Loading...
HomeMy WebLinkAbout20201435 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201108Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, November 8, 2020 12:01 AM To: jlawler@smeinc.com Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Line 5 Section 1 HDD - Rock Fish Creek - 20201435 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 5 Section 1 HDD - Rock Fish Creek that you submitted on 10/8/2020. The ID number for that project is 20201435, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored ID#* 20201435 Version* 1 Regional Office* Fayetteville Regional Office - (910) 433-3300 Reviewer List* Chad Turlington Pre -Filing Meeting Request submitted 10/8/2020 ..................................................................................................................................................................................................................................................................................... Contact Name * Joey Lawler Contact Email Address* jlawler@smeinc.com Project Name* Line 5 Section 1 HDD - Rock Fish Creek Project Owner* Project County* Owner Address: Piedmont Natural Gas Hoke Street Address 9751 Southern Pine Blvd Address Line 2 aty Charlotte Fbstal / Zip Code 28273 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Chad Turlington Please give a brief project description below. Piedmont Natural Gas needs to replace a damaged segment of 12-inch diameter Line 5 natural gas pipeline with a new segment that will be installed by horizontal directional drill (HDD), partially within a new 30-foot wide easement adjacent to their existing 50-foot wide easement. This site is located north of Arabia Road and south of Pittman Grove Church Road in Hoke County. Approximately 730 linear feet of the existing pipe is proposed for replacement by HDD. This segment of Line 5 is located beneath Rock Fish Creek and its adjacent riparian wetlands. Mechanized land clearing of forested wetlands will likely be required. The project may require pre -construction written approval under Nationwide Permit No. 12 and General Water Quality Certfication No. 4133. Please give a couple of dates you are available for a meeting. 10/30/2020 Please attach the documentation you would like to have the meeting about. Line 5 Section 1 HDD - Rockfish Creek.pdf 288.57KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature ,7o Y L.4W1'I'l Submittal Date 10/8/2020