HomeMy WebLinkAboutNCC202149_NOT Closeout Documents_20201111North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
County: Cumberland Project: Barrington Place Lots 2, 5 & 6
Person financially responsible: Caviness Land Development, Inc. —
Watson G Caviness, President
Address: 1041 B Robeson Street, Fayetteville, NC 28305
1. Project Location: Mallie Court/Jax Court, Eastover
Pictures: No
2. Weather and soil conditions: sunny, workable soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Cape Fear
Project #: CUNME-2020-164
COC: NCC202149
Initial inspection: Yes
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: November 10, 2020
Yes
10. Comments:
Permanent ground cover sufficient to restrain erosion has been established. No additional self monitoring or self
inspections are required. Project is released under SPCA of 1973. Termination of coverage under the NPDES
General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of
Termination.
Reported by: Lori Britt Others present:
Date of inspection: November 09, 2020 Time arriving on site: 9:07 AM Time leaving site: 9:10 AM
cc: