HomeMy WebLinkAbout20201721 Ver 1_Catawba Notification Form_20201113Strickland, Bev
From: Matthew Motteler <mmotteler@gmail.com>
Sent: Friday, November 13, 2020 2:27 PM
To: Perez, Douglas J
Cc: Johnson, Alan
Subject: [External] Re: 7960 Lakeview Dr. (DWR # 20-1721)
Attachments: image001.png; Catawba Notification Form (1).pdf
• 1 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ort.s am nc. ov
Here is the signed document. Let me know if a need anything else.
Have a great Friday.
Matt Motteler
On Fri, Nov 13, 2020, 1:31 PM Perez, Douglas J <doug_perez o,ncdenr.gov> wrote:
Hello,
Sorry for the confusion. It looking over the Catawba Riparian Buffer Rules, walkways are allowed as long as
they stay under 6' wide and do not remove any trees within the buffer. If you could read, fill out and sign, and
return to me the Catawba Riparian Buffer form, I can continue to work on your application. I have attached the
form in two formats. If you could return to me whichever one works for you that would be most appreciated.
Again, sorry for the confusion.
Sincerely,
Doug Perez
From: Perez, Douglas J
Sent: Friday, November 13, 2020 1:02 PM
To: mmotteler(cr��,gmail.com
Cc: Johnson, Alan <alan.johnson o,ncdenr.gov>
Subject: 7960 Lakeview Dr. (DWR 9 20-1721)
Hello,
I am emailing you today about your Buffer Authorization application. I have a few concerns about this project.
First, we do not allow for concrete walkways to be installed in the buffer. They increase the amount of runoff
that would normally diffuse slowly throughout the buffer. You can install a boardwalk style walkway
comprised of decking material, however concrete is not allowed. In order for you to put in a walkway that you
are proposing, you would need to apply for a variance and show definitive hardship that is being placed upon
you. As it stands, I cannot approve this application. Without alteration to you plans, I would suggest that you
remove the application.
Sincerely,
Doug Perez
Doug Perez — Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2162 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Motteler Walkway 7960 Lakeview dr. Denver NC
Project Name/address: 28037 County: Lincoln
Owner: Matthew Motteler fll a etd I'-ioi�e(et
Print
Contractor/agent: _
Signature
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
Matthew Motteler
I, , hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials. 11 /13/2020
Signature (owner): Date: