Loading...
HomeMy WebLinkAbout20021410 Ver 4_Stormwater Approval_20100610AMA lmn 0FHR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 10, 2010 Mr. Derrel Poole City of Charlotte - Engineering and Property Mgt 600 E. 4" St. Charlotte, NC 28202 Project Name: Dixie.River Road Roadway Project Mecklenburg County DWQ#: 2002-14100 APPROVAL OF STORMWA TER MANAGEMENT PLAN (SMP) - MODIFICATION Dear Mr. Poole, On March 2, 2010, the Division of Water Quality (DWQ) issued a 401 Water Quality Certification to the City of Charlotte to place fill within or otherwise impact 256 linear feet of perennial stream for the purpose of constructing the proposed Dixie River road realignment in Mecklenburg County. On June 9, 2010 the 401 Oversight/Express Permitting Unit of the DWQ received your application from Mr. Chris Estes of Estes Design, Inc., requesting for review and approval of a modification to the Stormwater Management Plan (SMP) associated with the proposed development. The requested modification, as shown on the plan sheets received with your application, includes: 1. Revision to Culvert 2 from 200 linear feet of 6'x5' box culvert to 205 linear feet of 72" RCP. This culvert receives flows from wet detention pond 2 and is sited on a non jurisdictional stream. Therefore, the resulting impact does not affect the total impacts permitted in the 401 Water Quality Certification; 2. Both the impervious area and total drainage area to wet detention pond 2 have increased. The DWQ has determined that these increases do not require structural modification to wet pond 2 and its associated devices. As a result, the DWQ approves the requested modification and accepts the SMP received with your application to satisfy the stormwater management requirement in the Water Quality Certification. You are required to meet the following conditions: 1. The stormwater treatment devices, consisting of two wet detention ponds, and all associated appurtenances, stormwater conveyances, and the grading and drainage patterns depicted on the revised plans received on June 9, 2010, as approved by this office must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. The stormwater management structures shall have maintenance access and at least 10-foot drainage easement on each side to allow for the ability to maintain the structures, to perform corrective actions and shall provide protection of the structures from potential alterations by future property owners. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Ste 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Intemet: http:I/h2o.enr.state.nc.usincwefands/ NonrthCarohna ?atura!!? An Equal Opportunity 1 Affirmative Action Employer City of Charlotte Dixie River Rd Alignment SMP_Mod Page 2 of 2 June 10, 2010 2. All operation and maintenance activities shall be followed as stipulated in the notarized operation and maintenance (O & M) agreements received with your application, and signed by Mr. Poole on June 2, 2010. 3. Notification of Construction: The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. This letter completes the review by the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Joseph Gyamfi, PE at 919-715-3473 or Lia M. Gilleski at 919-733-9502. Sincerely V(c Ian McMillan, Acting Supervisor 401 Oversight/Express Review Program IJM/jg cc: Steve Chapin, USACE Asheville Regulatory Field Office Alan Johnsom, DWQ MRO DLQ MRO File copy Mr. Chris Estes, Estes Design, Inc., P.O. Box 79133, Charlotte, NC 28271