Loading...
HomeMy WebLinkAbout20021410 Ver 4_Stormwater Plans_20100609Sto?mwate? Management Calculations Dixie River Road Roadway Project Prepared for: City of Charlotte Engineering and Property Management 600 E. Fourth Street, 14th Floor Charlotte, North Carolina 28202 0 Kimley-Horn and Associates, Inc. 2010 This document, together with khe concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation byKimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. DIXIE RIVER ROAD ROADWAY PROJECT CHARLOTTE, NORTH CAROLINA STORMWATER MANAGEMENT CALCULATIONS Prepared for: CITY OF CHARLOTTE ENGINEERING AND PROPERTY MANAGEMENT 600 EAST FOURTH STREET CHARLOTTE, NORTH CAROLINA 28202 Prepared by: KIMLEY-HORN AND ASSOCIATES, INC. 1919 SOUTH BOULEVARD, SUITE 100 CHAR.L?TTE, NORTH CAROLINA 25203 ?? ???? - ? ? ? ? ?. ? ??? *i ??? ??? ? ?ry ? ? ? ? ? 4 ?? ??q??v ?f ??' ? ? "` ?? ???? 20??? KHA Ref: 015016055 JiJNE 2010 TABLE OF CONTENTS OVERVIEW SITE MAPS SITE VICINITY MAP SCS SOIL SURVEY FEMA FIRM PANEL WATERSHED MAPS PREIPOST DEVELOPMENT WATERSHED MAP -WET DETENTION POND #1 PRE-DEVELOPMENT WATERSHED MAP -WET DETENTION POND #2 POST-DEVELOPMENT WATERSHED MAP -WET DETENTION POND #2 WATER QUALITY WET POND CALCULATIONS ANTI-FLOTATION DEVICE CALCULATIONS VOLUME AND SURFACE AREA TABLES WET DETENTION BASIN SUPPLEMENT FORMS RIP RAP CALCULATIONS WATER QUANTITY CURVE NUMBER CALCULATIONS TIME OF CONCENTRATION CALCULATIONS HYDROCAD HYDROLOGY REPORT CULVERT CALCULATIQNS CULVERT SIZING CALCULATIONS AND REPORTS CULVERT 2 DOWNSTREAM DITCH CALCULATIONS STDRI?IWATER ?VIANAGENIENT CALCULATIONS ? Dixie River Raad Roadway Project, Charlotte, NC OVERVIEW Background This report contains the approach and results of a stormwater analysis conducted for the Dixie River Road Roadway Project. The project is located approximately half a mile south of the I- 485/Steele Creek Rd (NC 160) intersection and will require disturbance of approximately 34 acres. The project includes the realignment of Shopton Rd. West (previously completed), realignment and widening of Steele Creek Rd (NC 160), and the realignment of Dixie River Road (NC 1155). Existing Conditions Steele Creek Road is a two-lane facility with a system of roadside ditches and cross culverts that contribute to the Beaver Dam Creek Tributary. Dixie River Road is an existing two lane roadway with a system of roadside ditches and cross culverts; however, the section of realignment is currently undeveloped. Floodplain/Floodwav The proposed site does not lie within a 100-year floodway boundary as determined by FIRM Panel # 3710451100J. Water Quality Water quality treatment by means of permanent Best Management Practices (BMP's) will be provided using two wet detention basins as treatment. The ponds are desired to treat the first inch of runoff per the North Carolina Division of Water Quality (NCDWQ) Stormwater Best Management Practices Manual and will draw down over a period of two to five days. Wet Detention Basin 1 and 2 are designed to provide a minimum 90% average annual removal of Total Suspended Solids (TSS). Wet Detention Basin 1 is designed to treat only the runoff from the roadway. The proposed site plan for this area includes a separate BMP to treat the offsite drainage area. Wet Detention Basin 2 is designed to treat the roadway and additional offsite drainage that is currently draining to the basin. Water Quantity The proposed wet detention ponds have been designed to address the water quantity requirements to match pre- and post-development peak runoff rates for the 1-year, 24-hour storm events per the NCDWQ BMP Manual. These ponds will also control the peak runoff rates for the 10-year, b-hour and 25-year, 6-hour storm events per the City of Charlotte, NC. The 100-year, b-hour storm event was checked for b" of freeboard at the top of bank. STDRMWATER MANAGEMENT CALCULATIONS Dixie River Road Roadway Project, Charlotte, NC Results Pre-development 1-yr, 24-hr storm Post-development 1-yr, 24-hr storm DA-? 2.43 cfs 1.11 cf s DA-2 0.84 cfs 0.83 cf s f'.nnrhtcinn The proposed wet detention basins were designed using methods prescribed by the aforementioned resources. HydroCAD software was utilized to evaluate the pre-development and post- development flow rates. HydroCAD utilizes TR-55 methods of calculating times of concentration (based on sheet, shallow concentrated, and channelized flows) and SCS curve number method of generating hydrographs (results are provided in Appendix C). Based on the analyses provided herein, the proposed system will be adequate to address the starmwater requirements of the North Carolina Department of Environment and Natural Resources, Division of Water Quality. STORMYVATER MANAGEMENT' CALCULA2'ION5 Dixie Raver Road Roadway Project, Charlotte, NC STOR?YIWATER MANAGEMENT CALCULATIGNS Dixie River Raad Roadway Project, Charlotte, NC ?. `'" ?? cNa RL o rrF Dn[lGLAS AIRPGRT ? ??? 1 ? ? a Z a U ? ?? W ? ? a v o? i ? W .? W I? Z y o? y IF * ?+ y ? SF#?TG'1hII??1;D i ? ? ? i ? ? ? SITE ? wk /• ? ?vcaTlo?v ? S i ? ?,? _? l ?,? ?? ? f ?;e 1 ? i ,? ? ? +? i? . ?? ??? ? ??' ?? W ' ? ?? Y W? ? ?,. y 0? ?4 WES TlNGIyOUSE ROq D ?¢ y __ ? ? ?imley?Ham R RAC E?I?RE ??? and,4ssaciales,mc. REALIGNMENT Q zD°? PRE-DEVELOPMENT SITE LGCATI?N I ? 4851 CHARLdTTE PARK DR, STE 3°° ??? Charlotte, North Carolina 28217 THIS DOCUMEM. TOGETHER WITH THE OONCEFIS AND DESIgr5 PRESENTm HEREIN, AS AN INSTRUMENT OF SERVICE. 15 IME]?IDED ONLY FOR THE PURPOSE AND gJEM FOR WHICH R WAS PREPARED, REUSE OF AND IMPROPER RELIANCE ON THIS DOCUWIENT WRFIOIl? WRRIEN AUTHORIZATION 1WD ADAPTATION EIY KIMLEY-HORN AND ASSOCUITES, INC. SHALL 6E WRHOUT IJABIIJTY TO IQMLEY HORf? AND ASSOCIATES, INO. ? If?mleyHDm ?E ??? and Associates, Inc, DIME RIVER ROAD ? 2DD9 ROADWAY PROJECT SOILS MAP 1919 South Blvd, 5ux? 100 Charlotte, North Carolhia 7.8203 1HI5 DOCUMENT, 1TJGEIHER WRH THE CONCEFIS AND DESK;N5 PRE5IENTED HERE]N, A5 AN INSIRUAIENT OF 5ETtV1CE, 15 INTENDED ONLY FOR THE PURPOSE AND CLIENT FOR WHK?i IT wA5 PREPARm. REUSE OF AN6 IMPROPER RELIA4ICE DN 1HI5 DOCUMENT MRIFIOUT WRITTEN AUTHOR12ATK)H AND ADAPTAl10N ElY KIMLEY-HORN AND ASSOCIATES, INC. SHALL EIE WRFIOUT L1ABIllIY TO KIMLEY--HORN AND ASSOGATES, INC. K: ~csEloEV~oisois cry or cna~iotte~oss o~x~e R~~e~ rzom s~o~mwa<e~ Ma~a9eme~~~cai~:~~e Po:< as maP.aw9 June 01. 2010 - 3:OBpm 3: pm By. kate.tripl t r~ yes Bs ~ ~ s \ 9J - . ~adoa ~33a~ 3~3~s e; - a I ~ m -r z ~I ~ ,m o - - ~J 111 ~ i!~i,~ Ql~iiilli~' ~ ~1 A D ' iil~i ~ ~ ~ v m~ yl'll~ o i l~. o C~ om III~~' o a ~ ~1 m n „ .b m ~ i ~~~I~ -T z D ~ M x O N o ~J~~ I N ~i n ~ ~ ~ 9 I~ m T C~ ~ m ~ ~ ~ ~ ~ m o ~ rtl~~~ ~ ~'I \ B~II~~ ~ III D a ~ .e a '^~~iiii~li~l I ~ ~~i~ ~I ip.- ~ f~ A ~ II ? I~Ilill~~llij~ v' d I ~''.j~~~ ;;fi ~ 1 o yl.li~li~l~ Q II ~ ~ ~~I~h ;inn ~I~~~ 1 ~ I II ~ ~ v ~ Ijll ICI) ~II~ ~ ~ ~ ~ ~ ~ I I~ I~ ~ I~ I~ I~ ~ I~~; ~~II4 , , ~ aomn~ z `I~ I~ I ~ I'1 ~ z~-v ~ ~lll~ll ~II~ ~II~~~~ rr~ I~ ~ ~I ~ I ~i,1 I 0 ~ ono vv~o chi, i (I ~I ~ ~I~ ° ~ D ~ D ~-a ~ ~~I~~I~~I~~ IiII~~I~ m ro ~o ^ I~ I I~ ~I ~I D mz°m m I~~~ ~ I~ I~ ~j~,i~~~~U ~~I'~~I~ fl ~ , m v ro `~I ~I ~I~~I~~I I - Dr~~' my III I I ~ / II~i~I I~Ijlll ' ~ III , , ~ I~~II~ I~Ij~lj~ I~~I~~I~~I o goy ~D ~ I I I I ~jI~I~~~I o~ D~ ~~~I~~I~~I~~I ~I ~ ~I~~l~~l~~ ~ I~I~III~III~~ li , ~ ~ N I I I~ I II ~ ~ ~~~~t II n m~~ v~ 1~~~I~~I~Ij~~jll'~ I ~~11'~I~~II~ z Dim m ~ I) I~ I I~ ~ ~ ~ v o cn ao ~ I I I i I I I (I I i I ~ D„~ Iii ~i~~l~~I~Ii~~l I ~~I~~i ~~I~I II'''IIIIIIII~ , jllll''II~III~II~~ Z~~ ~ ~~I~ III ~I~ ~II~ ~ I~,I S ~IIIII ~ II ~ ~°D ~O ~j`I~Ilj~li~~l~~ j~ - X89 I~I~ I II ~ ~ om ~z ~ I~ ~ I~ I~ li I~ I II i~ I~~III~IIjl~lljl~ e i m r ~I I I I I ~a I I~ I~ III li~~lij~l'~~iliill~ ~ ; , ~ vn '~~~~I~~~~ ~~Ii ~II~I~~I~~~~ ~ r p ~~~~~~I~~II~ ~ I I I I o ~ ov_r ~~~~~I~~~~ I~~I~~I~~ ~ IIIIII , c ~ mZ~ ICI I~~I ~If~~ ~ ~ II I!` ICI) I 0 0 ~ m ~ i~~~ il~~ I~ I~ I~i~~l~~lj~~~ ,i,i~ii~i i ~ 1 0 z C `1'~I ~ ~~1 ~ 1 ~ I~ I ~ I (I I o ~ I ~ ~ III ~I~ ~ i (i ~~,~I~II ~ r ,c z~ r j~ i~ ~r'~~~~~~~~~'~~ ~r~~~~ s~ ~I i ~ ~ ~ ~ ~ j ~Ii ~ I ilk I~I'~'ll~'~~ ~ m ~a ~J ~ ~i iii i'iii ~ ~ ~ ~D m ~ ijl~~l~~~'j~~j~~l~~~~~'+ ~~9 ~I~IjI ~~I~ VIII o m m l o Z _ - _ _ 1~f~~~l~ ~~,~~~i~~l~jl~ _ JIB ;~~~~I~` ~~I z ~ ~ l~~~t l ~j J~ ~ I ~ I I I I I ~ I ~ I ~~~I ~ ~ i/~ ~i~~li iii/i ~i/1 ~<9 i I ~ I~ ~ I~ I~ I I ~ I ~ ~ ~ ~i l~~ l~~ l~ ~ ~ I ~ I ~ I ~ I I ~ I illl'il'Ijlll~lY ~ , H 1 C~ N ~~I'~' z ~z°~d 1 iii o~ ~ ,~~'is ii~~i li~ , D lj ~I ~j rJ~~~I ~~I j ~~j ~I Z ,,~T ~~Ijij~l~~l ll~, ` T ~ ~ ddAL r_' - - - 1 e !V ~ ~p7 i/T~ 1 ~ r e ~ _ v `y\ e ~ i ~ ~j~ l~ ~1~~! ~ O ~ r ~~~l~jliflj l O ~ o ~ ~ ~ t =3'- ~ ? ~ ff~~~ 1 00 W ~ : Z rn Q r0 Rl c ,v ~i~~ii~/ i/~ z H II ~ e W a II M 4J _ 't Q ~ ~ y ~ ~ ~ ,i P u ~ 't.., N ~ , ~ a e 0 ° a ....i.. J r. n / ~~/~~~/j~~~ X30 r ~ m ~~~~~~/~~~~~j~ ti ~l ~ ' k ~j ~ i ~ ~ %i' ~ ~ ` v a~~ ` ~ 1'=~ ~ oti ~ .m ~ - , . ~ ~ ~ n o ~ ~ ~ ~ i~~~ h~ . ~ ~ !~i 20 ~ j~~ 0~' / ~ Z %j . o ~ '~~i~i~ ~ ,ti .i I a s a a ' n a~~~~ ~ ~~ti 9 1 61~ _f s C r ~~i~ A ~ ~ 6 1 i ~ i ~ 1 I o%~ 0~1~1 ~~~~~~A ~ r. ® I \ ~o~ \ ~ 1 1 T I M - ~ h~O~ NO. DATE BY DESCRIPTION SHEET DIXIE RIVER ROAD 015016055 ,N = 60 Plans Prepared By: • STORMWATER JOB NO. SCALE DA-l K,=-=vM,eme 04 0 awata aas otia wv~ Roaa sue. ww.m.nY~.\s.. na0 do mm.da MANAGEMENT PLANS CAD FILE PATH o0co ? m Kimley-Horn m ? and Associates, Inc QC 2009 NC License #F-0102 OF PRE/POST DA MAP PREPARED BY CHECKED BY 4651 Charlotte Park Drive, Suite 300 CHAH IARLOTTES. DA-3 WET POND 1 BT 12-04-2009 APPROVED BY DATE Charlotte, NC 28217 00) K: CSE LDEU 015016 Cit of Charlotte 055 Dixie River Raad Stormwa er Mana ement Calcs re ost da ma .dw _ _ y g p_ p_ _ p g June 01. 2010 - 3:09pm 3: Q9pm By. kate.triplett cn p n c m z p m z a; n 0 z n s. r m 0 N Z e..... m Q' fil' ~~----r~ - : s Z a hl f~l' w i~ ~ A Z ° _ _ . hl' ~o 3 ~ ~o fil' 0 r• n 3 n Z i"i . H ~ O y Z Z o - _ ~i ~ ZJ C Pl Z O i rrl b ~ 0 C fTl Z ~ --1' f~l' N Z -P t O Z r a. ~ ~ O _ F ¦ ~ ¦ ~ ' I ~ i r i o o , x / A ~ 1 o t t n ~ D , ~ ~j / Z Z ~ ~ r , ~ ~ m ~ , ~ ~l ~ $ O~ ~ o ~ ~ / m O ~ , m ~ ~ o ~ ~ ~d ~ ~ ~~y y`~N - m j ~z~ N ~ N~,~ . . o ~ ono ~o~ ~ z O ~ ova ~ ~ ~ ~ o ~ ~ n o . ~ ! o r . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N ~ , ~ D X m 1 o / ~ o , D i t o , z ~ • ~ p ~ ~ , Z ~ m C7 ~ m N z= O , ~D z , ~ ~ D ~o~ z v , D N , O n D ~ _ , m m z ~ n -r~ ~ , D z ~ ~ D ~ r r ~ , ' ~ w - _ • o ~ r? r ~ • D , W , r , 0 , m , z 0 z 1 D Z D D I 1 O c7 I D 1 1 Z C~ ~ v ~ ~ V N m D O Z I TI ~ n m O D I ~ rn I 1 - 1 Z ~ C7 m m y e z D O Z I NO. DATE BY DESCRIPTION SHEET DIXIE RIVER ROAD 015016055 ,N = 60 Plans Prepared By: • STORMWATER JOB NO. SCALE DA-2 K,M-WvM,eme 0" 0 awaca oas oea. wvw ieoaa six. ww.m.nV~.*. vd do m4aro ~ Kimley-Horn MANAGEMENT PLANS CAD FILE PATH (CCO ? MMI ? and Associates, Inc Q 2009 OF PRE DEVELOPMENT ~ PREPARED BY CHECKED BY NC License #F-0102 CIAHAH 4651 Charlotte Park Drive, Suite 300 Charlotte, NC 28217 IARLOTTE..., DA-3 WET POND 2 BT 12-04-2009 APPROVED BY DATE '00) K: \CSE~DEV\015016 City of Charlotte\055 Dixfe Rfver Road Stormwater Management\Calcs~pre post da map.dwg d~~e oz, zoio - s: saP I,~ $ 5:54pm By. lorin.les 2 v 0 n c m z 0 c~ m m I~ z m ~ ~ c~ 0 z c~ m v o 1 1 cn D , z v v , l ~ 1 m ~ ~ ~ c~ z v~ m m z ~ , v ~ ~ , z ~ ~ 1 ~ ~ ~ m d m ^ ~ z ~ z x ~ , ~ ,1 cDi~ ~ ~ ` i C~ t~ , D o~ C J v; Z ~ Z ~ ~ f ~ ~ ~ ~7 m ~ , z ~ , o ~ o v~ ~ g m 5 n a ~ m , ~ I',' z , z v m v o , z _ ~ ~ ~ ~ ~ ~ ~~I~~~~~ .Z) l llllll~ l i J ~ ' I~~~' ~ , m c~ , n v c , y . n ~ ~ i / ~ E ~ o v' ~ a N o.. ~ co Z , ~oo~°Q /4 ~i.~~v~ _ ~ moo' o ~ Z Z~4C ~ O , ~~_z ~ d ~ rO~~ Q , j y a v m Tl 0 O rn ~aN U r+ ~ ' o ~c-~ID r , O 0~ ~ ~ pC~~ ~ m ~ ~ , c Z ~ O y m 0~0 o ~ D ~ Z rn Az d v C D y ~ , m ~ r ~nj I c , ~ ~ C N C o ~ rn ~ ~ DD ~ m ~ ~ ~ ~ ' D ~ 'i m zv,~ O Z Z Z DN[n ~ ~ ~ fTl , v ~f~Tlrn N o ~ ~ ~ , m , o z ~ ~ 0 1 t 1 m , z D o C O o ~ r ~ Z I z t v D O ~ , - , A~ , ~ , , , 0 z , , W , ~ ~ , r m x \ 0 z D Z v n r D O C7 D N Z C7 r 2 D r r m m 0 z 0 c r , D m ~a¢ r ' ~,~TC ~ r~• { ~ D ~ 0 z ~ ~ Z ~ , ? • ~ ~ ~c~ • `~~F , Z ~ o ~ D m D ~ ~ ~ ~ 9eo ~ ~ o O D ~ z~ D c np r'_' ~ L~ Z D Z n ~ m 0 , Z D - ~ . D - - ~ e O , Z ~ ~ ~ - ~ ~ _ - -R>~~- 'li"9~~y D f ~~'c~` i .s~~e Fob ~ SHEET DIXIE RIVER ROAD 015016055 1" = 60' NO. DATE BY DESCRIPTION Plans Prepared By: • STORMWATER '°B NO SCALE DA-3 MANAGEMENT PLANS of 4 ~ p~ CAD FILE PATH ~ Kimley-Horn ? ~ ? and Associates, Inc (CCO OF 1)0ST DE''IOPMNT ELE- PREPARED BY C BR~~M~AY Q 2009 NC License #F-0102 CHAI DA-3 "ET POND 2 BT 12-04-2009 4651 Charlotte Park Drive, Suite 344 Charlotte, NC 28217 HARLOTTE. APAtpVED BY DATE mo) ??? IGmleyHom ? and associates, Inc. Project Information 1NET DETENTION BASIN 1 Project Name: Dixie River Road KHA Project #: 015016055 _ Designed by: IRT Date: 911712000 Revised b: Kl Date: 1I4J201 tl Revised by: Date: Site Information Sub Area Location: Drainage Area 1 +. Drainage Area FDA} = 5.41 Acres Imperviaus Area ?IA? = 2.51 Acres Percent Impervious ?I) = 46.4 Required Surface Area Permanent Pool Depth: SA1DA = Min Req'd Surface Area = Required Storage Volume: Design Storm = Determine Rv Value = Storage Volume Required = Elevations 2.9 6834 1 0.05 + 9182 -ft _ X90°l° TSS Removal via Pond) sf fat Permanent Pool) _ inch Project Does Not Drain to SA waters) .009 ?I) = 0.47 inlin cf ?abave Permanent Pool) Area ?s.f. ) Bank Elevation = 638.00 ft Tap of Pond Elevation = 638.00 ft Temporary Pool Elevation = 635.10 ft 10,625 Permanent Pool Elevation = 634.00 ft 1,800 Shelf Beginning Elevation = 633.50 ft Forebay Weir = 54.00 ft Shelf Ending Elevation = 634.50 ft Sediment Cleanout Elevation = 627.00 ft Bottom Elevation = 626.00 ft Wet Basin AreasNolumes Area @ Tap of Temporary Pool = 10625 sf (Elevation = 635,10 } Area @ Top of Permanent Pool = 7800 sf Elevation = 634.00 } Volume of Temporary Storage = 10134 cf Side Slopes of Pond = 3 :1 Side Slopes of Shelf = 10 :1 Side Slopes of Pond (below shelf) = 2 ;1 Yes ? 7800 ? 6834 } sf Is Permanent Pool Surface Area Suffcient ?yeslno}? Volume of Storage Provided 10134 cf Total Volume Sufficient ryesJno)? Yes Orifice Size = 1.50 inches Drawdown Time = 3.4 days ? ? KimleyHam ? and Aasociates, Inc. INET DETENTION BASIN 1 Project Information Project Name: Dixie River Road I<HA Project #: 015015055 Designed by: IRT Revised by: Revised by: Site Information Date: Date: Date: 114/2010 Sub Area Location: Draina a Area 1 Drainage Area FDA} = 5.41 Acres Impervious Area CIA} = 2.51 Acres Percent Impervious ?I} = 46.4 % Drainage Area} Qrifice Sizing Q? Days = 0.0586 cfs ?Flowrate required fora 2 day drawdown} ?5 Days = 0.0235 cfs ?Flowrate required fora 5 day drawdown} orifice Size = 1.50 in Diameter} Q o?f°° = 0.035 cfs Drawdown Time = 3.4 days less than 5 days ?yeslno} ? YES greater than 2 days ?yeslno} ? YES Orifice Equation; Q=CAg?l?2gh? Qz ? ? ? Q5 c = 0.6 Ag= Area of Pipe = n/4D2 g =gravity = 32.2 ft/sz h =orifice head = 1/3 (TPE-PPE-1/2D) TPE =Temporary Pool Elevation PPE =Permanent Pool Elevation D =Diameter ?ii ? ? Ifi?ey+lam ? and ll?sadales, Inc. NCDENR ANTIFL4ATAT14N DEVICE DESIGN CALCULATIONS per NCDENR Manual} Project Information Project Name: Dixie River Road Roadway Project KHA Praject #: 0?? 5?605b Designed by, IL#?T Date, 114!2009 Revised by: Date: Revised by: Date: Revised by: ? Date: Pond ? Drainage Area Information: Drainage Area (acy = 5.41 Flow ?Q?n} ?cfs) = 15,0 Storage Dimensions: Basin Side Slopes (X :1 } = 2 0 j2:1 max side slopes} Storage Depth "R" (ft} = 8 0 _ Elev fk? Area jF} C?e?mw?!aC+ve Vof?,me ?CF} Top of Basin Elevation ??;??.??.? ?.y. ??*?: 7 ?y?{ .}y# W 4f ?i i Temporary Pool Elevation ?:?? d9.?[? '?.?°"?' ???? Permanent Pool Elevation ???f?r.???? i +' ?'?? ?? ?'3??5Q ?r:?1 fir] ' . ? {. ? .??. ? + _ Bottom of Basin Elevalio?? Q Sizing of Antiflotation Block: Control Structure Length (in} = 48 Control Structure Width din} = 36 Riser Area ?sf} = 12.00 Check riser geometry vs. area equation} Volume of Water Displaced ?cf} = 96.0 Weight of Water Displaced (Ib} = 5,990 Min. Required Weight of Anchor Block (Ib} = 6,589 j1.1 factor of safety} Anchor Size; Width ?If} = 4.5 Length ?If} = 4.5 Height ?If} = 4.00 Weight of Anchor (Ib} = 7,096 O.K. ? Minimum Required Weight Sizing of Emergency Spillway: Quo ?cfs} = 15.0 Qsp;;;,?y ?cfs} = 15.0 Riser ignored} Water Depth Over Spillway eft} = 0.5 Spillway Length eft} = 45.0 (10 ft minimum spillway length, Cw=2.7} Spillway Crest Elevation eft} = 636.8 (1 ft min. above sediment storage depth} Freeboard (ft} = 1.00 (1 ft minimum} Page 1 of 1 `o' _. ?'? ?? 11 u a?i L a u V1 t a? F 0 U 0 N ? ? 00 ?X ? O 0 0 N 0 0 N ? 0 ? Y C 0 ,_ ? N ?k ?, E ? ???? ?0z•ov-?? L C N ?! ? ?o a '?, v v ?DaY?o?ac L a C ro m 0 v a? ? rv u? n m ? ? ?a U ? ? ? N 00 rl Ol ? 00 ? ? o o ?a rn m ? m rn n ?n n Q 0 N ? rI N m m ? u? ? ?-, ? rn o? m m ?a m ? ? ? o o ? rv cv ?o ?, n ?n m _ o?. rv ? ?o oo ? ? n oo 0 ? o u ?v r• ? ao rn rn ? m oo ? N `-' ,? ? n r-I lD N Ol N ?Q O O O O ? ? N N m m ? ? 0 0 0 0 0 0 o v o 0 ? 0 0 0 0 0 0 0 0 0 0 ? oo o n c, ? n oo ? 00 ? n rn m rv m ao r v ? u i n Q_• ? m u? ,n ? ? ? ? ? ? I? OQ al O r-I N m ? ? ? to ? v, W +? ?? ? 0 0 ?I J ? o C 0 ? o a ? a ? ? a o v ? Q ?? ? I E ? c m ? 0 ? ? ? ? ? O . ? ? m a ? ? 0 m N O N i? N l0 `? ?? n ? ? m N u a, ? 0- a, ? o ? o ? ? 7 a? p ?+ ?3 ? ? ? ? ? ? ? E tea, ? L L o a? o ? a ? ? ?' rn ? o ?n m ?o ? m o? ao oo E u ? o o N ?n ° o i ? ? ? ? a? ?n o ? n o m ?n ? ? o ? o m o m rn m rn Q ? ? N m d" rn ? O m ? oO N ?D oo oO O N rv j rl rl rl ri N N N ['? I.f} lD lD ? ? N 00 ? f? oo O c? N ca N rn O1 m ? ?a 00 oo 4D ?n cG ? O1 rn N ? ? ? u o o ? ? a? ?n ? ? ? ? ?n ? o a? o ? . . = `? ? rl rl N m m N N cry ? ri 01 ? ? j 0 o ? rn m N o ?n n ? o w co n rn N O N w `'` 00 o tp ? f? N Ol m N ?rl u1 ? Ol n ? o? N o N ? l0 o0 O ? m d' l? ?D l0 oo to O ? a o 0 o O o 0 0 ? ? ? N N N N m a ? o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ? Q ? 'v oa n n o ? ? n ? ? ? m ?n N ? 01 n ?11 o ? ,} ?n ? m o o ? n ? rv u i oo ? ? ? N ? ? ?n ? m p Q" m n ?, ? N N m ? d' ? oa ? ? ? ? a z Q ? ? ? ? oo rn o ? rv m `r' m ? `" ? ?n ? ? ? n m oo m r? N rv N N m m m m m ?D m 4D m lD ?D 1D ? lD t0 CG cD tD ?G lD l0 ? ? ? ° ? d ? d o a ? a o U o c ? ? Y ? c E ? ° o ? +? ?, 0 ? o d ? o 0 0 a? m ? a V1 p ri m ?? ?+ o N ? o ? ? N ?, ? ?? ? a ? ? o ? ? ? ? c ? a? n? ? C ? C .? N N co a a m Permit No. (?o be provided by DWQ) ? ?4 ?? ?? ? ? "i ??? ? ? STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT this form must be filled out, printed and submitted. The Required hems Checklist (Part 111) must be printed, felled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Dixie River Road Roadway Project Contract person Rob Hume • Kimley-Hom and Associates, Inc. Phone number X104) 954-1462 Doke 112012010 Drainage area number DA-1 II. DESIGN INFORMATION Site Characteristics Drainage area 235,660 ? Impervious area, post-development 109,336 fkz °/o impervious 46.40 °/Q Design rainfall depth 1.0 in 5tarage Volume: Non?SA Waters Minimum volume required Volume provided 9,200 ft3 OK 10,134 ft3 QK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5"runoff volume Pre?evelopment 1 •yr, 24-hr runoff Post-developmenk 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the preipost control of the 1yr 24hr storm peak f<ow required? 1-yr, 24•hrrainfall depth Rational C,pre-development Rational C, post?evelopment Rainfall intensity:1-yr, 24-hr storm Pre-development 1 •yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow PrelPost 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanaut, top elevation bottom of pond Sediment cleanauk, bottom elevation Sediment storage provided Is there additional volume stored above the statre-required temp, pool? Elevation of the top of the additional volume ft? _ft3 ft3 0 ft3 ft3 Y ?Y or Nj 2.6 in 0.42 junitless) 0,72 ?unitless? 0.12 inlhr Ct? 2.43 ft3lsec 13.36 ft3lsec 10,93 ft3lsec 635.10 fmsl 634,00 fmsl 634.00 fmsl fi34.50 fmsl 633.50 fmsl Data not needed for calculation option #1, but OK if provided, 621.00 fmsl 62fi.04 fmsl Data not needed for calculation option #1, but OK if provided. 1,40 ft N (Y ar Ny ?fmsl Form SW4a1-Wet Detention Basin-Rev,7-8113109 Parts i & II. Design Summary, Page 1 of 2 Ptsrmil N?. (to he provided by DWQ) II, DEIQN INFORMATION Surface Areas Area, temporary pool 10,625 f#? Area REQUIRED, permanent pool 6,834 ftz SArDA ratio 2.90 (unikless) Area PROVIDED, permanent pool, A??m_?i 1,800 ? OK Area, bottom of 10ft vegetated shelf, A?°? ?1°,r 5,872 ? Area, sediment cleanout, kop elevation ?boktom of pond), A?,_?,? 737 f? Volumes Volume, temporary pool Volume, permanent pool, V?,„_F?, Volume, forebay sum of forebays if more than one forebay? Forebay °/° of permanent pool volume SAlDA Table Data Design TSS removal Coastal SA1DA Table Used? MountainlPiedmonk SA1DATable Used? SA1DA ratio Average depth fused in SA1DA kabley: Calculation option 1 used? See Figure 10-2b) Volume, permanent pool, V?e???i Area provided, permanent pool, ApeRT_? Average depth calculated Average depth used in SAIDA, day, Round ko nearest 0,5ft? Calculation option 2 used? See Figure 10-2b? Area provided, permanent pool, A??,_?? Area, bottom of 10ft vegetated shelf, A?? ?,f Area, sediment cleanouk, kop elevation (bottom of pond), A??_?nd "Depth" distance btw bottom of 10ft shelf and top of sediment Average depth calculated Average depth used in SA1DA, day, Round to nearest 0,5fty Drawdown Calculations Drawdown through orifice? Diameter of orifice cif circulars Area of orifice (ifnon-circular) Coefficient of discharge ?Co? Driving head (H°J Drawdown through weir? Weir type Coefficient of discharge ?Cw? Length of weir ?L? Driving head ?Hy Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies Form SW4a1-Wet Detention Basin-Rev.7-8113109 10,134 ft3 Olt 23,461 ft3 4,74fi ft3 20.2°/° °/° DK 90 N ?Y or N) Y ?Y or N? 2,90 (unitlessJ Y (Y or N? 23,461 ft3 OK 1,800 fr2 OK 3.10 ft Check calculation. Need 3 ft min. 3.0 ft insufficient, Gheck calculation t~t ?Y or Ny ft? ft? ft? ft ft fk Y (Y or N) 1.50 in ?in? 060 ?unitlessy 0.35 ft N ?YarN) ?unitless? ?unitless? ft ft 2.43 ft3lsec OK 13,36 ft3lsec lnsufficienkposc-development peak flow, 0.04 ft3lsec 3.40 days OK, draws down in 2-5 days. OK, drawdown time is correct. 3 ;1 OK 10 ?1 OK 10.0 ft OK 3 :1 OK 3.2 :1 OK Y ?Y or N) OK 1.0 ft OK rd ?Y or Ny OK Y ?Y or N? DK Y ?Y or Ny OK 24-HOUR EMERGENCY PUMP Parts I, 8? II Design Summary, Page 2 of 2 Permi# e? (to be provided by DWQ) I'II? REQUIRED ITEMS CHECKLIST Please indicate the page ar plan sheet numbers where the supporting documentation can be found, An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the fallowing design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Paget P Ian Initials Sheet No. ? . ? 1. Plans ?1" - 50' ar larger of the entire site showing; - Design at ultimate build-out, -Off site drainage cif applicable, -Delineated drainage basins include Rational C coefficient per basin, -Basin dimensions, -Pretreatment system, -High flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way BROW}, -Overflow device, and - Boundaries of drainage easement. ?_ 2. Partial plan ?1" = 30' ar larger and details far the wet detention basin showing; -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, -Basin crass-section, -Vegetation specification for planting shelf, and -Filter strip. D 3, Section view of the wet detention basin 1" = 20' ar lar er shawin ? 9? 9 -Side slopes, 3:1 ar lower, -Pretreatment and treatment areas, and -Inlet and outlet structures. 4. If the basin is used for sediment and erasion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin, ?? ?? for overall and and far fareba 5. A table of elevat?ans, areas, Incremental volumes & accumulated volumes p y, to verify volume provided. t til th di un e men 5, A construction sequence that shows haw the wet detention basin will be protected from se entire drainage area is stabilized, ?? 1. The supporting calculations. ? 8, A copy of the signed and notarized operation and maintenance ?0&M? agreement. ? 9. A copy of the deed restrictions cif required. ? t C ? y oun 10. A sails report that is based upon an actual field investigation, sail borings, and infiltration tests, sail maps are not an acceptable source of sails information. Form SW401-Wet Detention Basin-Rev.7-8113!09 Part Ill. Required hems Checklist, Page 1 of 1 ? IGmleyH°rn ? and Assodales, Inc. 1NET DETENTIQN BASIN 2 Project Information Site Information Project Name: Dixie River Road KHA Project #: 015016055 Designed by: KIST Date: 1141201 D Revised by: Date: Revised by: Date: Sub Area Location: Drains a Area 2 Drainage Area FDA} = 19.79 _ Acres Impervious Area CIA} = 14.29 Acres Percent Impervious ?I} = 72.2 °/° Required Surface Area Permanent Pool Depth: 4.4 ft SA1DA = 3.16 X90°/° TSS Removal via Pond} Min Req'd Surface Area = 27413 sf fat Permanent Pool} Required Storage Volume: Design Storm = 1 inch Project Does Not Drain to SA waters} Determine Rv Value = D.05 + .009 ?l} = O.10 inlin Storage Volume Required = 50277 cf above Permanent Pool Elevations Area ?s.f.} Bank Elevation = 657.00 ft Top of Pond Elevation = 657.00 ft Temporary Pool Elevation = 653.40 ft Permanent Pool Elevation = 652.00 ft Shelf Beginning Elevation = 651.50 ft Forebay 1Neir = fi52.00 ft Shelf Ending Elevation = 652.50 ft Sediment Cleanout Elevation = fi45.00 ft Bottom Elevation = 644.00 ft 1Net Basin AreaslVolumes Area @ Top of Temporary Pool = 39322 sf Area @ Top of Permanent Pool = 32706 sf Volume of Temporary Storage = 50420 cf Side Slopes of Pond = 3 :1 Side Slopes of Shelf = 10 :1 Side Slopes of Pond ?belowshelf} = 3 :1 Is Permanent Pool Surface Area Sufficient ?yeslno}? Volume of Storage Provided 50420 cf Total Volume Sufficient ?yeslno}? Yes orifice Size = 350 inches Drawdown Time = 2.6 days 39,322 32,706 Elevation = 653.40 ) Elevation = 652.00 } Yes ? 32706 ? 27413 } sf ? ? ?imfeyHam ? and Associates, Inc. V11ET DETENTION BAS1N 2 Project Information Project Name: Dixie River Road KHA Project #: 01 X016055 Designed by: KRT Date: Revised by: Date: Revised by: Date: Site Information Sub Area Location: Draina a Area 2 Drainage Area FDA} = 19.79 Acres Impervious Area CIA} = 14.29 Acres Percent Impervious ?I} = 72.2 % Drainage Area} Orifice Sizing Q2 Days = 0.2918 cfs ?Flowrate required fora 2 day drawdown} Q5 Days = 0.1161 cfs ?Flowrate required fora 5 day drawdown} Orifice Size = 3.50 in Diameter} Q Qrifice = 0.208 cfs Drawdown Tirne = 2.8 days less than 5 days ?yeslno} ? YES greater than 2 days ?yeslno} ? YES Orifice Equation: Q =cA9?J?2gh? Qz ? Q ? ?? c = 0.6 A9= Area of Pipe = n/4Dz g =gravity = 32.2 ft/s2 h =orifice head = 1/3 (TPE-PPE-1/2D) TPE =Temporary Pool Elevation PPE =Permanent Pool Elevation D =Diameter 1 !412010 ?:n??? NCDENR ANTIFLOATATIDN DEVICE DESIGN CALCULATIONS per NCDENR Manual Project Information Project Name: Dixie River Road KHA Project #: 015016055 Designed by: KRX Date: 11412009 Revised by. Date: Revised by, Date; Revised by: Date: Pond 2 Drainage Area Information: Drainage Area {ac} _ Flow (Q25} {cfs} = 10 9? Storage Dimensions: Basin Side Slopes { X :1 } = 3 0 (3.1 max side slopes} Storage Depth "R" (ft} = 7 0 Tap of Basin Efe?+atiorr Temporary Pool Eleyatior? Permanent Poal Elevation Bottom of Basin fileva#fon EI??? {fly Area 4SF? C?urcu3at?ve l?olur?e ?DF1 .? ?'1 _ f X4159 Sizing of Antiflotation Block: Control Structure Length {in} = 4. Control Structure Width {in} = 3t< Riser Area {sfy = 12.00 {Check riser geometry vs. area equation} Volume of Water Displaced {cf} = 96.0 Weight of Water Displaced {Ib} = 5,990 Min. Required Weight of Anchor Block {Ib} = fi,5$9 {1.1 factor of safety} Anchor Size: Width {If} = 4.0 Length {If} = 4.0 Height {If} = 5,00 Weight of Anchor {Ib} = 7,008 O.K. > Minimum Required Weight Sizing of Emergency Spillway: QZS {cfs} = 40,9 Qspillway {Cf5} = 10.9 {Riser ignored} Water Depth Over Spillway {ft} = 0.5 Spillway Length {ft} = 20.0 {10 ft minimum spillway length, Cw=2.7} Spillway Crest Elevation {ft} = fi55.6 {1 ft min. above sediment storage depth) Freeboard eft} = 1.Ofi {1 ft minimum} Page 1 of 1 y ?.? w'• ?? 11 u Q u f0 GJ 3 0 c? ? ? N t0 ? O ?? .X °? ? o 0 0 N N N ? ? ? ? ? Y C 0 ,_ ? ? ? ?. ? ? v??? ?oz•o ?,?? ? ? d ? •? ,? ? 'p Q ? ? ai .?dYptYOc 0 a N C ?o t0 •o c 0 a? ? u ? ?? o O 1 0 m ? N ? n ? uv1 0?0 0?0 O m O Q 0 N 1!1 00 N I? N u1 01 N 01 ? rl rl N N N m N ? lD O m m N m lD N r1 ?-? ? ? o o m rn ? o ° m rn ? `? N N c'r1 d' ? u1 N t0 lp 0 ? In ln n rn N n rn ? ? o ro?. ? rn o N ln v ul ? o rn o0 ? u ct ? ?a n o0 0 ?+ m ? d? ? o O o 0 0 ? ? ? ? ? ? W v o 0 0 0 0 0 0 0 0 0 J 4 ?o.? ? m ? ul ? m ? ?o ? ? ? ? a? m oo ? n ? ? a1 ? ao ??. N o1 ? ? ? n m o n ? ? oa ? Q`? ?I 1?v N m m ? ul ln ? ? ? Q - W ? -- N .111 111 111 ?L ? ? ? d' ? ? ? 111 111 ? u1 N ? l?D ? ?D ?D lD l0 tG lQ ? ?D ? 7 ° c o o ? ? o a ? a o v U c • v ? ? ? c ?o `^ °' o *' E ? ? m ? a I \° e 0 0 0 ? ? N O O ?Ill1 N ? a? a? a? ? o ? o ? o +? ? 7 ? in ? c ?' r? ? r? ? E a L L L p? N p IL a u. ? ? oo ? ? ? ? ? n ? rn ? ? "1 N ° m ? ? m v o iA N u oo ? oo ? ? oo o O o 1 v a o u ? Q O V o m r? ? ni rv m ? rn ? +? I,n n m rl ? ? rl N m 1111 n 01 o rl rl ? fl N ri tt rl l? fl 00 ri N N n N N m N m ? DO u1 m 0o 01 a1 l0 0 N 0 N 0o O rn N oa O rn N o1 o0 o u1 rn m ? 111 n m rn ?? o v oo ln m m m m rn ? m m In v ? N .? •• -- o N ? ?D 00 0 o ni m ? 111 ? N u'1 00 ? ? r1 rl ri ri rl N r1 r-I rl ri rl N ? ? ? 0 ?- 111 O ?D N o n lD N O n 00 ? n rI N 111 N ? .? m 0 DO Q1 N iD m N f? rl f? n N rl tiD N O v u 01 m cD O u1 01 ? Q1 ? O N n O ? O n ? Q :? rl N N m m m ? ? u1 l0 l? 00 O1 Q1 O + O i r1 i ? o v o o o o v o o 0 0 0 o o ? ? ? J oa a1 n rI rI N N 01 0 00 ao N lD Q1 v ? ? --• ? r1 01 lG m 00 N ? r1 .--1 ? ,? N 01 N N ?D Q ? N -? ? O o 1D ? ? m m u1 N n m rn ? ? u'1 N N ?o m n N ?0 m rn 01 o 00 m n ?a l0 rn O Q ? rl rl ri f-I rl ri N N N N [?? m ? ? ? ? Q Z a ? ? ? f N !' m I f1 Il? ? V1 ? ? ? ? ? ? ? O ? ?o ? ?a ? a ? 111 ?a ? I. 1 ? ? 1 1 ? ? . ? ? ?a w ? o `? 0 0 c c a c ro v ? o a w ? o a ? c o ro a o u o c cn ? m ? c ? ? ° o w ° ? ° E o ? a o o H ? ° ? m a ? m n ? I I N O m o? ?i ? ?? a? ? ii ? as o a ? o c c v a? a, ? C C ? ? c ? E .N a? v r? a. a m Permit No. (ta be provided by DWQJ ? ? ? ?? ? ? ?? ? ? STORMWATER MANAGEMENT PERMITAPPLICATION FDRM 401 CERTIFICATION APPLICATION FDRM WET DETENTION BASIN SUPPLEMENT This farm must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I, PROJECT INFORMATION Project name Dixie River Road Roadway Project Contact person Rob Hume Kimley Hom and Associates, Inc, Phone number (104y 954-7462 Date ? 21812009 Drainage area number DA-2 II? ?E?CN INFORI?MATION Site Characteristics Drainage area 862,052 f? Impervious area, past?evelapment 622,472 f? °I° impervious 72,21 °I° Design rainfall depth _ 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre?evelopment 1-yr, 24-hr runoff Past-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flaw Calculations Is the prelpost control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre?evelopment Rational C,post-development Rainfall intensiky:l-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow PrelPast 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Battam of 10ft vegetated shelf elevation Sediment cleanout, tap elevation ?bottam of panel) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the skate-required temp, pool? Elevation of the top of the additional volume 50,300 ft3 OK 50,420 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 " ft3 0 ft3 ft3 Y (Y or N? 2.fi in 0 20 ?unitlessj 0.76 ?unitlessj 0.12 inlhr 0K 0-$4 ft3lsec 51.23 ft3lsec 50.39 ft3lsec 653.40 fmsl 652.00 fmsi _ 652.00 fmsl 653.50 fmsl 652.50 fmsl Data not needed for calculation option #1, but 0K if provided fi45.00 fmsi 644.04 fmsl Data not needed for calculation option #1, but OK if provided. 1.04 ft N1 ?Y or N) fmsi Farm SW401-Wet Detention Basin-Rev.7-8113f09 Parts I, ? il. Design Summary, Page 1 of 2 Permit Na. II, ??SIN ?I???ATrt?N Surface Areas (1o be provided by DWQJ Area, temporary pool 39,322 ft? Area REQUIRED, permanent pool 27,413 ft? SAIDA ratio 3.18 (unitless} Area PROVIDED, permanent pool, A?rm_?, 32,706 ft? OK Area, bottom of 10ft vegetated shelf, A?°r_?1e1f 28,636 f? Area, sediment cleanaut, top elevation bottom of pond}, A?,_?,? 10,018 f? Volumes Volume, temporary pool 50,420 ft3 Old Volume, permanent pool, V??,_P?, 145,023 ft3 Volume, forebay sum of forebays if more than one forebay) 29,019 ft3 Forebay °/° of permanent pool volume 20,0°?° °?° OK SAIDA Table Data Design TS5 removal 90 °/° Coastal SAIDA Table Used? N (Y or N} MountainlPietlmant SAIDATable Used? Y ?Y or N} SAIDA ratio 3.18 ?unitlessy Average depth fused in SAIDA table}: Calculation option 1 used? See Figure 10-2b} Y _ ?Y ar N} Volume, permanent pool, Vpef??, 145,023 ? OK Area provided, permanent pool, Aperm_pool 32;06 OK Average depth calculated 4.43 ft Check calculation, Need 3 ft min. Average depth used in SAIDA, day, Round to nearest 0.5ft} 4,4 ft insufficient Check calculation, Calculation option 2 used? ?5ee Figure 10-2b} N ?Y or N} Area provided, permanent pool, Ape?,_?, ftz Area, bottom of 10ft vegetated shelf, A?,_?ii f ? Area, sediment cleanaut, top elevation bottom of pond), A??_??? ft2 "Depth" ?tlistance blw bottom of 10ft shelf and top of sediment} ft Average depth calculated ft Average depth used in SAIDA, day, (Round to nearest 0.5ft} ft Drawdown Calculations Drawdown through orifice? Y ?Y ar N} Diameter of onfice (if circular} 3,50 in Area of orifice cif-non-circular} in2 Coefficient of discharge (Co} 0,60 ?unitless} Driving head ?H°} 0.42 ft Drawdown through weir? ?Y or N} Weir kype ?unitless} Coefficient of discharge ?Cy,} ?unitless} Length of weir (L} ft Driving head ?H} ft Pre-development 1-yr, 24-hr peak flow 0,83 ft3lsec OK Post-development 1-yr, 24-hr peak flow 51.23 ft3lsec Insufficient post-development peak flow, Storage volume discharge rate (through discharge orifce ar weir} _ 0.21 ft3lsec Storage volume drawdown time 2.80 days OK, draws down in 2-5 days. OK, drawdown time is correct, Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width raga Trash rack for overflow &onfice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies Form SW4a1-Wet Detention Basin-Rev.7-9113109 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3,3.1 OK Y ?Y or N} OK 1.3 ft OK N (Y ar N} OK Y ?Y or N} OK Y (Y or N} OK 24 HOUR EMERGENCY PUMP Parts 1. & II. Design Summary, Page 2 of 2 Permit No. {fo be provided by DWQJ III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the fallowing design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page! Plan Initials Sheet No. ?_ 1. Plans ?1" - 50' or larger of the entire site showing: - Design at ultimate build-out, - Off site drainage cif applicable), -Delineated drainage basins include Rational C coefFcient per basin, -Basin dimensions, -Pretreatment system, -High flow bypass system, -Maintenance access, - Proposed drainage easement and public right of way BROW}, -Overflow device, and - Boundaries of drainage easement. ? ? 2. Partial plan ?1" = 30' or [arger? and details for the wet detention basin showing: .. -Outlet structure with trash rack ar slmllar, -Maintenance access, -Permanent pool dimensions, - Farebay and main pond with hardened emergency spillway, -Basin cross-section, -Vegetation specification for planting shelf, and - Filter strip. 3. Section view afthe wet detention basin ?1" = 2a' ar larger showing: -Side slopes, 3:1 orlawer, -Pretreatment and treatment areas, and -Inlet and outlet structures. 4. If the basin is used for sediment and erosion control during construction, clean auk of the basin is specified on the plans prior to use as a wet detention basin. ?? 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for farebay, to verify volume provided. 6. A construction sequence that shaves haw the wet detention basin will be protected from sediment until the entire drainage area is stabilized. ?''t? 7. The su ortin calculations. pP g 8, A copy of the signed and notarized operation and maintenance ?0&M? agreement, g. A apy ?f the deed restd?tio?s cif required. ?? 1g, A sbils report that is based open an actual field investigation, sail borings, and infiltration tests. County sail maps are not a? acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.1-8113109 Part III, Required Items Checklist, Page 1 0l' 1 Dixie River Road Erosion Control I?irnle ¢Horn and ssaciates, Inc. Charlotte, North Carolina Date: 9114200 KHA Project #: 015016055 Prepared by: KRT Checked by: RIP RAP APRON CALCULATIQNS Per NCDENR Design Manual Structure: Apron 1 Pipe Diameter ?in?: 18 Slope ?°/o}: 0 79 OA079 Manning ?n?: 0.013 Radius din): 9 Pipe Area ?sf): 1.17 Wekted Perimeter Flaw Area Hydraulic Flaw Velocity Depth Theta (ft} ?sf} Radius Flow GPD ?CFS fps Flov?ing Full: 18.0 6.283 4.712 1.787 0.315 6,050,397 9.36 5.30 10-year flow: 14,13 4.355 3.266 1.488 0.456 5,801,932 8.98 6.03 Discharge ?Q10} = 8.98 Pips Diameter din} = 18 450 = 0.9 Figure S.O6a Design Conditions = Assume Minimum Tailwater l?Vidth at Pipe Outlet'Do' ?ft? = 4.5 Length of Apron'La' eft} = 10 Figure 8,06a Widt11 at End of Apron'W' eft} = 14.5 Min. Stone Depth din} = 24.3 Stone Class = Class B RIP RAP APRON CALCULATIONS Per NCDENR Design Manual Structure: Apron 2 Pipe Diameter (in}; ? ?? Slope ?%?: ? 5 O.Q'196 Manning (n?: !; ?7?;? Radius (ir??; 9 Pipe Area Est}: 1,7 Vetted P+?rir?eter F??w Area I+fdruli? Flow ?lelocity Depth rthet? tt sf? Radius Ffow ?GPD} CF} fps} Flowing Full: 18.4.. - 6.283 4.712 1,7?a?` 0.375 9,530,120 14.7'5 8.34 10-year flow from ICPR: `?? .?? .. ?... 3.197 2.398 0.915 0.38 4,990,534 1.72 8.44 Discharge ?Q10} _ ?'.?' Pipe Diameter din} = 18 450 = 0.? Figure 8?06a Design Conditions = Assu+a tin?murn T?iiwater Width at Pipe Outlet'Do' eft} _ ?.5 Longthw of Apron'La' eft) = 1 ?? Figure 8.08a Width at End of Apron'W' eft} = 14.:5 Min, Storrs C?epth din} = 24,3 Sloane Class = ???t?? k ? ? ? iUmleyHam t I A i a es, nc. ssoc ? _ _ _ and Pre vs. Post Runoff Analysis Composite Curve Number RCN) Project Information Project Name: Dixie River Road KHA Project #: X01 X016055 Designed by, i{RT Date: 11412010 _ Revised by: Date; Revised by: Date; - omRasite Drainage Area Drainage CoverlSoi! Name Hydrologic Soil Product of Curve Number Name Location Type} Cover Descriptionx Group Curve # (CNy*? Area lac} CN x area (CND PRE-DEVELOPMENT - Monacan, Woods _ DA-1 OUTFACE 1 i Mecklenburg _ ' i n Good Condit o C 70 1 fit 113 70 Meadow ? Davidson Good Condition B 71 ? 2 65 ' 188 71 I 4.26 ? 301 70.6 Mecklenburg, Woods ? ° DA-2 OUTFACE 2 Wilkes Good Condition ? C 70 3 70 I 259 70 Waads Cecil Good Condilion B 55 ! 8.10 ? 446 55 11.80 ? 705 59.7 Total Pre?leveloprnent Area = 16.06 POST DEVELOPMENT i DA-1 POND 1 Impervious ? 96 _ _ ? 2 51 ? 246 98 Mecklenburg, ? ?_ Monacan, Wilkes Open Space - Fair Condition C 79 2.29 _ 181 79 Davidson Open Space -Fair Condition ? B ? 69 0.61 42 69 y I ? 5.41 ? 468.98 i 86.69 DA-1 FUND} OUTFACE 1 Monacan Open Space -Fair Condilion C 79 0.17 13 _ 79 . i ? 0.17 i 13.43 79.00 +?? DA-2 POND 2 - ? Mecklenburg, Monacan, Wilkes p Im erviaus 9 p _ c Open Space -Good Condition -.. ? _ C ? ? ? 98 74 s 14.29 0.72 140D _ 53 I 98 _ 74 Cecil Open Space -Good Condition B ? 61 4.78 ° 292 61 ? - 19.19 1745.2$ ? 88.19 -2 UND OUTFACE 2 ? DA } Cecit ? Open Space -Good Condition B I fit 1.08 ? fi6 61 1.08 65.88 61.00 Total Past-tle?relop m?nt Area = 26.45 k Cover Descriptions per TR-55 Manual ?* From TR-55 Manual, Table 2-2 a & c ??` Assumed approximately 90°/° impervious for un developed acreage to be develo ped. K;ICSE LDEV1015016 City of CharlottelD55 Dixie River Road Stormwater ManagementlCalcslStormwater Calculations_2009-09-17.x1s 1 of 1 `a? 11 u ?i . i E' mE ]? F F N ? ?I R ? U N O1 a ?? U ? N ? 7 = f6 L L Q? ? r?".++ v ?? ^? W ."ti C 0 D U LL ? 4- ? ? O ? N n? ya ?? tl ? H .?' C R 0 C ++ Q ro 0 ? C v ? 0 N V ? N N L (? w ? ? ?= 3 r w. c cc m '? a ??U 0 D am $ ? f+ ? N ? a a 0 O r N J ? J ? r O N ? d7 ? ? s C 0 a U lQ ?? r D l0 r N N ? 7 D U D '? 3 ° ? - LL 0 Q1 ? a h m?t? ?a E? ?? ? ? N N ? ¢ ? 0 = ? ? ? ? J oaY ro ? ? L 91 N ++ m ?O L a ? roz {V r ?Y ? ? ? ti 47 ? ? ? N N ? I v7 II .? C ?? ?; C ? I V uy II .-. C E H C ? a:? ? ? +, ? V - k ? w 0 m E s ? rs ? ? i a, c ? I ? ? o ° D O G j E ?' D M a ? a ? ? o? m c t ?? ? U - ? a1 ? .?. d C ? N C U ,? ? v ?J ? ? N ? m C ? ? r1 C CGG ? ? U 0 ? .? a r 0 w ? r I ? I (V d v 0 N ?-. m J C h O O 0 m c m v 0. 0 a U N Ol O v D U u r 3 rn o ? ? ? `o Of ? m 'cv? `°?? ? m '? lA N N ? C ? ?E Ef9o r °Uli ??? ? O ? N x 0 0 0 N 1 c 0 .? U l? U d m Ql I? E L O ++ N 0 a? O u? 0 a? 0 `m L U a U co O O W 0 J wl U Y ?? ?? ?1??,11?I?t ???? ? ??f?? ?? ?. ?f???h ?n? ?c??r??? p??ram ?r P?aa?d ? ??. Pr??ari ? 4???lr??l-Ir??r? ?r?? ?E?a, Ire., i rip????? ????L ? .a ?'• Hytl? ?.?? ?I? ?1 ??? F°??CI? rf?w??? ?lut?? LLB Pond ? Type 1124-hr T year, 24 hour storm Rainfall=2.58" Prepared by Kimsey-Horn and Associates, Inc. Printed 2/2212010 HydroCAD®9.00 sin 05123 ©2009 HydroCAD Software Solutions LLC Pa e 2 Summary for Subcatchment ?S: Pre?iev DA-? Runoff - 2.43 cfs ? 12.10 hrs, Volume= 0.188 af, Depths 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area ac CN Descri Lion 4.60 ?1 4.260 ? 00.00°/o Pervious Area Tc Length Slope Velocity Capacity Description min feet ft1ft ftlsec cfs 15.5 Direct Entry, From spreadsheet Subcatchment ? S: Pre?iev DA-? Hydrograph 2.4 ifs ? T? ? i?? e r a? w l ?o? Sorn? ? .e • ? • ? . .. ? }V} Y i 1 } ? F ? }} + f ? R? { ' ? ? r i v . R??ofA ? ; ?: rea?R c a ?? a? ^? { • f ` 9 ,? _ 1 ? . i t 1 Rio oi?n?:?? ? . . '? i ?f De o.?, fl??o ? - i i. ?-- Tc=? ? rrt?i? t ??'? ? i - ? :. . I ?. ? i ? ? T {$ 9 10 11 12 1?3 14 1p? 1? 1? 1? 1 ? ?1 ? ? Time ?houfs? Pond 1 Type 1! 24-l?r 1 year, 24 hour storm Rainfall=2.5S" Prepared by Kimley-Horn and Associates, Inc. Printed 212212010 H?r?oCAD 9.?J9 s?r? 0512 99 H??oCAD aftu??are clu#?o?s LLB Pale 3 Summary for Subcatchment 2S: Post-dev DA-1 [49] Hint: Tc?2dt may require smaller dt Runoff - 13.36 cfs ? 11.96 hrs, Volume= 0.621 af, Depths 1.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area ?ac? CN Description 5.410 87 5.410 100.00°/o Pervious Area Tc Length Slope Velocity Capacity Description ?min? Meet} ?ft1ft? ?ftlsec ?cfs? ,_ 5.0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-1 Hydrograph 14 ? Cf? ij # ?qi .......P..... P , ?" v i 12? . t ? ?. ?....:? - hour o??" p ; P . , . *' 11? P ¦ ti ., .q.. ..?.......?.. ...,..,. II I P L i ? R ? 10. o i ? ? - 6 ` ? ?o :. t P P N . F P ? B- P i `/ ? S. pia ??? ?.... .'tr •. •.?j ?. 1 ? Pi . 3 P ? - ?? v ? ? P _ . ... ;: .;,........m.....???...,.???., r '? R?r?o?Dt??? LL P . P ? • . I i ? ? - n..}1 r.?ne . • ? _ 1 b e , ? P JJ . a ? ? ? Y # ?4 t S { ? * ? ?•n - ? . ? . i 0 Y ` + b 1/? * . ¦ .T 7 F s fin; P . - - ?_ 0 1 3 ? ? ? ? ? 10 11 12 13 14 '15 1? ?7 ?? 1J 0 1 ? ? ?4 Time (hours) Pond ? hype 1124-hr 1 year, 24 hour storm Rarrrfa11=2.58" Prepared by Kimley-Horn and Associates, lnc. Printed 212212010 H droCAD®9.00 stn 05123 n 2D09 H droCAD Software Solutions LLC Pa e 4 Summary for Subcatchment 9S: Post-Dev DA-? ?UND? [49] Hint: Tc<2dt may require smaller dt Runoff - 0.21 cfs @ 11.96 hrs, Volume= 0.013 af, Depths 0.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area ac CN Descri? tion 0.110 19 0.170 100.00°/o Pervious Area Tc Length Slope Velocity Capacity Description min feet ftlft ftlsec cfs 5.0 Direct Entry, Subcatchment 9S: Post-Dev DA-? ?UND? Hydrograph . ?,:.. : ?? ? 0,7 Oft M I V Y a 4 ..?. ? .,?, s. .. _ ???: o.? ? . .? . - o r o? a.2? -. 1 . i ii ., •d ?i o fie..: Eie i? '? a i a . ?.? ? ? ? M . f ? G Oe2° k - ? ? x 0.18 ?? . o VIr??-o??1 ? f ,? 0.10.. . ,, ? ., 0,12- ? ? ? ? ? ..r ..,......i------?I.......,. . a - . . , ? - ? ...;. a .?„ ?. t. r ? ... V F? ? N? 9 o.a$ - a i ? ? - .. ` .., . ..` 1J.OVs. ? 1 i ? . i - a i * aii _. .6 yI T I I . e ? ? i. ? i 0.04 ? LLL i ? ? - a f 11I { 1 0.02.. ? 2 ? 1 t __ h 0 ? 1 2 .3 ? 6 ?' ? 10 .11 12 13 14 15 1 17 10 10 20 . ? 1 2 23 2? Time hours) Pond 1 Type ?! 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 2!22!2010 1-IbroD 9.00 sln 05123 ©2009 I?dreCD of?ware Solutions LLB P Summary for Pond 3P: Dixie Wet Pond 1 This pond has been sized based on a future wall to be installed by others. Due to this, the custom stage data that appears in these calculations is smaller than the actual pond grading. When the wall is installed above temporary pool on the back side of the pond, the pond will be sufficient. Inflow Area = 5.410 ac, 0.00% Impervious, Inflow Depth ? 1.38" for 1 year, 24 hour storm event Inflow = 13.36 cfs a? 11.96 hrs, Volume= 0.621 of Outflow = 1.09 cfs @ 12.52 hrs, Volume= 0.343 af, Atten= 92°/a, Lag= 33.6 min Primary = 1.09 cfs @ 12.52 hrs, Volume= 0.343 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24,00 hrs, dt= 0.05 hrs Peak Elev= 635.45' @ 12.52 hrs Surf.Area=10,988 sf Storage=14,312 cf Plug-Flow detention time= 242.4 min calculated for 0.343 of X55% of inflow} Center-of-Mass det. time=126.2 min ? 949.8 - 823.7 } Volume Invert Avail.Stora a Stora a Descri tion #1 634.00' 45,482 cf Custom Stage Data ?Prismatic? Listed below ?Recalc} Elevation Surf.Area Inc.Store Cum.Store feet s -ft cubic-feet cubic-feet 634.00 1,800 0 0 634.50 9,888 4,422 4,422 635.00 10,486 5,094 9,516 636.00 11,596 11,041 20,551 637.00 ? 2,451 12,021 32,583 638.00 13,340 12,899 45,482 Device Ro?.,tin invert Outlet Devices #1 Primary 633.30" 18.0" Round Culvert L= 38.0' RCP, square edge headwall, Ke= 0.500 Outlet Invert= 633.00' S= 0.0079'1' Cc= 0.900 n= 0.013 #2 Device 1 634.00' 1.5" Vert. OrificelGrate C= 0.600 #3 Device 1 635.20' 30.0" W x 10.0" H Vert. OrificelGrate C= 0.600 #4 Device 1 636.80' 14.0' long x 0.5' breadth Top of Grate Head feet} 0.20 0.40 0.60 0.80 1.00 Coef. English} 2.80 2.92 3.08 3.30 3.32 #5 Secondary 636.80' 45.0' long x22.0' breadth Emergency Spillway Head feet} 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. English} 2.68 2.10 2.10 2.64 2.63 2.64 2.64 2.63 Prirr?r OutFlow Max=1.09 cfs @ 12.52 hrs HW=635.45' Free Discharge} ?=Culvert Passes 1.09 cfs of 9.34 cfs potential flow} 2=?rificelGrate Orifice Controls 0.07 cfs @ 5.68 fps} 3=Ori?celGrate Orifice Controls 1.02 cfs @ 1.61 fps} -Top of Grate ? Controls O.OD cfs} Secondary OutFlow Max=0.00 cfs @ 0.00 hrs Hvv=634.00' Free Discharge} t-5=Emergency Spillway ? Controls 0,00 cfs} Pond 1 Type !! 24-hr ? year, 24 ?rour storm Rar'nfall=2.58" Prepared by Kirnley-Horn and Associates, Inc. Printed 212212010 HydroCAD®9100 stn 05123 ©2Q09 H droCAD Software Solutions LLC Pace 66 Pond 3P. Dixie Wet Pond 1 Hydrograph Ir?ifaw ,i+r etM ik-? #? jai !Itii .i .Y?F ???{lr ll?flo ? ???????? .y .. ? 1 • +j i? ? ,i. ..s.- .?.. ..i.. •aa.. t : : ? ?`? 1 ?o?? . I 11. 1 - 1 ? e F F i • ° N •?• •FF R • ? _ ? • ! ? I I ? 1 ,--? T ki{ 1 I} 9?? ? i . I Rp e ? E - I 1 ? k • I Y ? ? i Y 1 ?!? I .1-? i.i ?r? is ly a 9i?s ?r..?? •? - ; .. y .? ?a . ?.. ., '... ..aa?i aLrl yi??..?#•f .- . Y? n !-? a 1 1 ? ? T TTR t ? 1 1 i 1 1 ?6 ?? # 1 k ? ? 1 ?., ? - . ?• ? ? .? ?? . .. +ir ,, r .L r r A?: f UIF?J? 4?p? ?r ? . ??? -. - ? 1 3 4 7 8 9 ? 10 11-.1,? 13 14 15 ? 1? 16 1? !? 1 ?? Time (hours Pond Type 1124-nr 1 year, 24 hour storm Rainfa11=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 212212010 HydroCAD®9.00 sln 05123 0 2009 H droCAD Software Solutions LLC ? e 7 Stage-Discharge for Pond 3P: Dixie 111fet Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 634.00 0.00 0.00 0.00 634.05 0.00 0.00 0.00 634.10 0.01 0.01 0.00 634.15 0.02 0.02 0.00 634.20 0.02 0.02 0.00 634.25 0.03 0.03 0.00 634.30 0.03 0.03 0.00 634.35 0.03 0.03 0.00 634.40 0.03 0.03 0.00 634.45 0.04 0.04 0.00 634.50 0.04 0.04 0.00 634.55 0.04 0.04 0.00 634.60 0.04 0.04 0.00 634.65 0.05 0.05 0.00 634.70 0.05 0.05 0.00 634.75 0.05 0.05 0.00 634.80 0.05 0.05 0.00 634.85 0.05 0.05 0.00 634.90 0.05 0.05 0.00 634.95 0.06 0.06 0.00 635.00 0.06 0.06 0.00 635.05 0.06 0.06 0.00 635.10 0.06 0.06 0.00 635.15 0.06 0.06 0.00 635.20 0.06 0.06 0.00 635.25 0.15 0.15 0.00 635.30 0.32 0.32 0.00 635.35 0.53 0.53 0.00 635.40 0.79 0.79 0.00 635.45 1.07 1.07 0.00 635.50 1.39 1.39 0.00 635.55 1.73 1.73 0.00 635.60 2.10 2.10 0.00 635.65 2.50 2.50 0.00 635.70 2.91 2.91 0.00 635.75 3.35 3.35 0.00 635.80 3.81 3.81 0.00 635.85 4.28 4.28 0.00 635.90 4.78 4.78 0.00 635.95 5.29 5.29 0.00 636.00 5.82 5.82 0.00 636.05 6.35 6.35 0.00 636.10 6.80 6.80 0.00 636.15 7.20 7.20 0.00 636.20 7.57 7.57 0.00 636.25 7.91 7.91 0.00 636.30 8.24 8.24 0.00 636.35 8.56 8.56 0.00 636.40 8.86 8.86 0.00 636.45 9.15 9.15 0.00 636.50 9.43 9.43 0.00 636.55 9.70 9.70 0.00 636.60 9.96 9.96 0.00 636.65 10.22 10.22 0.00 Elevation Discharge Primary Secondary feet} ?cfs} ?cfs} ?cf? 636.70 10.41 10.47 0.00 636.75 10.71 1 D.11 0.00 636.80 10.95 10.95 0.00 636.85 12.97 11.62 1.35 636.90 16.41 12.65 3.81 636.95 20.92 13.91 7.01 637.00 25.40 14.61 10.79 637.05 29.84 14.74 15.10 637.10 34.15 14.86 19.89 637.15 40.09 14.98 25.11 637.20 45.84 15.10 3D.74 631.25 51.90 15.22 36.68 631.30 58.30 15.34 42.96 637.35 65.02 15.46 49.56 631.40 72.04 15.57 56.47 637.45 79.01 15.69 63.32 637.50 86.17 15.80 70.37 637.55 93.52 15.92 77.60 637.60 101.D4 16.03 85.01 631.65 109.16 16.14 93.01 631.70 117.5D 16.26 101.24 637 .l5 126.06 16.37 109.69 637.80 134.83 16.48 118.35 637.85 144.04 16.59 127.46 637.90 153.49 16.70 136.80 63 7.95 16 3.17 16.80 146.37 638.OD 113.08 1 fi.91 15fi.11 Pond 1 hype X124-nr ? year, 241?our storm Rarnfa11=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 212212010 I??ydr?D_.C?? slr? ?5?23 .ADO H dr?AD ?ttwre S?I?t?c?ns LLC Pa e 8 Summary for Pond 8P: ?utfall 1 [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 5,580 ac, 0.00% Impervious, Inflow Depth ? O.17" for 1 year, 24 hour storm event Inflow = 1.11 cfs ? 12.51 hrs, Volume= 0.356 of Primary = 1.11 cfs ? 12.51 hrs, Volume= 0.356 af, Atten= 0°/°, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0,00-24.00 hrs, dt= 0.05 hrs Pond $P: 4utfall 1 Hydrograph ? ?ntl?+? ? ?rin??r? 1 .. .. 3 0 0 0 1 ? q a 7 8 9 10 11 12 13 14 15 16 17 18 1? ?? ?'? ?? ?? ?? Time (hours 1S ?S '?? Pre-dev QA-2 Pvst-de DA-2 Post C?e? A?Z FUND} ?? ?? ?P Dixie W?# Pond 2 Outfall 5ut7ca Reach and ??.?.?,j??( drainage Diagram for Pond 2-exarregle L-',, r? Prepared by K[mieyHarn and Associates, Inc., Printed 5f512?1? FfydroCAfl? 9.0? }In OSt23 C? 269 HydrvCAd So[lware 5olulioe?s LLC Pond ?-exam le Type !! 24-hr ? year, 24 Hour storm Rarnfal1=2.58" p Pre ared by Kimley-Horn and Associates, Inc. Printed 515!2010 P c ffiNare Solutions LLC _ Pa e HvdroCAD? 9.DD sln 05123 •2119 H ?r?CA? S• _ Summary for Subcatchment 1 S: Pre?ev DA-2 Runoff = 0.84 cfs ? 12.31 hrs, Volume = 0.190 af, Depths 0.19" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area ac CN Descri tion 11.soo 60 11.800 100.00°/o Pervious Area Tc Length Slope Velocity Capacity Description min feet ftlft ftlsec cfs? 24.2 Direct Entry, From spreadsheet Subcatchment 1S: Pre?ev DA-2 Hydrograph 0.9 . ? ? ? x,84 ?f 0.85, ? ?? ?h? ? r 0.8- 0.75-? hole Stogy O.l- ? ? ?? Os o Are????o ?. 0.55-. . ?.- Rolf o?e??? o ? 0.45_ R??o? D - h.? ?` ? 0.4 , . 0.35 ?*..?? ?? .. ?, 0.3 - ? , ?, ,?. . 0.25- ?#?? ...?,,, .; '.,.t. r. 1 1 a ? I ? a s * Y ' j ? ! C 0,1- . F f 0.05 0 ? ? 3 4 5 l 8 9 10 11 12 13 14 15 19 1?` 18 ? Time (hoursy L I 66 6.]! R??r?? Pond ?-example Type 1124-hr 1 year, 24 hour storm Rarnfal! 2.55" Prepared by Kimley-Horn and Associates, Inc. Printed 51512010 H droCAD®9A0 stn 05123 ©2009 H droCAD Software Solutions LLC Pa e 3 Summary for Subcatchment 2S: Post-dev DA-2 [49] Hint: Tc<2dt may require smaller dt Runoff - 51.23 cfs @ 11.96 hrs, Volume= 2.389 af, Depths 1.45" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rainfall=2.58" Area ac CN Descri Lion 19.790 88 19.190 100.00°/° Pervious Area Tc Length Slope Velocity Capacity Description min feet ftlft ftlsec cfs 5,0 Direct Entry, From spreadsheet Subcatchment 2S: Post-dev DA-2 Hydrograph - ? ? ? .. .: e r i t . ? C'4?IFk1?? a 1 i Y ? V ? .i Lf? ? i F t }?' i . ??? ? ? ?.. ...is } .. a. ._r, .. ?? ? ? ? 11 -h? ? 1 ? `r , 4?- . ,m.?, i .. a, ,??: e .? hoer sto?rr ? ?, i h + ??yy ?.. .? P I 1'?????I?isl?' ?V` +? ? :. - .. E ?o A??? ? #r+4 ?J ., ?y ?? .. :' I fo Vo??.?/ ? ' ' . ?++ .. + .r .' i- ? ? 1 ... h? ??? o Dept F' . + F r + _ -• bb ? Y _ R ? - F 4f ' f k x o ? '?• YYY 0 1 2 3 4 5 6 7 8 ? 1? ?1 ? ?- 1? 1 ? 1? i? 1 {l ? ? ??3 4 Time ???u??? Pond 2-example Type 1! 24-nr 1 year, 24 hour storm Ra?nfa11=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 51512010 ?roAC 9.00 sln 05123 n 2009 ? ?roCD Softrare Solutions LLB Pa e 4 Summary for Subcatchment 9S: Post Dev DA-2 ?UND? [49] Hint: Tc<2dt may require smaller dt Runoff -- 0.24 cfs ? 12.00 hrs, Volume= 0.024 af, Depths 0.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0,00-24,00 hrs, dt? 0.05 hrs Type II 24-hr 1 year, 24 hour storm Rai nfall=2,58" Area ac CN Descri tion 1.480 61 1.080 100.00°/o Pervious Area Tc Length Slope Velocity Capacity Description min feet f#Ift ftlsec cfs 5.0 Direct Entry, Subcatchment 9S: Post Dev DA-2 ?UND? Hydrograph 0.26- - ? ????? 8 ??.24 Cfs 0,24 - ? ? i { ? .. 0,22 ?. ? ?. +??} ??4 r T w `' _? R?III 0.1 ? ? .?: ? ... 11,-.,., ?. ....,?- ...?..... r I r R?r?o?f Ar=?o! a,??-? 0.??. ?r?off 'o??aeli ? . k, .., a ?? ? ? . ; 0.1 ? Tic=? ? i i ? a ? oq ? ? a a i { 0,08- ?N?? ? ? F . { q 9 l 0,06 - ' ' ..., 0.04 ? . 0.02 1 2 ? 5 6 ? ? 0 10 11 12 13 14 15 16 17 18 1? 2? 21 22 2 4 Time ?hours? Pond 2-example Type 1124-hr 1 year, 24 hour storm Ralnfal1=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 5512010 ??roCA[ 9.?? 'n ??123 __?9 I-?y?raCAD a????are ?I?t?c??ns LLC ?? ?? Summary for Pond 3P: Dixie Wet Pond 2 Inflow Area = 19.190 ac, 0.00°/o Impervious, Inflow Depth ? 1.45" for 1 year, 24 hour storm event Inflow = 51.23 cfs ? 11.96 hrs, Volume= 2.389 of outflow = 0.82 cfs a? 17.14 hrs, Volume= 0.655 af, Atten= 98°/0, Lag= 347.1 min Primary = 0.82 cfs @ 17.14 hrs, Volume= 0.655 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 654.09' @ 17.74 hrs Surf.Area= 41,244 sf Storage=18,057 cf Plug-Flow detention time= 405.4 min calculated for 0.654 of X27% of inflow} Center-of-Mass det. time= 275.1 min ? 1,094.7 - 819.6 } Volume Invert Avail.Stora e_ Stora a Descri tion #1 652.00' 210,330 cf Custom Stage Data ?Prismatic? Listed below ?Recalc} Elevation Surf.Area Inc.Store Cum.Store feet s -ft cubic-feet cubic-feet 652.40 32, l06 0 0 652.50 34, 232 16, l35 16, 735 653.00 38,218 18,113 34, 847 653.40 39,322 15,505 50,355 654.00 40,996 24,095 74,450 655.00 43,829 42,413 116,863 656.00 46,720 45,275 162,137 657.00 49,666 48,193 210, 330 Device Routln?g Invert Outlet Devices #1 Primary 652.00' 18.0" Round Culvert L= 51.0' RCP, square edge headwall, Ke= 0.500 cutlet Invert= 651.00' S= 0.0196 'I' Cc= 0.900 n= 0.013 #2 Device 1 652.00' 3.5" Vert. OrificelGrate C= 0.600 #3 Device 1 653.96' 30.0" W x 8.0" H Vert. OrificelGrate C= 0.600 #4 Device 1 655.60' 14.0' long x 0.5' breadth Top of Grate Head feet} 0.20 0.40 0.60 0.80 1.00 Coef. English} 2.80 2.92 3.08 3.30 3.32 #5 Secondary 655.60' 20.0' long x 31.0' breadth Emergency Spillway Head feet} 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. English} 2.68 2,70 2.70 2.64 2.63 2.64 2.64 2.63 Prirrrary GutF?? Max=0.81 cfs ? 17,74 hrs HW=654.09' Free Discharge} 1=culvert Passes 0.81 cfs of 9.84 cfs potential flow} 2=Gri?celGrate rifi+?e Controls 0.45 cfs @ 6.71 fps} 3=Gri?celGrate ?Cr?fi+ce Controls 0.37 cfs @ 1.15 fps} Top of Gra#e ? Controls 0.00 cfs} Secondary 4utFlow Max=0.00 cfs ? 0.00 hrs HW=652.00' Free Discharge} L5=Emergency Spillway ? Controls 0.00 cfs} Pond 2-example Type !! 24-hr 1 year, 24 hour storm Rainfall=2.58" Prepared by Kimley-Horn and Associates, Inc. Printed 5151200 HydroCAD®9.00 sin 05123 ©2009 HydroCAD Software Solutions LLC Page 6 Pond 3P: Dixie 1Net Pond 2 Hydrograph ?? - f ? 1.2 ?f i. d! eii? f.s ??a t . c? ? ? . ,.....,?; :.?,..,?,.?.?.? .;..d.,?.: .. 4- '/?I ? d Y. I i JY ?Y?ry 1 ?• r # ? Y 1F i 1 1 ° • ? I . . i r d I ? f ? ? ? - P I .a?ec \f c... iia ••..elvenni.; ?-+Y-+. i?--H• 1 A i a..,, d 3 1 i Y ? i ... d. f + 1 i 7f.1 . i i F t ? t 1 3 ? ? + 1r1 ?Y//?'iY.d`d`''''y1y + 1 ram 1 .....Yq M...ii. „•. ?'.• 111 ? i i a a e • ? . 1 - t qY} . ... 16° Y' ? d ;... ? ?1 ...7n, i : si v .I . :ii-??• ?4 y .. ry. . n Y . ? y ??` {• ¦ in?ow ?10??1+?v? (? P'rimary ???????r ? 1 2 3 ? 6 6 ? ? 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours Pond 2-example Type !! 24-hr ? year, 24 hour storm Rainfall=2.55" Prepared by Kimley-Horn and Associates, Inc. Printed 5/512010 H droCAD®9.D0 stn 05123 ©2009 H droCAD Software Solutions LLC _ P l Stage-Discharge for Pond 3P: Dixie Wet Pond 2 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 652.00 0.00 0.00 0.00 652.05 0.01 0.01 0.00 652.10 0.02 0.02 0.00 652.15 0.05 0.05 0.00 652.20 0.07 0.07 0.00 652.25 0.10 0.10 0.00 652.30 0.13 0.13 0.00 652.35 0.15 0.15 0.00 652.40 0.16 0.16 0.00 652.45 0.18 0.18 0.00 652.50 0.19 0.19 0.00 652.55 0.20 0.20 0.00 652.60 0.22 0.22 0.00 652.65 0.23 0.23 0.00 652.70 0.24 0.24 0.00 652.75 0.25 0.25 0.00 652.80 0.26 0.26 0.00 652.85 0.27 0.27 0.00 652.90 0.28 0.28 0.00 652.95 0.29 0.29 0.00 653.00 0.30 0.30 0.00 653.05 0.31 0.31 0.00 653.10 0.31 0.31 0.00 653.15 0.32 0.32 0.00 653.20 0.33 0.33 0.00 653.25 0.34 0.34 0.00 653.30 0.35 0.35 0.00 653.35 0.35 0.35 0.00 653.40 0.36 0.36 0.00 653.45 0.37 0.37 0.00 653.50 0.37 0.37 0.00 653.55 0.38 0.38 0.00 653.60 0.39 0.39 0.00 653.65 0.39 0.39 0.00 653.70 0.40 0.40 0.00 653.75 0.41 0.41 0.00 653.80 0.41 0.41 0.00 653.85 0.42 0.42 0.00 653.90 0.43 0.43 0.00 653.95 0.43 0.43 0.00 654.00 0.50 0.50 0.00 654.05 0.66 0.66 0.00 654.10 0.87 0.87 0.00 654.15 1.12 1.12 0.00 654.20 1.40 1.40 0.00 654.25 1.72 1.72 0.00 654.30 2.06 2.06 0.00 654.35 2.43 2.43 0.00 654.40 2.83 2.83 0.00 654.45 3.24 3.24 0.00 654.50 3.68 3.68 0.00 654.55 4.14 4.14 0.00 654.60 4.61 4.61 0.00 654.65 5.08 5.08 0.00 Elevation Discharge Primary Secondary feet cfs cfs} cfs 654.70 5.46 5.46 0.00 654.75 5.81 5.81 0.00 654.80 6.12 6.12 0.00 654.85 6.42 6.42 0.00 654.90 6.70 6.70 0.00 654.95 6.97 6.97 0.00 655.00 7.22 7.22 0.00 655.05 7.47 7.47 O.DO 655.10 7.71 7.71 D.00 655.15 7.94 7.94 0.00 655.20 8.16 8.16 0.00 655.25 8.38 8.38 0.00 655.30 $.59 8.59 0.00 655.35 8.79 8.79 0.00 655.40 8.99 8.99 0.00 655.45 9.19 9.19 0.00 655.50 9.38 9.38 0.00 655.55 9.56 9.56 D.DO 655.60 9.75 9.75 D.00 655.65 10.96 10.36 0.60 655.70 13.04 11.34 1.69 655.75 15.67 12.55 3.11 655.80 18.15 13.95 4.79 655.85 21.69 14.98 6.71 655.90 23.94 15.10 8.84 655.95 26.38 15.22 11.16 656.00 29.00 15.34 13.66 656.05 31.76 15.46 16.30 656.10 34.67 15.57 19.09 656.15 31.72 15.69 22.03 656.20 40.90 15.80 25.10 656.25 44.06 15.92 28.14 656.30 47.31 16.03 31.27 656.35 5D.63 16.14 34.49 656.4D 54.04 16.26 37.78 656.45 57.71 16.37 41.34 656.50 61.47 16.48 45.00 656.55 65.34 16.59 48.75 656.60 69.30 16.70 52.60 656.65 13.45 16.80 56.65 656.70 77.71 16.91 60.80 656.75 82.07 17.02 65.05 656.80 86.53 17.12 69.41 656.85 91.02 11.23 73.19 656.9D 95.60 17.33 78.26 656.95 100.26 17.44 82.82 657.00 105.00 17.54 87.4fi Pond 2-example Type 1124-nr ? year, 24 Hour storm ?air?fa11=2.58" 1 rep??e? by ale Hc?rr? and Asoo?ates, Inc. I r?r?te? 515I2010 droAD 9.?? ?? 052 209 ? dreAD ofrsr clukicn? I?LD P: e 8 Summary for Pond 8P: ?utfall 2 [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 20.870 ac, 0.00°/o Impervious, Inflow Depth ? 0.39" far 1 year, 24 hour storm event Inflow = 0.83 cfs @ 17.71 hrs, Volume= 0.615 of Primary = 0.83 cfs @ 17.71 hrs, Volume= 0.675 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Pond 8P: outfall 2 Hydrograph 0. 0.6 0. O.l 0. 1,f{ YF ... 0.? N C? (?. ..• 3 ?,4 0 ? 0. 0.3 0, 0.2 0. 0.1 0. 0.0 ir?i'ie? ?? Prim??r:? 0 1 ? ? 7 0 ? 10 11 12 13 14 ?? 5 1 Q ? ? 1 ? ? ? tf ? ?? .s ?? Time (hourly C, ?? ii v H C 0 7 V V _0 LL V ? ? D C NNN ? c'? o? N E • ?, ??N .? d1 ? N N ? +? +.• ? 0 ? ? ? ? ? ? ?X? ?m C ? ? G ? ? ? ? ? Erom ??? ?Z? ?N? ? V ? m V •N Boa .aNit? ? ?_ DU maY .o a '? ? ? d ? ? ? .-, ? ? ?, x N_ ? VN p?? N.??? t o? x,400 d? ?? J ? ? ? ?.,[? ? C ? ? 3 ?? ? o ? o ro E ? 0 0 •? ?d???; ? ?????? a ? a~ ? L N ? ? v H ? ? .C as ? ?' ? 3 ? O L N C G y ? ?D ? ? v ? ? ? ? 0 ? ? ? ? ? G7 (fl O V ? ? ? d??"•cfl ? ? c] ro ,? ?, a u? ? t` et A ? ? ?? ? ? U ro ? +? ? _ ?? .3 ???, 0 0 U ro o?? ? vs ?? _??? U :? ?; C tl? ? r ?t7 ? ._ C +? iQ N :.. ? 0 .-. ? N t ? ?_ ._ ? ? ? ? C L N C ? ? o.?? ro r fA . X 0 .? ? CIL?f? N .? ? ,r t V ? ? ? ++ 7 N N V ?? ? 0 0 °? 0 ? ?? ? Q V ? U ? ?? ? r ?V N ? ? ? W ? J'?? c ? ? 0 ? Z? Culvert DesignerlAnalyzer Report DRR CROSSING ? Peak Discharge Method: User-Specified Design Discharge 512.82 cfs Check Discharge 654.06 cfs Grades Model: Inverts Invert Upstream 641.59 ft Invert Downstream 637,54 ft Length 206.00 ft Slope 0.019660 ftlft Drop 4.05 ft Headwater Model: Allowable HWIHeight Headwater DepthlHeight 1,20 Tailwater Conditions: Constant Tailwater Tailwater Elevation N1A ft Name Description Discharge HVII Elev. Velocity T x Trial-1 1-10 x 7 ft Box 572.82 cfs 648.77 ft 19.91 ftls Title: Dixie River Road Project Engineer: Matt Edwards k:1.,.lstormldixie river roadldrr culvert size.cvm Cary, NC CulvertMaster v3.3 [03.03.00.04] 06/01110 03:50:01 PM©Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert DesignerlAnaiyzer Report DRR CRaSSING 1 Design:Trial-1 Solve Far: Headwater Elevation Culvert Summary Allowable HW Elevation 649.99 ft Storm Event Design Computed Headwater Elevc 649.77 ft Discharge 572,82 cfs Headwater DepthlHeight 1.17 Tailwater Elevation NIA ft Inlet Control HW Elev, 648.98 ft Control Type Entrance Control Outlet Control HW Elev. 649.77 ft Grades Upstream Invert 641.59 ft Downstream Invert 637.54 ?k Length 205.OD ft Constructed Slope 0.019660 ftlft Hydraulic Profile Profile S2 Depth, ?ownstream 2,88 ft Slope Type Steep Normal Depth 2.53 ft Flow Regime Supercritical Critical Depth 4.67 ft Velocity Downstream 19.91 ftls Critical Slope 0.003551 ftlft Section Section Shape Box Mannings Coefficient 0.013 Section Material Concrete Span 10.00 ft Section Size 10 x 7 ft Rise 1.D0 ft Number Sections 1 Outlet Control Properties Outlet Cantrol HW Elev. 649.77 ft Upstream Velocity Head 2.34 ft Ke 0.50 Entrance Lass 1.17 ft Inlet Control Properties Inlet Control HW Elev. 648.98 ft Flaw Control NlA Inlet Type 45° wingwall flares -offset Area Full 10.0 ft2 K D.49100 HDS 5 Chart 13 M 0.65700 HDS 5 Scale 1 C 0.03020 Equation Form 2 Y 0.83500 Title; Dixie River Raad Project Engineer: Matt Edwards k:l...lstormldixie river roadldrr culvert size.cvm Cary, NC CuivertMaster v3.3 [03,03.00.04] 06101/10 03:50:01 PMO Bentley Systems, Inc. Haestad Methods Solution Center Watertown, CT Ofi795 USA +1-203-755-1666 Page 2 of 2 HY-8 Culvert Analysis Report Table ? -Summary of Culvert Flows at Crossing: Crossing 2 Headwater Elevation Total Discharge ?cfs? Culverk 2 -72" Roadway Discharge ' Iterations ??? Discharge ?cfs? (cfs} 646.30 0.00 0,00 0.00 1 648.04 19,46 19.46 0.00 1 648.87 38,92 38.92 0.00 1 649,52 58.39 58.39 0,00 1 650.12 17.85 71.85 0.00 1 650.68 97.31 97,31 0,00 1 651.23 116.17 11 fi.77 0.00 1 651.79 136,23 136,23 O?OD 1 652.39 _ 155.70 155.70 0.00 1 _ 652.95 169.68 169.68 0.00 1 654 A 1 194.62 194.62 0.00 1 660.00 301.89 301.$9 0.00 Overtopping Rating Curve Plot for Crossing: Crossing 2 ?'???? ??.t1?1? ?lll?? ?. ?1'0??111?: ?1I'i?,??111? ? ??? ?? ?_ ? ??? 0 ? ??? ???'}} W ??.F? ? ??? 2 ?? ??? ??? a. , p¢ 1 11` 1 .. 4? f a a a a a a a a. a. s. a. a a. t. a a i. a r a. M a ?t F 4 w•?F f T r?. a a .a a a a a. a ?. a.? a a? ..fie ? a a s a a a a .. a. a ? s 1 ? 1 1 I I # I I 1 1 ? 1 p 1 1 p ? Y I a. ? 1 1 p I I 1 ? I 1 ,.aaa.aaaaaaaaaa..aa.r=.__.___a,sta.,a.a.a.r_a_____a.?_.._._.?paaa..a .--_-----ai- ? p ? , 1 A I , I 1 I I F I A ? ? , 1 I r p i ? ---r ..............?--+-ra.a-a_--------a_-_r?-_=_a..aaaaaaa .I.aa_....?,,.r#,?aaaa?, a, ? I i 1 4 ? I ? I ? p F 1 '4 r' ? I , 1 f a. ¢ p I I ? ---t??..t,. ?aaaaaaa---r. ...-'----a_._a_..r_1_. aa.aaaa-------=I==a,.,.?.z--aaaaaaaaa?a 4 p I 1 1 F 1 I ! r } p k I f w ? I F ? i } p I 1 M a. 1 1 a a ? a a a a .aaa .?.? .. ? a.a a a a ?... a. 1 .; --al a. } 1 1 ? I ,.. I I I 1 I p Y I 1 1 Y 1 ? 1 # 1 ? I ¦a?#i.a aaaaa.aa..a .?:......?.??.r?srw+.ar..aaa.a.a.a......a air sw?. aaa.aaaa.a.a. 1a p I p r Y Y A I 1 1 s p I I 1 I 1 ? p i 1 I 1 I ? Y . alaa.a. a...a.aa.??.:a.a?++5re.t•aaa.a.aaL..a.a.aaa.a.ariart?#..?ta=•aaa...a..aa.aJa p ? p ? 1 1 ? I p I ?' Y 1 1 I 1 1 i I F 1 I ? 1 p 1 i al a.? a+.aa.F waaa ?1. ?.::aa«a?..a ate+a a.a aYw ......aa.+....a..-- .. a `. a ...... a. a a. 1 a ,. a ...... 1 ? i 1 I ? I 1 1 p 1 ? ? 1 I ? II ? p 1 a ?o ? oo ? ?o ??r? Total Discharge ?cfs) Table 2 -Culvert Summary Table: Culvert 2 -72" Total Discharge (cfs} Culvert Discharge ?cfs} Headwater Elevation tft} inlet Control Depth eft} Outlet Contrel Depth eft} Fbw Type Normal Depth (ft) Critical Depth (ft} Outlet Depth eft} Tailwater Depth (ft} Outlet Velocity ?ftls} Tailwater Velocity ?ftls} 0 00 0 00 646.30 O.D00 0 0? 0-NF 0.000 0.000 0.000 0 000 0.000 0,000 19.46 19,46 648,04 1223 1.743 3-M21 1.740 0.778 1,169 1,169 3.201 4.744 38.92 38,92 648.87 1.887 2.568 3-M21 2.653 1.224 1,517 1 517 4,802 5.641 58.39 58.39 fi49 52 2.430 3.219 3-M2t 3.441 1.581 1.766 1,766 6.092 6.243 77.85 77,85 650.12 2.993 3.817 3-M21 4.349 1.897 1.967 1..967 7.217 6.709 97.31 97.31 650.68 3.566 4 378 2-M2c 5,000 2173 2,181 2.138 8062 7,094 116,77 116 77 651,23 4.:127 4 934 2-M2c 5,000 2.433 2.438 2.290 8.566 7.424 136,23 136 23 651,79 4.648 5.487 2-M2c 5.OD0 2,6fi7 2 672 2 42fi 9.,100 7.716 155.70 155.70 652.39 5,169 6,092 2-M2c 5.000 2 891 2.894 2.551 9578 7.978 169.68 169.68 652.95 5.545 6,653 7-M2c 5,000 3,045 3,047 2.634 9.909 8,151 194 62 194.fi2 654,01 6.235 7.712 7-M2c 5000 3,292 3 297 2,773 10.521 8 436 * theoretical depth is impractical. Depth reported is corrected. t??¦¦¦r+¦¦r¦¦i+t+++r?r*+4r+??.¦¦¦¦+¦?¦.¦r.+++r?rrfYr?¦.¦.?•..rr¦iir¦trift7lrrr??:. Inlet Elevation (invert: 646,30 ft, Outlet Elevation (invert: fi45,91 ft Culverk Length: 200,00 ft, Culvert Slope: 0.0019 i?rr?e?i+?••+.¦r.¦¦¦.?ia:++rri+++rrFiars?...¦¦:rf¦¦+ri?+++r+???•¦¦¦¦¦.¦.¦¦¦+¦.¦r Culvert Performance Curve Plot: Culvert 2 -l2" ??1`??1`111c?11C? ?lll? 0 Inlet Control Elev Outlet Control Elev ??4 ? ??? ? ??? ? ??? W ??? ? ?4? ? ?4? I ??? ?4? lJ ??} IllU IaV LVU Total Discharge (cfs) Water Surface Profile Plot for Culvert: Culvert 2 -l2" ?r??sit? - r???itl ' Deli 1 Di??llar ? - ? ?9. ? ifs ? ?a ? ? Cr?h*ci?t - C??T?i?t ? -??", ?t??*ei? Ibis cl?ar?c -1 ?9. ? c f? 660 65? 656 ?? 6a4 ¦? io 652 W 650 64? 646 - , , Y i I ? Y .. a? 8 iF siF Ff¦+ as sL.s r. ?? YrH ¦i.k. _ ? .k. ar a? 4 k i ¦ • i.? *?a'?.a. a. a. aarJ rt+ 1 I ? ? 1 1 I Y } I 1 4 M ? ? I 4 .. k ? - I f k } 1 k N , I ? s Y yaa?aa aa.?a+ta?.i??.4....... ar ri ?r?i tfsfi+?? t I *??a.a.r??.s?ils.?a?.a Y F ..a a.a?a.a?sa ?itra?.a'aaa .. I F Y k k I f k I A ? ? I 1 I k I k Y I I k I ? k I ? w I ? ' .rr?ls??i*. *,.a.a?Lrr???f ?*aa4?aaa.ar?atir I ? rh.*f*...aaaaa????¦ ¦ I astr..J...aa?aaa?r•.ti?i.s* I Y i Y Y q + Y k a 1 A ? f Y k r I k F k i 6 I Y ? ? 1 4 I 1 k aa,????•*; .. ??aa ar.a e I at??s .. ;,?#.+ aaaaa.a?aa?.a?it ? a,.+a ...,.?Y..: aa?a ? I i $,tf.?*. ....a.aaa.,ar. _ 1 I k i f I I k k f M i I ? Y I ? ' Y a??*®;i*.+?t.a.a? ??.?a?•*?siwFr*aa.a?.saga+ 1 f rp;sa Y k ¦*a+...aa.aal.a?Tri 1 I. 1 4 trs?? yaaa.aaaa?rat#a;s ? ? Y } k k 1 I k } Y k ? ? I Y I F. I .. k 3 ? ? . ? = r = . . a a ? ' Y .. a ? a .. ? r ? * t f * * a.. ? . a.. i ? a ? a# ?.? ,. + .. y a ? I. 4 _.* ? ?,a ? a ? a . a a a ? .. I Y ? I 1 1 I r ? k 1 ? ? i k ?,f...}a.a.a,.a...?+. f. ' k ?....?....aka;?a,.?ssas.=Fa?a ? aa..?7+:.-lta.a,...?aa?.aa? .?.?af*?.... ?.y.. I ? I ? Y Y I I. F I Y n•r ? ? ? ? y ? I k I k k Y k k I i ¦?.a**:..a., aaa?? ire ?+r wes a?.a aa.a.?r ry•s ? ? yW a? Y k a ? ? A A k k F Y Y I I f y l l f l l l l l P I' I I I ? f l l i ? 1? 1 I?? I L_I -?0 0 50 100 150 ?UU 15U Station (ft) Site Data -Culvert 2 -l2" Site Data option: Culvert invert Data Inlet Station: 0.00 ft Inlet Elevation: 645.30 ft Qutlet Station: 200.00 ft Dutlet Elevation: 644.91 ft Number of Barrels: 1 Culvert Data Summary -Culvert 2 -72" Barrel Shape: Circular Barrel Diameter: 6.00 ft Barrel Material: Concrete Embedment: 12.00 in Barrel Manning's n: 0.0120 stop and sides} Manning's n: 0.0350 bottom} Inlet Type: Conventional Inlet Edge Condition: Thin Edge Projecting Inlet Depression: None Table 3 -Downstream Channel Rating Curve Crossing: Crossing 2? Flow ?cfs} water Surface Elev eft} pepth eft} Velocity ?ftls} Shear ?psf} FrOUde Number 0.00 645.91 0.00 0.00 0.00 0.00 19.4fi 647.08 1.17 4.74 1.19 1.09 38.92 641.43 1.52 5.64 1.54 1.14 58.39 641.68 1.77 6.24 1,80 1.17 77.85 fi47.88 1.97 6.71 2.00 1.19 91.31 648.05 2.14 1.09 2.1 l 1.21 11 fi.77 fi48.20 2.29 7.42 2.33 1.22 136.23 fi48.34 2.43 7.72 2.47 1.23 155.70 648.46 2.55 7.98 2, 59 1.24 169.68 648.54 2.63 8.15 2.68 1.25 194.62 648.68 2.77 8.44 2.82 1.26 Tailwater Channel Data -Crossing 2 Tailwater Channel option: Triangular Channel Side Slope ?H:V?: 3.00 ?_:1} Channel Slope: 0.0163 Channel Manning's n: 0.0270 Channel Invert Elevation: 645.91 ft Roadway Data for Crossing: Crossing 2 Roadway Profile Shape: Constant Roadway Elevation Crest Length: 150.00 ft Crest Elevation: 660.00 ft Roadway Surface: Paved Roadway Top Width: 59,00 ft Culvert Two Downstream Ditch Calculations Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.030 Channel Slope 0.01000 ftlft Left Side Slope 3.00 ftlft ?H:V} Right Side Slope 3.00 ftlft ?H;V} Discharge 55.00 ft31s Results Normal Depth 1.97 ft Flow Area 11.62 ft2 Wetted Perimeter 12.45 ft Hydraulic Radius 0.93 ft Top Width 11.81 ft Critical Depth 1.84 ft Critical Slope 0.01447 ftlft Velocity 4.73 ftls Velocity Head 0.35 ft Specific Energy 2.32 ft Froude Number 0.84 Flow Type Subcritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number 0f Steps 0 GVF Gutput Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ftls Upstream Velocity Infinity ftls Normal Depth 1.97 ft Critical Depth 1.84 ft Channel Slope 0.01000 ftlft Critical Slope 0.01447 ftlft Bentley Systems, Inc. Haestad Methods SoB?i?e?F?arMaster V8i (SEl.ECTseries 1) [08,11.01.03] 61112010 4:04:00 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203.755-1666 Page 1 of 1