HomeMy WebLinkAbout20201436 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201108Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, November 8, 2020 12:01 AM
To: jlawler@smeinc.com
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for Line 5 Section 1 HDD - Little Marsh
Swamp - 20201436 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 5 Section 1
HDD - Little Marsh Swamp that you submitted on 10/8/2020. The ID number for that project is 20201436, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20201436 Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 10/8/2020
..............................................................................................................................................................................................................................................................................................
Contact Name * Joey Lawler
Contact Email Address* jlawler@smeinc.com
Project Name* Line 5 Section 1 HDD - Little Marsh Swamp
Project Owner*
Project County*
Owner Address:
Piedmont Natural Gas
Robeson
Street Address
9751 Southern Pine Blvd
Address Line 2
aty
Charlotte
Fbstal / Zip Code
28273
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
USA
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Chad Turlington
Please give a brief project description below.
Piedmont Natural Gas needs to replace a damaged segment of 12-inch
diameter Line 5 natural gas pipeline with a new segment that will be
installed by horizontal directional drill (HDD) within their existing 50-foot
wide easement.
This site is located north of NC Highway 20 and south of McGougan Road
in Robeson County. Approximately 1,270 linear feet of the existing pipe is
proposed for replacement by HDD. This segment of Line 5 is located
beneath Little Marsh Swamp and its adjacent riparian wetlands.
The project may require pre -construction written approval under
Nationwide Permit No. 12 and General Water Quality Certfication No. 4133.
Please give a couple of dates you are available for a meeting.
10/30/2020
Please attach the documentation you would like to have the meeting about.
Line 5 Section 1 HDD - Little Marsh Swamp.pdf 228.02KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/8/2020