HomeMy WebLinkAbout20201432 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201108Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Sunday, November 8, 2020 12:01 AM
To: dIutheran@segi.us
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for Autry Lakes at Four Gates - 20201432 Ver
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Autry Lakes at
Four Gates that you submitted on 10/8/2020. The ID number for that project is 20201432, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored
ID#* 20201432
Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 10/8/2020
Contact Name * Dana Lutheran
Contact Email Address* dlutheran@segi.us
Project Name* Autry Lakes at Four Gates
Project Owner* Cliffdale Corner, LLC
Project County* Cumberland
Owner Address: Street Address
5315 South College Road
Address Line 2
Suite E
City
State / Province / Pegion
Wilmington
NC
Postal / Zip Code
Country
28412
us
Is this a transportation project? * r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit F- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.
The project is a single family subdivision, which will require filling Section
404 wetlands, for the purpose of a single road crossing, and open waters
(i.e. pond), for the purpose of discharging stormwater. At this time, a
wetland impact map is being prepared. However, attached you will find the
overall site plan, which includes the limits of Section 404 wetlands and the
pond. Also, I have attached the USACE's valid PJD, for the project. It is
anticipated that less than 0.10 acre of wetlands and 0.05 acre of open
water will be impacted to facilitate the construction of roads and installation
of infrastructure.
Please give a couple of dates you are available for a meeting.
10/21 /2020
10/20/2020
10/22/2020
10/23/2020
Please attach the documentation you would like to have the meeting about.
Autry Lakes at Four Gates Overall Site Plan.pdf 1.57MB
Pelican-Dundle PJD.pdf 1.18MB
pdr only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
�rzs�rz 0�, t'-Jr� crr
Submittal Date 10/8/2020