Loading...
HomeMy WebLinkAbout20090766 Ver 2_Approval Letter_20100614AL ? ET NDIR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 14, 2010 Pastor Jerry M. Williams Agape Word Fellowship, Inc. 9100 Rhinebeck Ct. Raleigh, NC 27613 Project Name: Agape Fellowship Church UT Walnut Creek [030402, 27-24-(4), C, NSW] Wake County DWQ EXP#: 09-0766v2 AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate with Additional Conditions Dear Pastor Williams: You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to impact approximately 1,695 square feet of Zone 1 Neuse River basin protected riparian buffer and 1,622 square feet of Zone 2 Neuse River basin protected riparian buffer to construct the church project and proposed aerial sanitary sewer crossing at the site as described within your application dated June 11, 2010 and received by the Division of Water Quality on June 14, 2010. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization certificate is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Authorization are met. No other impacts are approved including incidental impacts: Type of Impact Amount Approved (Units) Plan Location or Reference Zone 1 Buffers (permanent 1,695 s ware ft. June 11, 2010 PCN Buffer Impact Table Zone 2 Buffers (permanent) 1,622 (square ft. June 11, 2010 PCN Buffer Impact Table 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Ste 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http://portal.ncdenr.org/web/wq/swp/ws/401 NofthCarolina Naturally An Equal Opportunity 1 Affirmative Action Employer Agape Word Fellowship, Inc. Page 2 of 4 June 14, 2010 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. 3. Buffer Mitigation (Lane Island Mitigation Bank) You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for 128 square feet of parallel impacts to Zone 1 of the riparian buffer is 384 square feet as required by 15A NCAC 2B .0233. We understand you wish to make a payment into the Lane Island Riparian Buffer Mitigation Bank administered by Restoration Systems, LLC to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. This contribution will satisfy our compensatory mitigation requirements in accordance with 15A NCAC 2B .0233(9)(C). Until Restoration Systems, LLC receives and clears your check, no impacts specified in this buffer authorization shall occur. Restoration Systems should be contacted at (919) 334-9118 if you have any questions concerning payment. For accounting purposes, this buffer authorization authorizes payment into the Lane Island Riparian Buffer Mitigation Bank to compensate for 384 fe of required riparian buffer mitigation for impacts to 128 ft' of protected riparian buffers; 03020201, 03-04-02, 27- 34-(4) HUC, river and subbasin. 4. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practise, shall he performed so that no violations of state wpff-r gimlity standards, statutes, or rules occur. 5. No Sediment & Erosion Control Measures within Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 6. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0233(5). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen. This may require additional approval from this Office. Agape Word Fellowship, Inc. Page 3 of 4 June 14, 2010 7. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities to ensure compliance with 15A NCAC 2B .0233. 8. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 9. Notification of Construction The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. Violations of any condition herein set forth may result in revocation of this Authorization and may result in criminal and/or civil penalties. The authorization to proceed with your proposed shall expire five (5) years from the date of this letter. If you wish to contest any statement in the attached Authorization you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698, Facsimile: (919)-733-3478 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 Unless such demands are made, this Certification shall be final and binding. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. If you have any questions, please telephone Lia Myott Gilleski at 919-733-1786. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. Agape Word Fellowship, Inc. Page 4 of 4 June 14, 2010 CHSIUm/1mg Enclosures: Certificate of Completion Sincerely, oleen H. Sullins cc: Lauren Witherspoon, DWQ Raleigh Regional Office File Copy DLR Raleigh Regional Office Debbie Edwards, S&EC, PA, 11010 Raven Ridge Rd, Raleigh, NC 27614 Filename: 090766v2AgapeFellowshipChurch(W ake)NBRAuth.doc