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC 1"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 350 350 355 355 360 360 365 365 370 370 375 375 380 380 18+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 19+00.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 19+50.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 385 385 20+00.00 350 350 355 355 360 360 365 365 370 370 375 375 380 380 20+50.00 -L- R6.00 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE EXIST SS LINE APPROX. LOCATION 0.050368.41S.S.369.07 EXIST EXIST SS LINE APPROX. LOCATION370.16S.S.370.81 0.052 EXIST EXIST SS LINE APPROX. LOCATION DRIVEWAY DISTRIBUTION DRIVE EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0102) FL 369.65 4:1 0.059 0.059374.37369.89S.S.369.79 S.S.375.12 371.953:1374.00 4:1 EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0102) FL 370.75 15" RCP (0103) FL 368.31 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 355 355 360 360 365 365 370 370 375 375 380 380 385 385 21+00.00 355 355 360 360 365 365 370 370 375 375 380 380 385 385 21+50.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 22+00.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 22+50.00 360 360 365 365 370 370 375 375 380 380 385 385 390 390 23+00.00 -L- R6.01 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE2:14:1 0.048 0.048375.20371.97S.S.370.22 S.S.376.02 373.61375.023:1EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 3:14:1 0.037 0.037376.39373.98S.S.366.03 S.S.377.07 375.26376.043:1EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 3:14:1 0.034 0.034377.94375.74376.67377.02S.S.367.59 S.S.378.31 376.923:1377.40 EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0111) FL 375.07 15" RCP (0114) FL 372.55 3:14:1 0.034 0.034379.59377.40378.32378.83S.S.367.76 S.S.380.74 378.583:1379.57 EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0111) FL 377.21 15" RCP (0114) FL 374.273:14:1 0.034 0.034381.25379.05379.98380.49S.S.372.30 S.S.381.31 380.23EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0112) FL 378.91 15" RCP (0114) FL 375.99 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 360 360 365 365 370 370 375 375 380 380 385 385 390 390 23+50.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 24+00.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 405 405 24+50.00 375 375 380 380 385 385 390 390 395 395 400 400 25+00.00 380 380 385 385 390 390 395 395 400 400 25+50.00 -L- R6.02 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE3:10.031 0.031 380.83381.67382.12S.S.377.18 SITE DRIVE 381.90EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0112) FL 379.27 (0113) 36.01' - 15" RCP @ 3.50%23+50.00 FL 378.92 23+50.00 FL 377.66 15" RCP (0115) FL 378.92 15" RCP (0119) FL 377.66 3:14:1 0.019 0.020384.51383.02383.59383.89S.S.379.28 S.S.384.81 383.74EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0115) FL 380.69 15" RCP (0116) FL 380.69 15" RCP (0119) FL 379.87 4 :14:1 0.008 0.020386.10385.12385.70385.91S.S.383.43 S.S.387.52 385.85EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0116) FL 382.70 15" RCP (0119) FL 382.19 4 :1 4 :1 0.003 0.020388.02387.47388.04388.17S.S.385.85 S.S.388.95 388.19EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0116) FL 384.77 15" RCP (0119) FL 384.52 4 :1 4:1 0.014 0.020390.08389.88390.49390.50S.S.389.22 S.S.390.31 390.61EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0116) FL 386.84 15" RCP (0119) FL 386.84 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 380 380 385 385 390 390 395 395 400 400 26+00.00 385 385 390 390 395 395 400 400 405 405 26+50.00 385 385 390 390 395 395 400 400 405 405 410 410 27+00.00 385 385 390 390 395 395 400 400 405 405 410 410 27+50.00 390 390 395 395 400 400 405 405 28+00.00 390 390 395 395 400 400 405 405 410 410 28+50.00 -L- R6.03 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE4:14:1 0.020 0.020392.30392.30393.02392.87S.S.392.26S.S.392.41 393.02EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0121) FL 389.14 4 :14:1 0.020 0.013394.71394.93S.S.395.10S.S.394.45 395.44EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0123) FL 391.94 4 :14:1 0.020 0.002396.77397.35S.S.397.20 S.S.396.38 397.50EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0123) FL 393.72 4:14:1 0.020 0.009398.08399.01S.S.398.73S.S.398.13 398.80EXIST WATER LINE APPROX. LOCATION EXIST SS LINE APPROX. LOCATION 15" RCP (0123) FL 395.51 4:14:1 0.020 0.020398.54399.91S.S.399.56S.S.399.09 399.35EXIST WATER LINE APPROX. LOCATION 4:10.030 0.030 400.35S.S.400.24399.14SITE DRIVE EXIST WATER LINE APPROX. LOCATION EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 390 390 395 395 400 400 405 405 410 410 29+00.00 385 385 390 390 395 395 400 400 405 405 410 410 29+50.00 385 385 390 390 395 395 400 400 405 405 410 410 30+00.00 380 380 385 385 390 390 395 395 400 400 405 405 410 410 30+50.00 380 380 385 385 390 390 395 395 400 400 405 405 410 410 415 415 31+00.00 -L- R6.04 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE4:14 :1 0.030 0.030 397.23399.83S.S.399.92 S.S.398.19 398.61EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 4 :14:1 0.030 0.030 396.70398.96S.S.396.91S.S.397.14 398.08EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 3:14:1 0.030 0.030 396.17398.43S.S.394.95 S.S.395.88 397.54EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0124) FL 393.00 2:14:1 0.030 0.030 395.79397.90S.S.391.25 S.S.393.70 397.01EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 18" RCP (0127) FL 391.13 18" RCP (0133) FL 391.13 EXIST 2:14:1 0.030 0.030 395.42397.36S.S.392.63S.S.393.01 396.48EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 380 380 385 385 390 390 395 395 400 400 405 405 410 410 31+50.00 385 385 390 390 395 395 400 400 405 405 410 410 32+00.00 385 385 390 390 395 395 400 400 405 405 410 410 32+50.00 380 380 385 385 390 390 395 395 400 400 405 405 410 410 33+00.00 380 380 385 385 390 390 395 395 400 400 405 405 33+50.00 -L- R6.05 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE2:14:1 0.024 0.024395.09396.63S.S.392.41 S.S.395.03 395.94EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0130) FL 392.8815" RCP (0129) FL 391.90 4:1 4:1 0.020 0.013394.68395.74395.51395.30S.S.392.92 S.S.394.75 395.41EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0131) FL 392.30 15" RCP (0132) FL 391.53 4 :1 4:1 0.020 0.002394.15394.85394.88394.72S.S.392.71 S.S.394.06 394.87EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0131) FL 391.41 15" RCP (0132) FL 390.99 4 :14:1 0.010 0.009393.57393.59393.91393.90S.S.392.59S.S.392.61 393.98EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0202) FL 390.23 4 :1 4:1 0.001 0.020392.48391.80392.38392.53S.S.391.83S.S.391.41 392.53EXIST FSS LINE APPROX. LOCATION FL 388.68 15" RCP (0204) BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 380 380 385 385 390 390 395 395 400 400 405 405 410 410 34+00.00 375 375 380 380 385 385 390 390 395 395 400 400 34+50.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 35+00.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 35+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 36+00.00 -L- R6.06 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE4:14:1 0.012 0.015390.83389.94390.41390.61S.S.389.94S.S.390.32 390.52EXIST FSS LINE APPROX. LOCATION 15" RCP (0204) FL 386.72 4 :1 4:1 0.014 0.004388.89388.09388.28388.69S.S.387.64 S.S.388.59 388.31EXIST EXIST FSS LINE APPROX. LOCATION 15" RCP (0208) FL 385.25 15" RCP (0238) FL 385.25 EXIST EXIST 4 :1 4:1 0.007386.77386.25S.S.385.91 S.S.386.71 0.010 EXIST 0.005 EXIST 386.12EXIST BRIDGE EXIST BRIDGE PROVIDED 16' OF CLEARANCE 403.00 403.90 402.70 EXIST FSS LINE APPROX. LOCATION 4 :1 4:1 0.018385.01384.78384.40384.76S.S.383.79 S.S.385.05 0.003 EXIST 0.015 EXIST 384.32EXIST FSS LINE APPROX. LOCATION 4:1 383.34382.98S.S.383.18 0.019 EXIST 0.027 EXIST 383.013:1382.10 0.022 383.60383.13S.S.382.253:1EXIST FSS LINE APPROX. LOCATION 15" RCP (0218) FL 380.02 15" RCP (0217) FL 380.17 BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 370 370 375 375 380 380 385 385 390 390 395 395 400 400 36+50.00 365 365 370 370 375 375 380 380 385 385 390 390 395 395 400 400 37+00.00 370 370 375 375 380 380 385 385 390 390 395 395 37+50.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 38+00.00 370 370 375 375 380 380 385 385 390 390 395 395 400 400 38+50.00 -L- R6.07 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 4:1 382.37381.99S.S.382.42 0.002 EXIST 0.03 EXIST 2:10.022 382.78382.32S.S.378.41 15" RCP (0209) FL 379.44 15" RCP (0217) FL 379.40 15" RCP (0218) FL 379.0215" RCP (0241) FL 379.02 4:1 381.95381.48S.S.379.61 0.008 EXIST 0.04 EXIST 381.880.011 382.14381.94S.S.379.333:1EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0224) FL 378.84 15" RCP (0240) FL 378.65 48" RCP (0239) FL 375.64 4:1 0.010382.28382.11S.S.380.39 382.060.000 381.98382.06S.S.380.123:1EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0216) FL 378.94 (0223) 29.96' - 48" RCP @ 3.50% 37+50.07 FL 377.41 37+50.00 FL 376.36 15" RCP (0224) FL 379.09 15" RCP (0225) FL 379.11 FL 376.36 48" RCP (0222) 4:1 0.001382.61382.72S.S.381.49 382.734 :1 0.011 382.31382.66S.S.382.25 EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0224) FL 379.34 15" RCP (0225) FL 379.74 4 :1 4:1 0.012 0.020383.34383.11383.68383.73S.S.382.80S.S.382.99 383.80EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0233) FL 380.03FL 380.38 15" RCP (0225) BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 375 375 380 380 385 385 390 390 395 395 39+00.00 375 375 380 380 385 385 390 390 395 395 39+50.00 375 375 380 380 385 385 390 390 395 395 40+00.00 380 380 385 385 390 390 395 395 400 400 40+50.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 41+00.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 41+50.00 -L- R6.08 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 4 :14:1 0.020 0.020384.19384.19384.77384.76S.S.384.713:1S.S.384.73 383.57 384.90EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0227) FL 381.19 15" RCP (0233) FL 381.02 15" RCP (0234) FL 381.02 4:14:1 0.020 0.020385.27385.30385.87385.85S.S.386.24 384.52 S.S.385.953:1386.01EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0227) FL 382.20 15" RCP (0234) FL 381.69 4:14 :1 0.020 0.020386.36386.40387.05386.93S.S.387.29S.S.387.39 387.11EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0228) FL 383.10 15" RCP (0234) FL 382.38 4:14 :1 0.020 0.020387.25387.31387.95387.82S.S.387.94 S.S.389.65 388.02EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0228) FL 383.52 15" RCP (0234) FL 383.07 4 :1 4 :1 0.020 0.020387.61387.02S.S.386.12 S.S.390.04 388.39EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0228) FL 383.93 15" RCP (0235) FL 383.48 EXIST 4 :1 4 :1 0.020 0.015387.76387.98S.S.387.17 S.S.389.89 388.54EXIST WATER LINE APPROX. LOCATION EXIST FSS LINE APPROX. LOCATION 15" RCP (0228) FL 384.34 15" RCP (0229) FL 384.34 15" RCP (0236) FL 383.96 EXIST BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINA11/6/20201"=10'CROSS-SECTIONSROADWAYDRAWN BY: TDW 11/6/2020K:\DUR_Roadway\013276001 - Davis Park East Pod B\Plan\Cross-Sections\013276001_xpl_L.dgnDURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OS IMPROVEMENTSHOPSON WIDENING DAVIS PARK EAST 00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 375 375 380 380 385 385 390 390 395 395 400 400 405 405 42+00.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 42+50.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 43+00.00 375 375 380 380 385 385 390 390 395 395 400 400 405 405 43+50.00 380 380 385 385 390 390 395 395 400 400 405 405 44+00.00 -L- R6.09 APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE 4:1 0.020 0.020387.91S.S.388.56 388.69EXIST WATER LINE APPROX. LOCATION EXIST WATER LINE APPROX. LOCATIONEXIST FSS LINE APPROX. LOCATION 15" RCP (0229) FL 384.59 4:1 0.020 0.020388.06S.S.388.58 388.84EXIST FSS LINE APPROX. LOCATION 15" RCP (0229) FL 384.85 388.994:1 0.013388.47S.S.388.60 EXIST WATER LINE APPROX. LOCATION 15" RCP (0231) FL 385.07 4:1 0.002389.01389.14S.S.389.19 EXIST WATER LINE APPROX. LOCATION 15" RCP (0232) FL 385.30 EXIST SS LINE APPROX. LOCATION 15" RCP (0242) FL 387.26 64'64'64'64'DUKE ENERGY CAROLINAS, LLCNORTHERN TELECOM 100kV64' TRANSMISSION RIGHT OF WAYDWG REF.:001546-376918DUKE ENERGY CAROLINAS, LLCNORTHERN TELECOM 100kV64' TRANSMISSION RIGHT OF WAYDWG REF.:001546-376919NORTH CAROLINA RAILROAD COMPANYVARIABLE WIDTH RIGHT OF WAYNORTH CAROLINA RAILROAD COMPANYVARIABLE WIDTH RIGHT OF WAYDUKE ENERGY CAROLINAS, LLCNORTHERN TELECOM 100kV64' TRANSMISSION RIGHT OF WAYDWG REF.:001546-376918DUKE ENERGY CAROLINAS, LLCNORTHERN TELECOM 100kV64' TRANSMISSION RIGHT OF WAYDWG REF.:001546-376919NORTH CAROLINA RAILROAD COMPANYVARIABLE WIDTH RIGHT OF WAYNORTH CAROLINA RAILROAD COMPANYVARIABLE WIDTH RIGHT OF WAY 60''98'135BYDATEREVISIONSNo.DATESHEET NUMBER CHECKED BY: CWB SCALEDESIGNED BY: CWB KHA PROJECT013276001NORTH CAROLINADRAWN BY: TDW 11/6/2020$FILE$11/6/2020DURHAMWWW.KIMLEY-HORN.COMNC LICENSE #: F-0102© 2020PHONE: 919-682-3583A NILTR NF E ONORP SEAL E G EENI R OISS LAN 34391 H O C RA KCEB .W KCI WDAHC DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS300 MORRIS STREET, DURHAM, NC 27701, SUITE 200OFFSITE IMPROVEMENTSHOPSON ROAD WIDENINGDAVIS PARK EAST PROJECT BEGIN NOT TO SCALE VICINITY MAP (54 (54 (54 EMPEROR BLVD.S MIAMI BLVD. (NC 54)SLATER RD. PROJECT END HOPSON RD. (SR 1978) SLATER RD. (NC 54)DAVIS DRIVE (SR 1999)TRAIN MOVEMENTS/DAY TRAIN SPEED RAILROAD MILEPOST ROADWAY SPEED LIMIT N. C. DEPARTMENT OF TRANSPORTATION ENGINEERING & SAFETY BRANCH CADD NO. REVISIONSSCALE: DATE: PREPARED BY: REVIEWED BY: APPROVED BY: CROSSING NO. RAIL DIVISION WORK DONE BY MUNICIPAL CONTRACTOR: DIVISION 5 IMPROVEMENTS BY RAILROAD: R7.00FIGURERAILROAD CROSSING 1"=30'ZRM 35 MPH 9-15-2020 22000 DURHAM COUNTY IN DURHAM LOCATION CROSSING PROPOSED NONE NONE COMPANY TRACK NORTH CAROLINA RAILROAD HOPSON ROAD AND ADT (2040) DEVELOPER PROJECT TDW 1" = 30' NC DEPT. OF TRANSPORTATION D.B. 7072, PG. 284 PIN NO. 0747-03-23-7335 11.95 AC. 4700 HOPSON ROAD 960255V PIN NO. 0747-03-35-5362 13.63 AC. NORTH CAROLINA RAILROAD CO. 0.64 AC. 4803 HOPSON ROAD PIN NO. 0747-03-34-3599 D.B. 5444, PG. 342 RAILROAD CO. NORTH CAROLINA 0.42 AC. 4801 HOPSON ROAD PIN NO. 0747-03-34-2391 D.B. 5444, PG. 342 NORTH CAROLINA RAILROAD CO. 4805 HOPSON ROAD PIN NO. 0747-03-34-8810 D.B. 7270, PG. 31 TS CREEKSTONE LLC. DAVIS PARK EAST POD EF LLC. D.B. 8468, PG. 30 PIN NO. 0747-03-24-6764 21.07 AC. 4701 HOPSON ROAD 13.63 AC. PIN NO. 0747-03-35-5362 NORTH CAROLINA RAILROAD CO. 4.69 AC. 4804 HOPSON ROAD PIN NO. 0747-03-33-2860 D.B. 4432, PG. 331 NORTH CAROLINA RAILROAD CO. 6.92 AC. 4812 HOPSON ROAD PIN NO. 0747-03-33-6832 D.B. 7879, PG. 362 919 STORAGE HOPSON ROAD LLC 64.56 50 MPH 2 /DAY APPROVED PUBLIC WORKS DEPARTMENT CITY OF DURHAM TRANSPORTATION STORM WATER ENGINEERING DATE DATE DATE DATE DATE NORTHEAST QUADRANT NORTHWEST QUADRANT SOUTHEAST QUADRANTSOUTHWEST QUADRANT 11' 11' 11' 11' 10' PATH 2'-6" C&G 1'-6" C&G 2'-6" C&G 1'-6" C&G 11' 11' 11' 11' 13' 10' PATH 2'-6" C&G 1'-6" C&G 1'-6" C&G 2'-6" C&G HOPSON ROAD NORTH CAROLINA RAILROAD COMPANY RAILROAD TRACK16.5'