Loading...
HomeMy WebLinkAboutNCC205148_NOI Application_20201112Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/9/2020 3:58:28 PM (NCG01 NOI Submission) Approve by Gamble, Aana C 11/10/2020 9:52:57 AM (Review- Construction NOI 35402) • Clark, Paul reassigned the task to Gamble, Aana C 11/9/2020 7:23 PM * thx • The task was assigned to Clark, Paul by round robin distribution 11/9/2020 3:59 PM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 11, 2020 5:00 PM 11/9/2020 3:59 PM Subnut by Selkane, Aziza 11/12/2020 10:42:36 AM (Payment Verification for NCC205148) * Nicholas Berndt • Selkane, Aziza assigned the task to Selkane, Aziza 11/12/2020 10:41 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 22, 2020 5:00 PM 11/10/2020 9:53 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 35308 NOI No. Prior Reviewer Aana Gamble Name 1a. Project Name * Mercedes Benz of South Charlotte 1 b. Specific Lot This field may be used to list specffc lot numbers. Numbers 2. County* Mecklenburg 3. Highway or Street 950 N Polk St Address * Street narre only is acceptable if no address number assigned yet 4. City or Township* Pineville 5. State * NC 6. Zip Code * 28134 7. Latitude * Enter the latitude in decimal degrees 35.0928 8. Longitude* Enter the longitude in decimal degrees (M. ST be negative) -80.8833 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/16/2020 Estimated Construction Project Start Date 10. Date to End* 03/15/2021 Estimated Construction Project End Cute 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Developrrent 12. Acres to be 5.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 11.43 (acres) * 14. Post- 8.40 construction (Estimated) impervious area (acres) * NCC Project NCC-MECKL-2020-Mercedes Benz of South Charlotte Tracking ID Assignedautorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Little Sugar Creek Wate rbody* %rre of waterbody into which stornwater runoff will discharge 15b. Waterbody 11-137-8 Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Rarmttee Inforrration - Legally Fbsponsible Entity and Individual ........................................................................................................................................................... Important: The person vvho signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who ovvns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1.Organization Legally PesponsibleEntity Name * SB Auto Investors, LLC If pernittee is an individual (i.e., organization does not apply), enter first and last nave in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Stephen If Corporation, enter Faegistered Agent First Nerre 3. Last Name* Terry If Corporation, enter Fbgistered Agent Last I\brre 3b. Title Assistant Secretary 4. Permitee E-mail nberndt@amsinet.com Address* 5. Permittee (561) 655-8900 ext 152 Telephone No.* 6. Permittee Mailing Street Address Address* 505 South Flagler Drive Address Line 2 Suite 1400 City State / Province / Pegion West Palm Beach FL Postal / Zip Code Country 33401 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 505 South Flagler Drive Address Line 2 Suite 1400 City State / Province / Faegion West Palm Beach FL Postal / Zip Code Country 33401 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. ^ Roject Site Contact Inforrration ....................................................................................................................................................................................................................................................................................................................................................................................... 1. Primary Site Wesley Contact - First Name * 2. Primary Site Sherrill Contact - Last Name * 3. Title President 4. Site Contact E- wsherrill@benesch.com mail Address* 5. Site Contact 17049750472 Telephone No.* 6.Organization Benesch Name 7. Site Contact Street Address Mailing Address* 2359 Perimeter Pointe Parkway, Suite 350 Address Line 2 city State / Rovince / Region Charlotte North Carolina Fbstal / Zip Code Country 28208 us 8. Consultant Name (Optional) Wesley Sherrill First and Last nacre 9. Consultant E-mail wsherrill@benesch.com This person will be copied on all correspondence. 10. Consultant 17049750472 Telephone No. D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 11/04/2020 Approved * 2. E&SC Plan Project 408248 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Mecklenburg County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan StormWaterPermit # 408248.pdf 15.81 KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification Signed NOI 11.9.20.pdf 297.13KB Form Mist be RDFfornat This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature 51eplw14 Teffl Type Name* Stephen Terry Title Assistant Secretary Organization Legally Ibsponsible Entity SIB Auto Investors, LLC Date * 11 /09/2020 F. Tracking and COC Info NOI Tracking No. 35402 NC Reference No. NCG01-2020-5148 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC205148 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5148 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC205148-2020 Invoice Due Date 12/10/2020 Initial Fee $ 100.00 Invoice Status OPEN