Loading...
HomeMy WebLinkAboutWQ0031583_Application_20091107USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: (to be completed by DWQ) I. Owner/Permittee: 1 a. City of Clinton Full Legal Name (company, municipality, HOA, utility, etc.) Z 1 b. John Connet, City Manager O Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials!) F- 1 c. The legal entity who will own this system is: ❑ Individual ❑ Federal ® Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): Q 1 d. 221 Lisbon Street 1 e. Clinton LL Mailing Address City Z 1f. North Carolina 1g. 28329 Z State Zip Code 0 1 h. (910) 592-1961 1 i. (910) 529-3825 1 j. jconnet@cityofclintonnc.us QTelephone Facsimile E-mail V 2. Proiect (Facility) Information: J 2a. Clinton — Russell Street Sewer Improvements 2b. Sampson IL Brief Project Name (permit will refer to this name) County Where Project is Located n' a 3. Contact Person: Chris Doherty, Public Works Director Q3a. Name and Affiliation of Someone Who Can Answer Questions About this Application 3b. (910) 299-4905 3c. cdoherty@cityofclintonnc.us Phone Number E-mail 1. Project is ❑ New ® Modification (of an existing permit) If Modification, Permit No.: W00031583 2. Owner is ® Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one ❑ Retaining Ownership (i.e. store, church, single office, etc.) or Public Utility (Instruction C) ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction D) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. City of Clinton Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 4a. Larkins Water Pollution Control Facility 4b. NCO020117 Name of WWTF WWTF Permit No. 5a. City of Clinton 5b. 8" ® Gravity 5c. WQ0031583 Owner of Downstream Sewer Receiving Sewer Size ❑ Force Main Permit # of Downstream Sewer (Instruction E) F, Thn nrinin of thic wactpwntpr i8 (check all that aDDlv): OF W ATF9 State of North Carolina Department of Environment and Natural Resources Division of Water Quality FAST -TRACK APPLICATION (FTA 12/07 ) for GRAVITY SEWERS, PUMP STATIONS, AND FORCE MAINS (Pressure & Vacuum sewer systems are not to be included as part of this application package) INSTRUCTIONS: Indicate that you have included/addressed the following list of required application package items by checking the space provided next to each applicable item. Failure to submit all required items will lead to your application being returned as incomplete. Forms are available from the web site or by calling the Regional Office serving your county: http://h2o. enr state. nc. us/peres/Col/ection % 20Systems/CollectionSystemApplications. html ® A. Application Form - Submit one original and one copy of the completed and appropriately executed application form. The application should include a project narrative describing the final build -out design (i.e. system and/or pump station to ultimately serve 500 homes, but flow for only 100 homes being requested now). For modifications, clearly explain the reason for the modification (i.e. adding another phase, changing line size/length, etc.). Only include the modified information in this permit application - do not duplicate project information that has already been included in the original permit. Any changes to this form will result in the application being returned. The Division of Water Quality (Division) will only accept application packages that have been fully completed with all applicable items addressed. You do not need to submit detailed plans and specifications unless you respond NO to Item B03). Separate applications should be made for non-contiguous sewer systems. ® B. Application Fee - Submit a check in the amount of $480 made payable to: North Carolina Department of Environment and Natural Resources (NCDENR). Checks shall be dated within 90 days of application submittal. ❑ C. Certificates of Public Convenience and Necessity — If the application is being submitted in the name of a privately -owned public utility, submit two copies of the Certificate of Public Convenience and Necessity (CPCN) which demonstrates that the public utility is authorized to hold the utility franchise for the area to be served by the sewer extension. If a CPCN has not been issued, provide two copies of a letter from the North Carolina Utilities Commission's Public Staff that states that an application for a franchise has been received, that the service area is contiguous to an existing franchised area, and/or that franchise approval is expected. The project name in the CPCN or letter must match that provided in Item A(2)a of this application. ❑ D. Operational Agreements — Submit one original and two copies of a properly executed operational agreement, as per 15A NCAC 02T .0115, if the application is submitted by a private applicant and will be serving residential or commercial lots (e.g., houses, condominiums, townhomes, outparcels, etc.) that will be sold to another entity. If the applicant is a home or property owner's association, use Form HOA 02/03. If the applicant is a developer, use Form DEV 02/03. EVEN IF THE PROJECT MAY BE TURNED OVER TO A MUNICIPALITY UPON COMPLETION, FORM DEV 02/03 IS REQUIRED. ® E. Downstream Sewer, WWTF Capacity and Flow Tracking/Acceptance — FORM FTSE 10/07 (Flow Tracking/Acceptance for Sewer Extension Permit Applications) is required with every application. The applicant (and owners of downstream sewers, pump stations and/or treatment facilities submitting FORM FTSE-10/07) certifies that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving treatment plant, and that the flow from this project will not cause capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving wastewater treatment plant. Where the applicant is not the owner of the downstream sewer, submit two copies of FORM FTSE 10/07 from the owner of the downstream sewer and owner of the WWTF, if different. The flow acceptance indicated in FORM FTSE-10/07 must not expire prior to permit issuance and must be dated less than one year prior to the application date. Submittal of this application and FORM FTSE-10/07 indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a). Intergovernmental agreements or other contracts will not be accepted in lieu of project -specific FTSE 10/07. ® F Map — Submit an 8.5-inch by 11-inch COLOR copy of a USGS Topographic Map of sufficient scale to identify the entire project area and the closest surface waters. Each map or maps must show the location of the sewer line and pump stations and be of reproducible quality. Include a street level map showing the downstream connection point, and the permit number for the downstream sewer, if known. FTA l2/07 ® G. Stream Classifications — Watershed Classification Attachment (Form WACAS-12/07) If any portion of the project boundary is within 100 feet of any surface water or wetlands, the Watershed Classification Attachment must be completed. ❑ H Environmental Assessments — If this project is subject to an Environmental Assessment (EA) [15A NCAC 01C], this application cannot be used. Send the project application on the most current version of Form PSFMGSA to the Design Management Unit, 1633 Mail Service Center, Raleigh, NC 27699-1633. Applications cannot be accepted until a Finding of No Significant Impact (FONSI) or Environmental Impact Statement (EIS) has been issued. A copy is to be submitted with that permit application. ❑ I. Flow Direction — Many wastewater treatment systems are entering into agreements for regionalization efforts and emergency treatment capacity. Parts of the system are installed so that the wastewater flow can be directed to more than one treatment facility. If this is the case with this project, please indicate in 13(12) and give the permit number of the second treatment facility. ® J. Certifications — Section C The application must be certified by both the applicant and the design engineer who is a North Carolina Registered Professional Engineer (PE). The applicant signature must match the signing official listed in Item A(1 b). The PE should NOT certify the application if he/she is unfamiliar with 15A NCAC Chapter 2T, the Gravity Sewer Minimum Design Criteria (most recent version) and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (most recent version), as applicable to the project. THE COMPLETED FTA 12107 APPLICATION PACKAGE, INCLUDING ALL SUPPORTING DOCUMENTS AND $480 FEE, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 2964500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Hamett, Hoke, Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Berne, Camden, Chowan, Craven, Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 585 Waughtown Street Alamance, Alleghany, Ashe, Caswell, Davidson, Winston-Salem, North Carolina 27107 Davie, Forsyth, Guilford, Rockingham, Randolph, (336) 771-5000 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 771-4630 Fax For more information, please visit our web site at., http.11h2o.enr.state.nc.us/peres/ or contact the Regional Office serving your county. FTA 12/07 USE THE TAB KEY TO MOVE FROM FIELD TO FIELDI Application Number: (to be completed by DWQ) 1 Owner/Permittee: la. City of Clinton Full Legal Name (company, municipality, HOA, utility, etc.) Z 1 b. John Connet City Manager for 0 Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) authorized signing officials!) Q 1 c. The legal entity who will own this system is: ❑ Individual ❑ Federal ® Municipality ❑ State/County ❑ Private Partnership ❑ Corporation ❑ Other (specify): 0 Id. 221 Lisbon Street 1 e. Clinton U. Mailing Address City Z 1f. North Carolina 1g. 28329 Z State Zip Code 0 1h. (910) 592-1961 1i. (910) 529-3825 1j. jconnet@dtyofclintonnc.us - QTelephone Facsimile E-mail V 2. Proiect (Facility) Information: _j 2a. Clinton - Russell Street Sewer Improvements 2b. Sampson aBrief Project Name (permit will refer to this name) County Where Project is Located a 3. Contact Person: 3a. Chris Doherty Public Works Director Q About this Application Name and Affiliation of Someone Who Can Answer Questions 3b. (910) 299-4905 3c. cdoherty@_cityofclintonnc.us Phone Number E-mail 1. Project is ❑ New ® Modification (of an existing permit) If Modification, Permit No.: W00031583 2. Owner is ® Public (skip to Item B(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be: 2b. If sold, facilities owned by a (must choose one ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction C) ❑ Leasing units (lots, townhomes, etc. - skip to Item B(3)) ❑ Homeowner Assoc./Developer (Instruction D) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) 3. City of Clinton Z Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project 0 4a. Larkins Water Pollution Control Facility 4b. NCO020117 QName of WWTF WWTF Permit No. 5a. City of Clinton 5b. 8" ® Gravity 5c. W00031583 Owner of Downstream Sewer ''Receiving Sewer Size ❑ Force Main Permit # of Downstream Sewer (Instruction E) 0 6. The origin of this wastewater is (check all that apply): LL. Z 100 % Domestic/Commercial ® Residential Subdivision ❑ Retail (Stores, shopping centers) ❑ Apartments/Condominiums ❑ Institution % Industrial (attach ❑ Mobile Home Park ❑ Hospital description.) WEl School ❑ Church (RO: contact your Regional Office ❑ Restaurant El Nursing Home a Pretreatment staff) ❑ Office ® Other (specify): Commercial % Other (specify): 7. Volume of wastewater to be allocated or permitted for this particular project: 0 gallons per day *Do not include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that conned to this line ® Flow has already been allocated in Permit No. W00031583 ❑ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA 12/07 0 W n Z Z U 4-0 O H a 0 Z H W a 71 9. Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item 13(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item 13(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). Additional sewer services due to sewer extension = 9 commercial businesses + 1 residence to be included within pump station allocated ADF flow of 103,650 gpd permitted in W00031583. * Volume of wastewater to be tributary to this sewer extension = 9 commercial connections * 25 employees *25 gallons per day / connection = 5,625 gpd + 1 house * 360 gallons per day / connection = 5,985 gpd 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8" Gravity Line Length (feet) New Gravity or Additional Force Main 1,875 Gravity 11. Summary of Pump Stations w/ associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS Pump Station Location ID (self chosen - as shown on plansimap for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length 2 - portable generator w/MTS Pump Station Location ID (self chosen - as shown on plans/map for reference) Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w/ATS; Force Main Size Force Main Length. 2 - portable generator w/MTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes ® No If Yes, permit number of 2" d treatment facility (RO — if "yes" to 13,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ® Yes [:]No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07 14. Have the folkwring pemtits/cartitications been submitted for approval for the system or project to be served? Wedand/Stream Crossings - General Pemat or 401Cert kation? ❑ Yes ❑ No ®NIA Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ WA Stormwater? ❑ Yes ❑ No ®N/A 15. Does this project include any high pity fines, (see 15A NCAC 02T .0402 (2)1 involve aerial lines. siphons, or interference manh)les)? These lines will be considered high priority and must be checked once every six months Check if Yes: Q and provide details 1. Owrw/Permittee's Certification: (Signature of Signing Official and Project Name) 1..100Conrtet attest that this applicadon for Ck tbnn — Ptmh Rbad Gravity sewer Extension has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all rmgt*W parts of this application are not c rrpWed and that if all required supporting documentation and attachments are not incAded, this applkabon package is subject to being returned as incomplete. Note: In accordance with North Carokna General Statutes 143- 215.64 and 143-21 SLOA any person who knowingly makes any false statement; representation. or ced dcadon in any a cation shall be guully of a Class 2 misdemeanor, which may include a 11ne not to exceed $10.000 as well as dW pWflft3 uP to 424000Wr viyfabon. Signing tutus" Signahu Oats ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS. THEIR PROXIMITY TO OTHER UTILITIES. DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 z 0 1— 2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) Q c i 1. David A H Gum attest that this application for Cbnton—Russel l StGravity Sewer Extension has been reviewed by me N. and is accurate, complete and consistent with the infon»adon fie the engineering plans, calculations: and all other suppor ft documentation to the best of my knowledge I further~ that to the best of my knowledge the proposed design has been prWared in ecmdance with the applkablo regulallium Gravity S"W Minimum Design Criteria for Gravity Sewers adopted February I Z 1996, and the mir*ntun Design Criteria for the Fast Track Permitting of Pump Stations and Fo w Mains adopted June 1, 2000 and the watershed dassiffcatiar in accaordsnce with Division guidance. • Although other pcofessionafv may have devebped certain pwflons of this submittal package. Inclusion of these materials C.i under my signature and seal signifies that I have reviewed this rrWedal and have judged it to be consistent with the proposed design► Note: In accordance with NC General Statutes 143-2116A and 143-211 QX any person who knowingly makes any false statement; representation, or ce► o'kadon in any application shall be guilty of a Class 2 misdemeanor which may kwkide a fine not to exceed S10, 000 as well as dW penaitiss up to $240W per violation. 2a. David A. McClure. P.E. Professional Engineer Name 2b. Withers & RaverW Engineering Firm 2c. 111 MwXenan Drive Mailing Address 2d. Cary 2e. NC 2f. 27511 City State Zip 2g. (919) 469-3340 2h. (919) 238-2099 _�. 21. dmcdur*&LMhersravenet.com Teisphone Facsinnie E-mail NC PE Seal. Signature & Date ETA 12107 State of North Carolina Department of Environment and. Natural Resources Division of Water Quality Flow Tracking/Acceptance for Server Extension Permit Applications (FTSE—10/07) Project Applicant Name: City of Clinton Project Name for which flow is being requested: RyM11 Street Water and Sewer Impmvemems More than oneFTSF-1 A/07 maybe be require4f+or a single project if the owner of the WWTP it not rwponslble for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: _ Larkins Water Pollution Control Facility b. WWTP Facility Permit #: NCO020117 All flows are in MGD c. WWTP facility's permitted flow Lo- d. Estimated obligated flow not yet tributary to the WWTP 0.1030 e. WWTP facility's actual avg: flaw .2,0320 E Total flow for this specific request 0_ g. Total actual and obligated flows to the facility 2.43 74 h. Percent of permitted ftow used 49.740/a Q. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Firm/Design) Daily Flow, MGD Chown PUD PS ADF.0.103 mg 0.08 mgd III. Certification Statement: I, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the mute to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station an route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed abovo in Sections I and Ii for which I am the responsible party. Signature of this form indicates Date Name: CLINTON SOUTH Location: 034" 59 26.46" N 078" 18' 30.91" W NAD27 Date: 8/10/2009 Caption: Russell St Water And Sewer Improvements Scale: 1 inch equals 4000 feet FORM WSCAS-12/07 0 Oo WArF9pG WATERSHED CLASSIFICATION ATTACHMENT o < FOR SEWER SYSTEMS Applicant Name Project Name City of Clinton Clinton — Russell St Sewer Improvements Professional Engineer Name Engineering Firm Name David A. McClure, P.E. Withers & Ravenel, Inc. Location ID Name of Waterbody' County River Basin Waterbody Stream Index No. Waterbody Classification 1 UT to Rowans Branch Sampson Cape Fear 18-68-2-8 QSW ' If unnamed, indicate "unnamed tributary to X", where X is the named waterbody to which the unnamed tributary joins. l certify that as a Registered Professional Engineer in the State of North Carolina that I have diligently followed the Division's instructions for classifying waterbodies and that the above classifications are inclusive of the stated project, complete and correct to the best of my knowledge and belief. PE Seal, Signature and Date *** END OF FORM WSCAS-12/07 *** FORM: WSCAS-12/07 Page 1 of 1 Y Name of Stream Description Cuff. Class Date Basin Stream Index # Spearmans Mill From source to Six C;Sw 04/01/59 Cape Fear 18-68-2-15 Creek Runs Creek Gaddy Branch From source to Six C;Sw 04/01/59 Cape Fear 18-68-2-16 Runs Creek Tarkill Branch From source to Six C;Sw 04/01/59 Cape Fear 18-68-2-17 Runs Creek Mill Swamp From source to Six C;Sw 09/01/74 Cape Fear 18-68-2-2 Runs Creek Gillmore Swamp From source to Six C;Sw 07/01/73 Cape Fear 18-68-2-3 Runs Creek Tenmile Swamp From source to Six C;Sw 07/01/73 Cape Fear 18-68-2-4 Runs Creek Beaverdam Swamp From source to Six C;Sw 07/01/73 Cape Fear 18-68-2-5 Runs Creek Turkey Creek From source to Six C;Sw 04/01/59 Cape Fear 18-68-2-6 Runs Creek Hicks Branch From source to Turkey C;Sw 04/01/59 Cape Fear 18-68-2-6-1 Creek Mill Run From source to Six C;Sw 04/01/59 Cape Fear 18-68-2-7 Runs Creek Rowang'Braticl From source Ea Six'; C;Sw 04/01/59 Cape Fear 18-68-2-83 fCts®sttitlC Pc>ndI"( Runs Creek Bull Branch From source to Six C;Sw 04/01/59 Cape Fear 18-68-2-9 Runs Creek Clear Run (Swamp) From source to Black C;Sw 07/01/73 Cape Fear 18-68-3 River New Hope Creek From source to Clear C;Sw 07/01/73 Cape Fear 18-68-3-1 Run Red Hill Branch From source to New C;Sw 07/01/73 Cape Fear 18-68-3-1-1 Hope Creek Free Will Creek From source to Clear C;Sw 07/01/73 Cape Fear 18-68-3-2 Run Beaverdam Creek From source to Clear C;Sw 07/01/73 Cape Fear 18-68-3-3 Run Big Branch From source to Black C;Sw 09/01/74 Cape Fear 18-68-4 River Juniper Branch From source to Black C;Sw 04/01/59 Cape Fear 18-68-5 River Devane Branch From source to Black C;Sw 04/01/59 Cape Fear 18-68-6 River Rocky Branch From source to Devane C;Sw 04/01/59 Cape Fear 18-68-6-1 Branch Canty Mill Creek From source to Black C;Sw 09/01/74 Cape Fear 18-68-7 River Cobb Branch From source to Canty C;Sw 09/01/74 Cape Fear 18-68-7-1 Mill Creek Wild Cat Creek From source to Black C;Sw 09/01/74 Cape Fear 18-68-8 River Keith Branch From source to Black C;Sw 09/01/74 Cape Fear 18-68-9 River Page 5 of 6 2009-08-08 07:11:28