HomeMy WebLinkAbout20201423 Ver 1_Shoreline Stabilization_20201110Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 11/10/2020 7:54:24 PM (Submittal)
Submit by Montalvo, Sheri A 11/10/2020 8:53:29 PM (Non -DOT - Approver)
• The task was assigned to Montalvo, Sheri A 11/10/2020 7:54 PM
Submission Form
Pre -Filing Meeting Information
Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able
to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance
with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall
request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5)
all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying
authority at least 30 days prior to submitting the certification request. Click here to read more information on when this
form is needed prior to application submission or here to viewthe form.
Attach documentation of Pre -Filing Meeting Request here:
NORMAND PREFILE APPVL.pdf 382.98KB
Pre -fling Meeting or Request Date 10/7/2020
ID# 20201423 Version 1
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email * HAGER@LAKEPERMIT.COM
Rease provide an email address for payment and requests for pure information here.
Owner Information:
Name: * JEFFREY NORMAND
Email: * JEFF@NA-INC.COM
Phone Number:* (419)944-5500
(xxx)xxx-xxxx
Mailing Address:* Street Address
112 Bonner Lane
Address Line 2
City
State / Frovince / Region
Mooresville
NC
Fbstal / Zip Code
Country
28117-3506
US
Is there an agent working on the F Yes
project?* r No
Agent/Consultant Information
Name: * TAMARA HAGER
Company Affiliation:* LKN DREDGE AND MARINE CONSTRUCTION
Email:* HAGER@LAKEPERMIT. COM
Phone Number:* (704)575-2227
(XXX)XXX-XXXX
Address:* Street Address
PO BOX 5335
Address Line 2
City
State / Province / Region
MOORESVILLE
North Carolina
Fbstal / Zip Code
Country
28117
United States
Asigned and dated copy of the Agent Authorization letter:*
NORMAND AUTH.pdf 844.86KB
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name:* NORMAND
If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by
the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any
other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect
to local landmarks such as towns, rivers, and roads.*
r Upload File
r Lookup address
Upload Map: NORMAND TOPO.pdf 1.34MB
Latitude:* 35.546618 Longitude:*-80.935463
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging
below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the
diagram under section 12.normal pool lake level/normal water level*
NORMAND SURVEY.pdf ;\IB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a
yard stick, shovel handle, etc.)*
NORMAND PICS.pdf 403.22KB
4. Location of the property (where work is to be conducted)
Nearest Town:* MOORESVILLE
County:* IredeU
Lake/ river/ ocean adjacent to NORMAN
property:
Subdivisions name or site address:* THE HARBOUR
hclude phasellot nunber
Directions to site:*
FROM MARSHALL STEAM STATION HEAD SOUTH TOWARD 150
E, GO HWY 150 E 5.4 MILES, RIGHT MORRISON PLANTATION 1.1
MILES, RIGHT BRAWLEY SCHOOL RD 3.6 MILES, RIGHT ONTO
BAY HARBOUR RD .08 MILES, TURN LEFT ONTO BONNOR IN 89
FT. TURN RIGHT 23 FT. KEEP LEFT 13 FT. HOUSE, HOUSE 112
BONNOR LANE
Rease include road naves and nunbers, landnarks etc.
5. Describe the existing land use or condition of the site at the time of this application:*
RESIDENTIAL
Fbsidential, undeveloped, etc.
6. Property Size .95 ACRES
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary):
CONSTRUCT RIP RAP TO SHORELINE FOR STABLIZATION
8. How will the work be done?* r- From Land
IW From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level:*
0
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet
land -ward:*
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet
landward to be impacted:*
(nunber of trees, for instance)
NONE
Sketch: NORMAND SKETCH.pdf 234.69KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act');
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act');
0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
o I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* JEFFREYNORMAND
Signature:
/ramfeQw
Initial Review
Is this accepted into the review
process?*
Project Number:* 20201423
Select Reviewer:*
Select Reviewing Office
Has payment been received?*
What amount is owed?*
rYes allo
Version:* 1
Alan Johnsomeads\adjohnsonl
Mooresville Regional Office - (704) 663-1699
r No Payment Needed
r Fee Received
r Need Fee - send electronic notification
r $240.00
f $570.00
etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations,
and construction access corridors. You may use the diagram provided at the end of this
application form,
I Attach a photograph of the shoreline/ buffer proposed to be stabilized. (include a scale
of some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County: .—, Nearest Town: 's
Subdivision name or site address (include phase/lot number): Lt_-T-Itt 577,
V
Directions to site - please include road names and numbers, landmarks, etc.:
latitude (in decimal degrees) + 54 G / Longitude (decimal degrees) r3 Z4la3
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): R _ i _ 7�
6. Property size (acres):
7. Lake/ river/ ocean adjacent to property: JJ L-) �l r: 1 A
S. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): r'
9. Will work be conducted from land? From water? ZI�tr�C�� ,zYV<'l
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.)L`i�
below the normal pool lake level/ Normal Water Level in square feet or acres:
11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining
walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in
square feet or acres:
12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and
50 feet landward to be impacted (number of trees, for instance):
i
Owndr/Agent' Si tore [15A NCAC 02H .0502 f Date -
�Agent'�s9nature is ' lid only if an authorization letter from the owner is provided.
FORM: SSGP 10-2D13
Page 2 of 3
.`.`," GIVE
LAKE NORMAN DREDGING INC. AUTHORIZATION TO OBTAIN THE NECESSARY
INFORMATION FOR STABILIZATION AND DREDGED PERMITS.
I AGREE:
SUFFER moTmorzy li aN FO RNA
Project 1
Gw§ner:
Co K t tra'v i
The approval is for the purpose and design described in your application. Impacts not indicated in tha
application is a violation of the Buffer Rude. Site specific work should be provided in the application. (15A NCAC
02H .0506 and 15A NCAC D2B .0243(8) j
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 f t of the full pond elevation), unless
approved. Exception, those treesthat are severely undermined al0ngthe irr�n�ediate shorEdine can be removed_
iVlinimai shaping and sloping z(ong the immediate shoreline is allowed. (1.5A NCAC 028 .0243(5)1
Benching, grading fn the bu; E er Is not allowed. EAcessive disturbance of around cover_ [15A NCAC 02B .0243 (6)]
3eaches, imr'er4vfcus patios, impervious walkways, etc_ are not allowed in the bu ferunless specfficallyapproved
by the Division. There are limitation on sfae for decks. [15A NCAC 028 .0243(4) and 6
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
Mark corridor should be described. The approved access corridor shall be restored. Staging s
material must be outside the but er. f-15A NCAC 02i 10502 and 15A NCAC 028.0243 n), b, spoil, construstian
Stormwater cannot be piped or channeled for direr discharge to the lake_
discharges must be atthe natural elevation and discharged prior tO entering -Lje All constructed Stpril]iN'at2r
sheetflotiv at non -erosive velocities to tl�e lake. i?5A fVCAC 0213 .OZ43(5 5 l� " pu ;er directed as di ;use or
A ckno twIedgemer, t of Notifico_'ion
Riparian Buffer n hereby state that f have been informed of the Catawba
ule. ,any work conducted in the butter, not speci,`ically sated in the application and approved
by the Division o$Water Resources (DWR), is a violation and subject t enforcement_ Due diligence will be
taken such thatthe construction will be built within substantial Co
Quality Certification and Buffer Rules the a 13dlanCe and Intent oft -he tiie 401 �IIla�er
materials. n approved Plan(s) and peci,`'ictio,n(s), and other supporting
Signature (owne
Date:
11/10/2020 M yTopo Search
https://search.mytopo.com/searchplaces 1/3
Step 1: Where should your map be centered?
Enter a place nam e or address to find m aps avai l able in your area of i nterest.
Hide Map
Make a Custom
Map
Browse S tock
Maps
C ustom Map Tools
×
112 Bonner Lane, Mooresvi lle, North Carolina 28117, Un…
MyTopo SEARCH MAPS ONLINE MAPS CONTACT US LOGIN
- — - - - - _-�,�oa:mew,vuwka,:«�3eax;Fxr�bwars.+e>�a�uerc�a,:s�,,,In�nWwwaKn�..•.�.R.--:+ '�.,�
���1a�Sg .t &° �� EaF� �a -i �pPw M:a ���e °C i�Yim
tR
S -�+
3 FW
�� � J y�y � a -_� 1 I r 5 �
s� �a E E S _o
lit- u! w
8 0 0. 3
ci A
Wo w q
mz
` w a
? yy�ia+n R ¢
�P,
a
U n
f Y
F--
Q
U)v) /
e LO
Ale Ld
LjS cc
Lj
In
} �•/ A�' z Ip w I Leh Q
w
�
p.'i m .ysS nyyey lYw U O, �.
3q
p0Y
lN
moVu O aoN L
E V
tti
% < It
� r
di a
lad
3 PIA
` `rage`OpO 'h. 1 Q R
$ gg�g cis E�RLr� §I$� pp a W¢¢�n?pp���� Y4 m;�
�k 3� ,r�i,�ypg1aE�tir� tE2�i�E �Y oW2 1=< 1 lz
0aJ LL R? 8„
LLJ
Zl
q w'
OEM
Pdl
Q 1121
a c
In van
31 §�� aQ
30
tl�F• ( 4 \ ,p� � N
�yc L � . �� \� f gMs Y9 •1Fn` r� � 7 ��ri¢ �yn� ya J w�
to
o y yr" a 1 'CAA
�-
� T 4ba �T' Ill N .AAis.VZ ~
El� 1 k� ie4eu�s Ntj � h-
�,�"
a 1 opo7 cam' '� 4 �� ' ~ a s W
r7
OD
�w \
-LLE can
fig $ r4- n
\
y
p8 n
i�
5 W F
GyII
i
. 'fa'-_;-T"!a3:.nk' "-. �,-..t . a<-�e_�._^hex.-�.:•'-�9�^""r..�•.,�iP'n`.:NLC'r'>srs � ._..,.�.« .9P;-^.n __, - ._ate-��.r�"a.,,.w . -. r-sr�.r.+-�'rwr
5
w orwx�cc xn u �R r�sw�r
4
IS 90E SF�B� �
q
$cc
1R Rk I
x
�C URwu�T .w0 U�urt ct5e34M
�i
i
v
y
a
�
D
�
♦♦��
1
�
Y
S
qR "s g s zrM s'4Ces� e G
£i s lgz� x�' R e ¢ �
2 nip
s� �a E.���s
gC�a���~�Q3r3&&E %
1P1?aR�r-'�a�
�s15§ g R�
From; Tamara Hager tamarahager@lcloud.com
Subject- Normand shoreline
Date a Sep 26, 2020 at 8:49:09 AM
To- hager@lakepermit.com
�Ct'-t A-rI 0
12 aovma-r- LP-1
2f it?
Sk,,4, A&
1 8eloA�
-:7> cs -P. G
Tamara Hager
704-575-2227
Full Pond/
Normal *eLevel
�
�horeiine
Lake
(At Pull Pond/!Normal Water Level)
G
S3/
::� `:SEL0V'
fob I;Z`� f Z L=-r�lc�
1 � i �,OAj6-, 1ZQY�I
Please approximately sketch the following information on this plan (provide dim ensionsforeach
it -ern, such as .i oft x 100 ft) *:
i. All proposed vegetation clearing
z. Location of rip rap or fill to be placed above the Full Pond/'Formal Water Level elevation
I Location of rip rap or fill to be placed below the Full Pond/ Formal Water Level elevation
4. Location of any proposed structures such as buildings retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
5. Location of construction access corridors
-pS 1��- 7G
0oD
FORM: SSGP 10-2Q13
Page 3 of 3