Loading...
HomeMy WebLinkAbout20201440 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201109Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, November 9, 2020 12:01 AM To: pmcdougald@critekgroup.com Cc: Homewood, Sue Subject: Pre -Filing Time Clock has been reached for Mitchell WTP Residuals Improvements - Phase 1 - 20201440 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Mitchell WTP Residuals Improvements - Phase 1 that you submitted on 10/9/2020. The ID number for that project is 20201440, Version Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201440 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 10/9/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Peoria McDougald pmcdougald@critekgroup.com Mitchell WTP Residuals Improvements - Phase 1 City of Greensboro, Water Resources Department Guilford Street Address 2602 S Elm -Eugene St Address Line 2 aty Greensboro Rbstal / Zip Code 27406 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country us Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * Mitchell Water Treatment Plant in Greensboro, NC will be making improvements to the plant which will include a new 12-inch ductile iron force main from the plant to the new 54-inch sanitary sewer line being designed by others on E. Lake Drive. The installation of the 12-inch force main will include crossing North Buffalo Creek at a 105 degree angle. The pipe will be installed by jack and bore, approximately 123 feet under Benjamin Parkway. The remainder of the piping will be installed by open cut trench methods, including North Buffalo Creek. Approximately 100 LF of clearing will need to be done within North Buffalo Creek riparian buffer to install piping. The red cloud in the attach drawing indicates where the clearing will be. Please give a couple of dates you are available for a meeting. 10/26/2020 10/27/2020 10/28/2020 10/29/2020 10/30/2020 Please attach the documentation you would like to have the meeting about. Mitchell FM Open Cut Design Plan and 579.21 KB Profile.pdf pdr only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/9/2020