Loading...
HomeMy WebLinkAboutNCC190622_NOT Closeout Documents_20201113North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910)433-3300 Tumberry Section Two. Part Two (Lots County: Hoke Project: 200 & 216) Person financially responsible: Caviness and Cates Building and Development. Project t Inc. - Patrick Raynor, CFO Address: 639 Executive Place, Suite 400. Fayetteville. NC 1. Project Location: Grantham Dr. & Bridgehaven Dr.. Pictures: No McLauchlin 2. Weather and soil conditions: sunny/workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: River basin: Cape Fear HOKE-2019-023 Initial inspection: No If no. check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes. where? (check all that apply) Degree of damage: S. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 23. 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: June 22, 2020 Time arriving on site: 9:00 AM Time leaving site: 9:45 AM cc: