HomeMy WebLinkAbout20201438 Ver 1_PreFiling 30-Day Clock Reached Email_20201109Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, November 9, 2020 12:01 AM
To: mmartin@rkk.com
Subject: Pre -Filing Time Clock has been reached for B-6053 Replacement of Bridge No. 34 On
Providence Road - 20201438 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for B-6053
Replacement of Bridge No. 34 On Providence Road that you submitted on 10/9/2020. The I D number for that project is
20201438, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses ore not monitored.
ID#* 20201438
Version* 1
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Garcy Ward
Pre -Filing Meeting Request submitted 10/9/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Matthew Martin
mmartin@rkk.com
B-6053 Replacement of Bridge No. 34 On Providence Road
Amanda C. Boone (City of Elizabeth City)
Pasquotank
Street Address
410 Pritchard Street
Address Line 2
aty
Elizabeth City
Rbstal / Zip Code
27909
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
Pasquotank
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
SAW-2020-00839
Do you know the name of the staff member you would like to request a meeting with?
Garcy Ward
Please give a brief project description below.*
Bridge No. 34 has a sufficiency rating of 17.6 out of 100 and is rated as
structurally deficient. The 63-year-old year -old timber structure is
approaching the end of its useful life. Bridge No. 34 will be replaced on the
existing location with a new47'-4"-long bridge. The roadway will include two
10' wide lanes and 3' wide shoulders (T shoulders where guardrail is
required).
Please give a couple of dates you are available for a meeting.
10/16/2020
10/23/2020
10/30/2020
11 /6/2020
Please attach the documentation you would like to have the meeting about.
SAW-2020-00839 Elizabeth City_B6053.pdf 258.99KB
B6053_PreJD_B6053_AR Map.pdf 920.2KB
B6053_Permit Drawings.pdf 1.89MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/9/2020