HomeMy WebLinkAbout20150998 Ver 8_Modification Request_20201112Staff Review
Does this application have all the attachments needed to accept it into the review process?*
r Yes r No
ID#*
20150998
Version* 8
Is this project a public transportation project?* r Yes
r No
Reviewer List:* Paul Wojoski:EADS\pawojoski
Select Reviewing Office:* Central Office - (919) 707-9000
Does this project require a request for payment to be sent?*
r
Yes
r
No
How much is r $240.00
owed? * r $570.00
Project Submittal Form
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: * r
For the Record Only (Courtesy Copy)
r
New Project
r
Modification/New Project with Existing ID
r
More Information Response
r
Other Agency Comments
r
Pre -Application Submittal
r
Re-Issuance\Renewal Request
r
Stream or Buffer Appeal
Pre -Filing Meeting Information
Pre -Filing meeting request information is not needed for this project.
Project Contact Information
Name: Richard Harmon
Who is subnitting the inforrration?
Email Address: richard.harmon@woodplc.com
Project Information
Existing ID #: Existing Version:
20150998 8
20170001(no dashes) 1
Project Name: Sutton Lake Dam Rearmament and Vegetation Removal Project Section 404
Individual Permit — Permit Modification Request
Is this a public transportation project?
r Yes
r No
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r: No r Unknown
County (ies)
New Hanover
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
NCDEQ-DWR Sutton IP Mod Ltr w Figs-
2.09MB
11.12.2020.pdf
Only pdf or krm files are accepted.
Describe the attachments
or comments:
Permit modification request for Sutton Lake Dam Rearmament and Vegetation Removal Project
Section 404 Individual Permit — Permit Modification Request
USACE Action ID SAW-2011-00858
NCDEQ-DWR WQC004207
L. V. Sutton Energy Complex
New Hanover County, North Carolina
Sign and Submit
V By checking the box and signing box below, I certify that:
■ I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to
the best of my knowledge and belief.
■ I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
■ I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
■ I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act');
■ 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
■ I intend to electronically sign and submit the online form.
Signature:
trl/,rs��fLt'� `�r'rr��srrAvi
Submittal Date: Is filled in automatically.
ID#* 20150998
Version* 8
Regional Office * Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 10/12/2020
Contact Name* Richard Harmon
Contact Email Address* richard.harmon@woodplc.com
Project Name* Sutton Lake Dam Rearmament and Vegetation Removal Project
Project Owner* Duke Energy
Project County* New Hanover
Owner Address: Street Address
410 S. Wilmington Street
Address Line 2
aty
State / Province / Pegion
Raleigh
North Carolina
Postal / Zip axle
Country
27601
USA
Is this a transportation project?* r Yes (' No
Type(s) of approval sought from the DWR:
* 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
* Individual Permit W Modification
F Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes C No
Please list all existing project ID's associated with this projects.*
DWR 15-0998 v6: WQC004207
Do you know the name of the staff member you would like to request a meeting with?
Sue Homewood
Please give a brief project description below.*
On behalf of Duke Energy, Wood Environment & Infrastructure Solutions,
Inc. (Wood) previously submitted a Joint Individual Permit (IP) Application
for the L.V. Sutton Energy Complex - Sutton Lake Dam Rearmament and
Vegetation Removal Project located at the L.V. Sutton Energy Complex in
New Hanover County, North Carolina. The U.S. Army Corps of Engineers
(USACE) issued Action ID SAW-2011-00858 for authorization of fill impacts
to jurisdictional waters on March 30, 2019 and the NC Department of
Environmental Quality, Division of Water Resources (NCDEQ-DWR) issues
an Individual 401 Water Quality Certification WQC004207 on March 20,
2020. A request is made herein for a modification of the issued USACE IP
and NCDEQ-DWR WgC004207. The modification request includes
background information, the rationale (updated purpose and need) for the
proposed action, updated Plan Viewdrawings, updated tabular data on
newwetland impacts, and compensatory mitigation.
The proposed modification to the issued USACE IP (SAW-2011-00858) and
NCDEW-DWR Certification (WQC004207) is necessary to address the
following item of concern. This item of concern must be resolved for
completion (closure) of the Sutton Lake Dam Rearmament and Vegetation
Removal Project and to assure that the authorized activities onsite for the
project are in compliance with USACE regulatory requirements. The item of
concern entails the additional placement of stone (rip -rap) within the 15-
foot zone (repair area) from the toe of the dam. The stone was placed
beyond (waterward of) the six-foot zone and was a field action that
occurred during the initial construction effort to armor the cleared zone with
geotextile fabric and rip -rap. Furthermore, the field change was based on
engineering judgement, or necessity, that additional armament would be
required in specific observed locations. This action resulted in an additional
impact of 0.493 acre to Wetland E. Furthermore, this action was completed
as based on the need to clear tree and shrub vegetation from areas of
armament within the 15-foot zone from the toe of the dam.
Please give a couple of dates you are available for a meeting.
11 /12/2020
Please attach the documentation you would like to have the meeting about.
USACE Sutton IP Mod Ltr RGH(3)- 10.12.2020
105.97KB
(004).pdf
Figures A-L.pdf 2MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/12/2020
wood.
October 17, 2020
Ms. Sue Homewood
Division of Water Resources, Winston Salem Regional Office
Department of Environmental Quality
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Subject: Sutton Lake Dam Rearmament and Vegetation Removal Project
Section 404 Individual Permit — Permit Modification Request
USACE Action ID SAW-2011-00858
NCDEQ-DWR WQC004207
L. V. Sutton Energy Complex
New Hanover County, North Carolina
Ms. Homewood,
On behalf of Duke Energy, Wood Environment & Infrastructure Solutions, Inc. (Wood) previously
submitted a Joint Individual Permit (IP) Application for the L.V. Sutton Energy Complex - Sutton
Lake Dam Rearmament and Vegetation Removal Project located at the L.V. Sutton Energy
Complex in New Hanover County, North Carolina. The U.S. Army Corps of Engineers (USACE)
issued Action ID SAW-2011-00858 for authorization of fill impacts to jurisdictional waters on
March 30, 2019 and the NC Department of Environmental Quality, Division of Water Resources
(NCDEQ-DWR) issues an Individual 401 Water Quality Certification WQC004207 on March 20,
2020. A request is made herein for a modification of the issued USACE IP and NCDEQ-DWR
WQC004207. The modification request includes background information, the rationale (updated
purpose and need) for the proposed action, updated Plan View drawings, updated tabular data
on new wetland impacts, and compensatory mitigation.
Background Information
The L.V. Sutton Energy Complex (plant) was a 575-megawatt coal-fired plant and three oil -
fueled combustion turbine power generators. The coal-fired plant was retired in November
2013, with demolition of the coal plant and older combustion turbines completed in 2017. The
L.V. Sutton Energy Complex is now a 625-megawatt natural gas combined -cycle plant, which
began operation in 2013. The Cape Fear River abuts the western edges of the plant property.
Wood Environment & Infrastructure Solutions, Inc.
4021 Stirrup Creek Drive, Suite 100
Durham, North Carolina 27703
Tel (704) 357-8600
Fax (704) 357-8638
www.woodplc.com . 0
USACE and NCDEQ-DWR Individual Permit Modification L.V. Sutton Energy Complex
November 12, 2020 Dam Rearmament and Vegetation Removal Project
Page 2
On the morning of September 14, 2018, Hurricane Florence made landfall in southeastern North
Carolina. Three breaches occurred in the Sutton Lake Dam due to the hurricane. The breaches
were repaired, but the effects of the hurricane necessitated that Duke Energy increase the
structural integrity of the Sutton Lake Dam. Duke Energy desired to complete the rearmament of
the Sutton Lake Dam before subsequent hurricane(s) strike Wilmington.
Since its construction in 1972, trees and shrubbery have grown unchecked around the base of
the dam. To restore the integrity of the Sutton Lake Dam, Duke Energy proposed to remove
vegetation off the slope of the dam and a 15-foot zone from the toe of the dam. Under the
issued USACE IP, trees within the 15-foot zone were cut at the base of the tree and the root ball
left intact to minimize potential wetland impacts. The first six -feet of the 15-foot zone
(waterward from the dam toe) was permanently armored (repair area). Maintaining this six-foot
clearing would facilitate regular dam safety inspections. The remainder of the 15-foot clearing
(i.e., nine -foot working area) was temporarily impacted during construction and allowed to
return to its native state after the completion of the project.
The permitted project purpose was to clear volunteer vegetation from the dam slope and 15-
foot zone. The project purpose was based on the following needs:
• To facilitate regular dam safety inspections;
• Improve structural integrity of the Sutton Lake Dam by armoring the dam with geotextile
fabric and rip -rap to withstand future hurricane events; and
• To ensure the health and safety of citizens living downstream of the L.V. Sutton Energy
Complex.
The USACE IP application submittal package included information on alternatives analysis and a
comparison of design plans for rearmament of the Sutton Lake Dam. All action alternatives
included rip -rap and geotextile placed along the entire (3.6 miles) interior slope (cooling lake
side) of the dam for rearmament. The three plans were based on the materials used to solidify
the crest and exterior slope of the dam above the elevation of eight -feet. The three design plans
(rip -rap with geoextile, fabriform, and hydroturf) entailed the placement of rip -rap and
geotextile within the six-foot offset from the toe of the dam. The rip -rap with geotextile method
was determined to be the preferred alternative for the method of rearmament.
The singular wetland area within the project area was Wetland E, a riverine swamp forest.
Wetland E was conterminous with the 15-foot zone from the toe of the dam, which, as
permitted, would be permanently affected by dam rearmament and temporarily impacted by
vegetation removal. The total permanent and temporary wetland impacts from the Sutton Lake
Dam Rearmament and Vegetation Removal Project was calculated to be 6.38 acres. A total of
2.93 acres were to be permanently impacted, while a total of 3.45 acres were to be temporarily
impacted. The open water repair area to Sutton Lake (including the Intake Canals) was to
encompass 3.20 acres.
USACE and NCDEQ-DWR Individual Permit Modification L.V. Sutton Energy Complex
November 12, 2020 Dam Rearmament and Vegetation Removal Project
Page 3
Compensatory mitigation for the permitted impacts for the Sutton Lake Dam Rearmament and
Vegetation Removal Project was satisfied through the purchase of riparian wetland mitigation
credits from the Lower Cape Fear Umbrella Mitigation Bank (Cape Fear River basin; Hydrologic
Unit 03030005). The mitigation requirement was 2.51 acres of riparian wetlands. In -lieu fee, on -
site mitigation, and off -site mitigation opportunities were not explored because the mitigation
bank option was already available.
Proposed Modification to USACE IP
The proposed modification to the issued USACE IP (SAW-2011-00858) and NCDEW-DWR
Certification (WQC004207) is necessary to address the following item of concern. This item of
concern must be resolved for completion (closure) of the Sutton Lake Dam Rearmament and
Vegetation Removal Project and to assure that the authorized activities onsite for the project are
in compliance with USACE regulatory requirements. The item of concern entails the additional
placement of stone (rip -rap) within the 15-foot zone (repair area) from the toe of the dam. The
stone was placed beyond (waterward of) the six-foot zone and was a field action that occurred
during the initial construction effort to armor the cleared zone with geotextile fabric and rip -rap.
Furthermore, the field change was based on engineering judgement, or necessity, that
additional armament would be required in specific observed locations. This action resulted in an
additional impact of 0.493 acre to Wetland E. Furthermore, this action was completed as based
on the need to clear tree and shrub vegetation from areas of armament within the 15-foot zone
from the toe of the dam.
The table below presents the impacts to jurisdictional wetlands (Wetland E) and open waters
(Sutton Lake and Intake Canal/Bay) as originally permitted by the USACE and as quantified from
the inadvertent placement of stone within the repair area, under the post -permit action.
Wetland Impacts
Permitted
Post -permit
Resource Type
Permanent
Temporary
Permanent
Temporary
NCWAM
Overall
(acres)
(acres)
(acres)
(acres)
Rating
Wetland E
(Bays 1, 2, 3, and 4)
2.51
2.56
0.418
0
High
Wetland E
(Bays 5 and 6)
--
0.075
0
Medium/Low
Wetland E (Breach
1/Area of Slope
0.05
0.21
0
0
Medium
Movement)
Wetland E
(Breach 3/Ditch in
0.37
0.68
0
0
Low
Wetland)
USACE and NCDEQ-DWR Individual Permit Modification L.V. Sutton Energy Complex
November 12, 2020 Dam Rearmament and Vegetation Removal Project
Page 4
Total
2.93
3.45
0.493
0
Project Total
6.38
0.493
Resource Type
Open Water Impacts
Permitted Permanent Repair
(acres)
Post -permit Permanent Repair
(acres)
Sutton Lake and Intake
Canal/Intake Bay
3.20
0
The additional wetland impacts under the post -permit action are also presented on the attached
Plan View drawings of the impact areas.
The purpose of the post -permit activities as identified under this IP modification request was to
clear volunteer vegetation from the dam slope within additional (expanded) areas of armament
within the 15-foot zone from the toe of the dam, but beyond the first six feet. This purpose was
based on the following needs:
• To provide additional armament, or protection, waterward of the toe of the dam (area of
rip -rap; and
• To assure that the area of additional armament would be free of shrubby vegetation (i.e.,
which entailed the removal of shrubby vegetation) and the structural integrity of the
work area be uncompromised.
The needs of the project as originally completed are also applicable to the current action and
include:
• To facilitate regular dam safety inspections;
• Improve structural integrity of the Sutton Lake Dam by armoring the dam with geotextile
fabric and rip -rap to withstand future hurricane events; and
• To ensure the health and safety of citizens living downstream of the L.V. Sutton Energy
Complex.
Mitigation for the originally permitted 2.51-acre impact to Wetland E was provided through the
purchase of riparian wetland mitigation credits from the Lower Cape Fear Umbrella Mitigation
Bank. A 2:1 mitigation ratio was established. The North Carolina Division of Water Resources
received the acceptance letter from the Lower Cape Fear Umbrella Mitigation Bank (dated
March 4, 2020) to meet this mitigation requirement.
Mitigation for the additional impact of 0.493 acre to Wetland E will also be obtained through the
Cape Fear Umbrella Mitigation Bank. A mitigation ratio of 2:1 is proposed for 0.418 acre of
riparian wetland impact area within Bays 1, 2, 3, and 4 with a North Carolina Wetland
Assessment Method (NCWAM) overall rating of high for the functionality of those wetland
USACE and NCDEQ-DWR Individual Permit Modification L.V. Sutton Energy Complex
November 12, 2020 Dam Rearmament and Vegetation Removal Project
Page 5
impacts areas. A mitigation ratio of 1:1 is proposed for 0.075 acre of riparian wetland impact
area within Bays 5 and 6 with a NCWAM overall rating of low or medium for the functionality of
those wetland impacts areas. As rounded to the one -hundredth place, the additional mitigation
that will be purchased from the Lower Cape Fear Umbrella Mitigation Bank will include the sum
of 0.84 credit and 0.08 credit, or a total of 0.92 credit. All of the wetland impact areas are
depicted on the attached updated Plan View drawings. The table below presents the proposed
compensatory mitigation amounts for the additional impacts to jurisdictional wetlands (Wetland
E) under the aforementioned post -permit action.
River and Sub -Basin
Impact Type
Compensatory Mitigation Required
Number
Riparian Wetlands
0.84 acre
Cape Fear River Basin
Wetland E — Bays 1, 2, 3, and 4
(0.418 acre at 2:1 mitigation ratio)
03030005
Riparian Wetlands
0.08 acre
Cape Fear River Basin
Wetland E — Bays 5 and 6
(0.075 acre at 1:1 mitigation ratio)
03030005
With regard to other resource consideration, the aforementioned post -permit activities that
were conducted onsite had no known effect on federally protected plant or animal species and
no effect on cultural resources or historic properties. These activities had no effect on
environmental justice for the surrounding residential communities; did not impact noise -
sensitive land uses; and did not impact air quality locally or regionally. Furthermore, impacts to
local or regional land use, aesthetics and visual resources, geologic features, biotic communities,
aquatic communities, and traffic and transportation were insubstantial.
Please do not hesitate to contact me if you have any questions at (919)-381-1366 or
Richard.harmon@woodplc.com.
Sincerely,
Wood Environment & Infrastructure Solutions, Inc.
i
Dicky Harmon, PWS
Senior Associate Scientist
enclosures
Figures A — L Plan Views and Cross -sections
CC: Steve Cahoon, Duke Energy
Elizabeth Glenn, Duke Energy
Robb Maris, NCDEQ-DWR
Christopher Keenan, PE
Senior Associate Engineer
--=—=—
eltls@Pr
e 0 0.5 1
Miles
Permit Figure A
Bay 1 Plan View
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
- • • — Waterline
® Wetland Impact (Permanent)
Wetland Impact (Temporary)
Slope Repair Area
CWetlands
Temporary Impact Working
Area
Permanent Impact Repair
Area
I Additional Permanent
Wetland Impacts
Repair Area
DUKE
ENERGY
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
O
1 in=50ft
Bay 1 XS Wetland E
0
© OpenStreetMap (and) contributors, CC -BY -SA
Permit Figure B
Bay 1 Cross Section
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
® Weland Impact (Permanent)
VZWeiland I mpact (Temporary)
Slope Repair Area
Temporary Impact Working
Area
Permanent Impact Repair
Area
Repair Area
_Additional Permanent
Wetland Impacts
DUKE
ENERGY,
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
1 XS Wetland
E
—South
20'
18'
16'
0
Bay
Repair Area
Sutton Lake
Slope Repair
LOD (N
— — — — ---
North
Additional
Wetland E (N Extent)
Wetland Fill Impact
Wetland Impacts
Vegetation Re oval
Temporary Impact
LOD (S-Extent)
40 60
-
Water Edge
Area
Extent)
---------
14'
12'
10'
8'
�`
6'
4'
2'
0'
�
20
80
100
Feet
120
140
160
180
200
--=-=-
eltls@Pr
e 0 0.5 1 3�
Miles
Permit Figure C
Bay 2 Plan View
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
-•—• xS
- • • — Waterline
® Wetland Impact (Permanent)
Wetland Impact (Temporary)
Slope Repair Area
CWetlands
Temporary Impact Working
Area
Permanent Impact Repair
Area
I Additional Permanent
Wetland Impacts
Repair Area
DUKE
ENERGY,,
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
O
1 in=50ft
2 XS Wetland E
�O OpenStreetMap (and) contributors, CC -BY -SA
Permit Figure D
Bay 2 Cross Section
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
® Wetland Impact (Permanent)
® I.Vetland I mpact (Temporary)
Slope Repair Area
0 Temporary Impact Working
Area
Permanent Impact Repair
Area
Repair Area
_Addtional Permanent
Weiland Impacts
�( DUKE
t, ENERGY...
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
2 XS Wetland
E
Southwest
Bay
Repair Area
Northeast
20'
Sutton
Lake Water Edge
18'
Slope Repair Area
16'
Wetland E (NE Extent)
Wetland Fill Impact
Additional Wetland Impacts
Vegetation Removal
Temporary Impact
LOD (SW Extent)
`
LOD (NE Extent)
14'
12'
10,
8'
/
/
6'
.40
4'
i
2'-
0'
0
20
40
60
80
100
120
140
160
180
200
Feet
3wsi+r►p��_�
e 0 0.5 1
NOMMOSEENim Miles
Permit Figure E
Bay 3 Plan View
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
-•—•1 xS
— • • — Waterline
® Wetland Impact (Permanent)
Wetland Impact (Temporary)
Slope Repair Area
Wetlands
Temporary Impact Working
Area
Permanent Impact Repair
Area
I Additional Permanent
Wetland Impacts
Repair Area
DUKE
ENERGY.
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
•
0
1 in=50ft
i
I
i I
i I
I
I
I
I
I
I
I
I
I
I
I
I
_.—•—•—• .—•—•—•—•T•—.—•—•—•—•—
II
\\\Bay 3 XS Wetland E
I
I
I
I
I
I
I
I
I
I
I
© OpenStreetMap (and) contributors, CC -BY -SA
Permit Figure F
Bay 3 Cross Section
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
® Wetland Impact (Permanent)
® I.Vetland I mpact (Temporary)
Slope Repair Area
0 Temporary Impact Working
Area
Permanent Impact Repair
Area
Repair Area
_Addtional Permanent
Weiland Impacts
�( DUKE
t, ENERGY...
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
Bay
3 XS Wetland
E
Repair
Area
—West
Sutton Lake Waterdge E
East
20'
18'
-
Slope Repair Area
16'
Wetland
E (SE Extent)
as
IOD (E Extent)
-- —
14'
12
10,
$,
Wetland Fill Impact
Additional Wetland Impacts
—Vegetation Removal
Temporary Impact
LOD (W Extent)
0#1
6'
4'
21
0'
0
20
40
60
80
100
Feet
120
140
160
180
200
8�"
--__ —= U5421
100
0 0.5 1�
Miles
Permit Figure G
Bay 4 Plan View
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
-•—•1 xS
— • • — Waterline
® Wetland Impact (Permanent)
Wetland Impact (Temporary)
Slope Repair Area
CWetlands
Temporary Impact Working
Area
Permanent Impact Repair
Area
I Additional Permanent
Wetland Impacts
Repair Area
DUKE
ENERGY
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
•
•
r
O • W
1 in=50ft
100
M Feet
I
I
I
I
I
I
I
I
I
I
I
I
I Bay 4 XS Wetland E
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
© OpenStreetMap (and) contributors, CC -BY -SA
Permit Figure H
Bay 4 Cross Section
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
® Wetland Impact (Permanent)
® I.Vetland I mpact (Temporary)
Slope Repair Area
0 Temporary Impact Working
Area
Permanent Impact Repair
Area
Repair Area
_Addtional Permanent
Weiland Impacts
�( DUKE
t, ENERGY...
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
4 XS Wetland
Bay
E
Repair Area
W2St
20'
Sutton Lake Water Edge East
slope Repair Area
Wetland E (E Extent)
18'
16'
14'
Wetland Fill Impact
Additional Wetland Impact
Vegetation Removal
Temporary Impact
LOD (E Extent)
12'
10,
LOD (W Extent)
_1000
.00
---
----
----
81
i
i
i
6'
4'
----
.00
2'
0'
0
20
40
60
80
100
120
140
160
180
200
Feet
3wgrnp��_��
e 0 0.5 1
NOMMOSEENim Miles
Permit Figure I
Bay 5 Plan View
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
-•—•1 xS
— • • — Waterline
® Wetland Impact (Permanent)
Wetland Impact (Temporary)
Slope Repair Area
Wetlands
Temporary Impact Working
Area
Permanent Impact Repair
Area
I Additional Permanent
Wetland Impacts
Repair Area
DUKE
ENERGY.
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
1 in=50ft
Bay 5 XS Wetland E
O OpenStreetMap (and) contributors, CC -BY -SA
Permit Figure J
Bay 5 Cross Section
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
® Wetland Impact (Permanent)
® vVetland I mpact (Temporary)
Slope Repair Area
0 Temporary Impact Working
Area
Permanent Impact Repair
Area
Repair Area
_Addtional Permanent
Weiland Impacts
�( DUKE
t, ENERGY...
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
5 XS Wetland
E
Bay
-Northwest
Repair Area Southeast
20'
Sutton Lake Water Edge
18'
Wetland_E_(SE
Extent)
I
Slope Repair Area
16'
Wetland Fill Impact
1
14'
12'
10,
8'
Additional Wetland Impact
-1000
— —
i 0#0
001
00
�
LOD (SE Extent)
— — — — — — — — ----
Vegetation Removal
Temporary Impact
LOD (NW Extent)
-
6'
4'
----
2'
0'
0
20
40
60
80
100
120
140
160
180
200
Feet
Permit Figure K
Bay 6 Plan View
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
-•—• xS
— • • — Waterline
® Wetland Impact (Permanent)
Wetland Impact (Temporary)
Slope Repair Area
CWetlands
Temporary Impact Working
Area
Permanent Impact Repair
Area
I Additional Permanent
Wetland Impacts
Repair Area
DUKE
ENERGY,,
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/7/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
O /.'/'�
1 in=50ft
.000
/ Bay 6 XS Wetland E
/'
/
/
/
/
/
/
/
O OpenStreetMap (and) contributors, CC -BY -SA
Permit Figure L
Bay 6 Cross Section
L.V. Sutton Energy Complex
Sutton Lake Dam Rearmament
and Vegetation Removal Project
New Hanover County, NC
Legend
® Wetland Impact (Permanent)
® I.Vetland I mpact (Temporary)
Slope Repair Area
0 Temporary Impact Working
Area
Permanent Impact Repair
Area
Repair Area
_Addtional Permanent
Weiland Impacts
�( DUKE
t, ENERGY...
wood.
Job No. 7812200489
Drawn Bv: LAW
Reviewed Bv:
Date: 10/9/2020
The map shown here has been
created with all due and
reasonable care and is strictly for
use with Wood project number
7812200489. Wood assumes no
liability, direct or indirect,
whatsoever for any such third
party or unintended use.
Total Permanent Wetland E Impact
3.42 ac
Total Temporary Wetland E Impact
3.45 ac
Total Slope Repair Area
3.2 ac
,6 XS Wetland
E
Bay
Northwest
Repair Area
Southeast
20'
Permanent Impact Repair Area
Sutton Lake Water Edge
18'
16'
14'
12'
10,
8'
Vegetation Removal
Temporary Impact
LO_D_(NW Extent)\ \ \
Wetland E (SE Extent)
Slope Repair Area
LOD (SE
Extent)
11
6'
4'
----
2'
0'
0
20
40
60
80
100
120
140
160
180
200
Feet