Loading...
HomeMy WebLinkAbout20201407 Ver 1_Shoreline Stabilization_20201113Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: DWR Pre -Filing Meeting Request Form.pdf 52.05KB Pre -fling Meeting or Request Date 10/6/2020 ID# 20201407 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * meadorwood@frontier.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name: * William Meador Email: * meadorwood@frontier. com Phone Number:* (304)890-3133 (xxx)xxx-xxxx Mailing Address:* Street Address P.O. Box 31 Address Line 2 City State / Frovince / Region Flat Top WV Fbstal / Zip Code Country 25841 United States Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] ..................................................................................................................................................................................... Project Name:* William Meador - Rip Rap installation If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Street Address 2152 Clyde Road Address Line 2 Oty Catawba Rbstal / Zip Code 28609 Latitude:* 89.993889 State / Province / Region NC Country US Longitude:* 35.696667 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Shoreline Stabahzation Sketch.pdf 103KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%2OLayout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* picture l.jpg 675.49KB picture 2.jpg 675.49KB 4. Location of the property (where work is to be conducted) Nearest Town:* Catawba County: * Catawba Lake/ river/ ocean adjacent to Lake Norman property: Subdivisions name or site address:* 2152 Clyde Road, Catawba, NC 28609 Include phasellot nunter Directions to site:* From Hudson Chapel Road and Clyde Road intersection it is approximately 1 mile. The fourth lot on the right (waterfront side). The house and lot in the diagram are at 2142 Clyde Road. The vacant lot is 2152 Clyde Road. Rease include road naves and nunbers, landnarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* 2142 Residential lot. 2152 Vacant lot. Residential, undeveloped, etc. 6. Property Size .5 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Installation of stone to prevent further erosion of bank/shoreline. 8. How will the work be done?* I7 From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 300 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 600 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) No vegetation will be disturbed. The existing trees will remain. Any damage to current grass will be reseeded once the project is complete. Sketch: Shoreline Stabalization Sketch.pdf 103KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Will=Meador Signature: "At Initial Review Is this accepted into the review process?* Project Number:* 20201407 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 Water at Normal Level Proposed Installation = Existing Structures House • � eV 4 t r 0.. � r N� b4 AMMomw rr • � eV 4 t r 0.. � r N� b4 AMMomw rr Water at Normal Level Proposed Installation = Existing Structures House ID#* 20201407 Version* 1 Regional Office * Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/6/2020 Contact Name* Contact Email Address* Project Name* Project Owner* Project County* Owner Address: William Meador meadorvvood@frontier.com Meador Project William Meador Catawba Street Address 2142 Clyde Road Address Line 2 aty Catawba Postal / Zip axle 28609 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification W Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No State / Province / Pegion NC Country United States Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* Apply rip rap stone to e)asting shore line stone at 2142 Clyde Road. Apply rip rap stone to shoreline at 2152 Clyde Road to prevent erosion. Please give a couple of dates you are available for a meeting. 10/8/2020 10/9/2020 10/14/2020 10/15/2020 10/16/2020 Please attach the documentation you would like to have the meeting about. Shoreline Stabalization Sketch.pdf 103KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/6/2020