Loading...
HomeMy WebLinkAbout20150998 Ver 8_PreFiling Email 30-Day Clock Reached Email_20201112Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, November 12, 2020 12:00 AM To: richard.harmon@woodplc.com Cc: Mairs, Robb L Subject: Pre -Filing Time Clock has been reached for Sutton Lake Dam Rearmament and Vegetation Removal Project - 20150998 Ver 8 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Sutton Lake Dam Rearmament and Vegetation Removal Project that you submitted on 10/12/2020. The ID number for that project is 20150998, Version 8. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20150998 Version* 8 Regional Office* Wilmington Regional Office - (910) 796-7215 Reviewer List* Robb Mairs Pre -Filing Meeting Request submitted 10/12/2020 Contact Name * Richard Harmon Contact Email Address* richard.harmon@woodplc.com Project Name* Sutton Lake Dam Rearmament and Vegetation Removal Project Project Owner* Duke Energy Project County* New Hanover Owner Address: Street Address 410 S. Wilmington Street Address Line 2 aty State / Frovince / Region Raleigh North Carolina Rbstal/Zip Code Country 27601 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit W Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* DWR 15-0998 v6: WQC004207 Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below.* On behalf of Duke Energy, Wood Environment & Infrastructure Solutions, Inc. (Wood) previously submitted a Joint Individual Permit (IP) Application for the L.V. Sutton Energy Complex- Sutton Lake Dam Rearmament and Vegetation Removal Project located at the L.V. Sutton Energy Complex in New Hanover County, North Carolina. The U.S. Army Corps of Engineers (USACE) issued Action ID SAW-2011-00858 for authorization of fill impacts to jurisdictional waters on March 30, 2019 and the NC Department of Environmental Quality, Division of Water Resources (NCDEQ-DWR) issues an Individual 401 Water Quality Certification WQC004207 on March 20, 2020. A request is made herein for a modification of the issued USACE IP and NCDEQ-DWR WgC004207. The modification request includes background information, the rationale (updated purpose and need) for the proposed action, updated Plan View drawings, updated tabular data on newwetland impacts, and compensatory mitigation. The proposed modification to the issued USACE IP (SAW-2011-00858) and NCDEW-DWR Certification (WQC004207) is necessary to address the following item of concern. This item of concern must be resolved for completion (closure) of the Sutton Lake Dam Rearmament and Vegetation Removal Project and to assure that the authorized activities onsite for the project are in compliance with USACE regulatory requirements. The item of concern entails the additional placement of stone (rip -rap) within the 15- foot zone (repair area) from the toe of the dam. The stone was placed beyond (waterward of) the six-foot zone and was a field action that occurred during the initial construction effort to armor the cleared zone with geotextile fabric and rip -rap. Furthermore, the field change was based on engineering judgement, or necessity, that additional armament would be required in specific observed locations. This action resulted in an additional impact of 0.493 acre to Wetland E. Furthermore, this action was completed as based on the need to clear tree and shrub vegetation from areas of armament within the 15-foot zone from the toe of the dam. Please give a couple of dates you are available for a meeting. 11 /12/2020 Please attach the documentation you would like to have the meeting about. USACE Sutton IP Mod Ltr RGH(3)- 10.12.2020 105.97K6 (004).pdf Figures A-L.pdf 2MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature {� rs�lP•gl.P`� �j`�L�it'dI� Submittal Date 10/12/2020