STATE OF NORTH CAROLINA
63-19
Department of Environment and Natural Resources
and ev, !@4e,
Coastal Resources Commission 'PtrMit SUN 1
for ?010
X Major Development in an Area of Environmental Cora
pursuant to NCGS 113A-118 %
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Intersal Inc., PO Box 61977, Palm Bay, Fl. 32906
Authorizing development in Carteret County at near Beaufort Inlet offshore of Fort Macon
State Park , as requested in the permittee's application dated 1/18/2010 including the
attached workplan drawings (5) 2 dated 1/18/10 and 3 dated received in Morehead City on 1/22/10.
This permit, issued on June 9 2010 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
he snhiect to fines. imorisonment or civil action; or may cause the permit to be null and void.
Excavation
1) Unless specifically altered herein, the proposed development shall be carried out in accordance with the
attached permit application and descriptive narrative. Any changes in the project plans may require a
modification of this permit. The permittee shall contact a representative of the Division of Coastal
Management at (252) 808-2808 prior to the commencement of any such activity for this determination.
2) No area outside the 100'x100' search grid shall be excavated without permit modification.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work shall cease when the permit expires on
Signed by the authority of the Secretary of DENR and the
Chairman of the Coastal Resources Commission.
James H. regson, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
July 24, 2014
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signature of Permittee
intersal Inc. Permit # 63-10
Page 2 of 3
ADDITIONAL CONDITIONS
3) The amour_t of `excavation is limited to only that which is absolutely necessary to investigate anomalies
or uncover any portions of a shipwreck or shipwreck artifacts that are discovered.
NOTE: The permittee's contractor is advised to contact the U.S. Coast Guard at (910) 815-4895, ext. 108
to discuss operations and appropriate lighting, markers, etc. for all equipment.
4) The datum anchor shall be removed when each area has been eliminated as a candidate for the recovery.
5) Prior to construction the permittee shall provide confirmation to the Corps of Engineers that the
northwestern corner of the 100-foot by 100-foot excavation area is located at Latitude 34.41.00,
Longitude 76.42.00.
6) Within 30 days of completion of excavation and salvage activities at the 12 excavation sites, the
applicant shall conduct bathymetric or diver surveys to ensure that each pit has restored to its original
elevation. Three copies of these surveys shall be provided to the Corps of Engineers, Regulatory
Branch, Mr. Dave Timpy within 45 days of completion of all excavation and salvage activities.
General
7) The permittee shall adhere to all archaeological standards and conditions as stipulated in the Department
of Cultural Resources' (DCR) permit 09BU1584. All work shall cease if DCR permit 09BU1584
expires or is terminated. Any violation of the permit approved by the DCR shall be considered a
violation of this CAMA permit.
8) The permittee understands and agrees that, if future operations by the United States requires the
alteration of work authorized by this permit, or if in the opinion of the Secretary of the Army or his
authorized representative, said work shall cause unreasonable obstruction to free navigation of the
navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to
relocate or alter the work or obstructions caused thereby, without expense to the United States or the
state of North Carolina. No claim shall be made against the United States or the state of North Carolina
on account of any such removal or alteration.
9) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage that may be caused from existing or future
operations undertaken by the United States in the public interest.
10) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work. Use of the permitted activity shall not interfere with the
public's right to free navigation on all navigable waters of the United States.
11) This permit does not grant any property rights or exclusive privileges.
?
x
Intersal Inc Permit # 63-I0
.
Page 3 of 3
A ,L
ADDITIONAL CONDITIONS
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water
Quality Certification No. 3642 (DWQ Project No. 03 0994 V2), which was issued on 3/29/10.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No.
201000295.