Loading...
HomeMy WebLinkAboutNCC205116_NOI Application_20201112Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/5/2020 10:26:51 AM (NCG01 NOI Submission) Approve by Garcia, Lauren V 11/9/2020 8:47:56 AM (Review- Construction NOI 35188) • The task was assigned to Garcia, Lauren V by round robin distribution 11/5/2020 10:27 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 9, 2020 5:00 PM 11/5/2020 10:27 AM Submit by Selkane, Aziza 11/12/2020 10:48:07 AM (Payment Verification for NCC205116) * Dan C Gardner • Selkane, Aziza assigned the task to Selkane, Aziza 11/12/2020 10:47 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 21, 2020 5:00 PM 11/9/2020 8:48 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Lake Gaston Hydropower Station - Eel Passage Structure Replacement & Access Road 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers N/A 2. County* Halifax 3. Highway or Street Johnny Faulcon Rd. Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Littleton 5. State * NC 6. Zip Code * 27842 7. Latitude* Enter the latitude in decimal degrees 36.5003 8. Longitude * Enter the longitude in decinal degrees (MUST be negative) -77.8115 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11 /09/2020 Estimated Construction Project Start Date 10. Date to End* 03/31/2021 Estinated Construction Project End Cate 11. SIC (Primary)* Industrial (1541) Standard Industrial Oassification for Development 12. Acres to be 2.67 disturbed* (including off -site borrow and waste areas) 13. Total site area 9.00 (acres) * 14. Post- 0.87 construction (Estirrated) impervious area (acres) * NCC Project NCC-HALIF-2020-Lake Gaston Hydropower Station - Eel Passage Tracking ID Structure Replacement & Access Road Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Roanoke River Wate rbody* %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 23-(12) Index No.* NCWaterbody Index Nunber Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Dominion Energy IF pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Robert If Corporation, enter Faegistered Agent First %rre 3. Last Name* Sauer IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Vice President, System Operations 4. Permitee E-mail PG.Environmental@dominionenergy.com Address* 5. Permittee 804-273-3685 Telephone No.* 6. Permittee Mailing Street Address Address* 120 Tredegar Street Address Line 2 Attn: Laura Zuranski City Richmond Check box if the street address the same as mailing address 7. Permittee Street Address* Fbstal / Zip Code 23219-4306 V Yes Street Address 120 Tredegar Street Address Line 2 Attn: Laura Zuranski city Richmond Fbstal / Zip Code 23219-4306 State / Frovince / Fbgion VA Country us State / Frovince / Region VA Country us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Benjamin Contact - First Name * 2. Primary Site Rice Contact - Last Name * 3. Title Power Generation Site Manager 4. Site Contact E- ben.rice@dominionenergy.com mail Address* 5. Site Contact 276-220-9713 Telephone No. 6. Organization Dominion Energy Name 7. Site Contact Street Address Mailing Address* 100 Oakwood Ave Address Line 2 City Roanoke Rapids Fbstal / Zip Code 27870 8. Consultant Name (Optional) N/A First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant N/A Telephone No. State / Rovince / Region NC Country US D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/27/2020 Approved * 2. E&SC Plan Project NORTH-2021-001 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan NORTH-2021-001_20201027_LOA.pdf 267.04KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) NORTH-2021-001 Site Location Map.pdf 515.74KB Mast be RDF format. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Rovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification Signed Notice of Intent Form.pdf 65.3KB Form Wst be RDF format This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Robert Sauer Title Vice President, System Operations Organization Legally Responsible Entity Dominion Energy Date * 11/05/2020 F. Tracking and COC Info NOI Tracking No. 35188 NC Reference No. NCG01-2020-5116 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205116 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5116 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205116-2020 Invoice Due Date 12/9/2020 Initial Fee $ 100.00 Invoice Status OPEN