Loading...
HomeMy WebLinkAboutNCC205113_NOI Application_20201112Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/4/2020 3:46:27 PM (NCG01 NOI Submission) Approve by Garcia, Lauren V 11/9/2020 8:38:27 AM (Review- Construction NOI 35134) • The task was assigned to Garcia, Lauren V by round robin distribution 11/4/2020 3:46 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 6, 2020 5:00 PM 11/4/2020 3:46 PM Submit by Selkane, Aziza 11/12/2020 12:14:25 PM (Payment Verification for NCC205113) * Herbert B parks • Selkane, Aziza assigned the task to Selkane, Aziza 11/12/2020 12:13 PM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 21, 2020 5:00 PM 11/9/2020 8:38 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * McKnight Mill Estates Phase 4 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 38-77 2. County* Guilford 3. Highway or Street Ram Road Address* Street narre only is acceptable if no address number assigned yet 4.CityorTownship* Greensboro 5. State * NC 6. Zip Code * 27405 7. Latitude* Enter the latitude in decimal degrees 36.1490 8. Longitude* Enter the longitude in decimal degrees (MUST be negative) -79.7150 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/06/2020 Estimated Construction Project Start Date 10. Date to End* 11/19/2021 Estimated Construction Project End [date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial Classification for Developrrent 12. Acres to be 14.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 64.33 (acres) * 14. Post- 3.25 construction (Estimated) impervious area (acres) * NCC Project NCC-GUILF-2020-McKnight Mill Estates Phase 4 Tracking ID Assigned automatically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving North buffalo creek Waterbody* %rm of waterbody into which storrrwater runoff will discharge 15b. Waterbody 16-11-14-1 Index No.* NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Responsible Entity Name * McKnight Mill Homes 7, LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Herbert If Corporation, enter Registered Agent First %rre 3. Last Name* Parks It Corporation, enter Pbegistered Agent Last %rre 3b. Title managing memeber 4. Permitee E-mail hparks@byrondev.com Address* 5. Permittee 336-282-4127 Telephone No.* 6. Permittee Mailing Street Address Address* 7b Corporate Center Court Address Line 2 City State / Frovince / ilegion Greensboro NC Fbstal / Zip Code Country 27408 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 7b Corporate Center Court Address Line 2 City State / Frovince / Region Greensboro NC Fbstal / Zip Code Country 27408 us 8. Type of Non -Government Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Patrick Contact - First Name * 2. Primary Site Donnelly Contact - Last Name * 3. Title Member 4. Site Contact E- pdonnelly@byrondev.com mail Address* 5. Site Contact 336-282-4127 Telephone No. 6. Organization McKnight Mill Homes 7, LLC Name 7. Site Contact Street Address Mailing Address* 7b Corporate Center Court Address Line 2 City Greensboro Fbstal / Zip Code 27408 8. Consultant Name (Optional) Anthony Lester First and Last nacre 9. Consultant E-mail adl@evans-eng.com This person will be copied on all correspondence. 10. Consultant 3363824416 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/28/2020 Approved * 2. E&SC Plan Project 3010 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* City of Greensboro Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Approval Letter (3010).pdf 377.03KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification NOI Phase 4 11042020 signed PJD.pdf 526.65KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent IT Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature /01W J. IsM,* Type Name* Patrick J. Donnelly Title COO - Manger -Member Organization Legally Ibsponsible Entity McKnight Mill Homes 7, LLC Date * 11 /04/2020 F. Tracking and COC Info NOI Tracking No. 35134 NC Reference No. NCG01-2020-5113 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205113 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5113 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205113-2020 Invoice Due Date 12/9/2020 Initial Fee $ 100.00 Invoice Status OPEN