Loading...
HomeMy WebLinkAbout20190745 Ver 3_Request for permit comments_20201109 November 6, 2020 MEMORANDUM FROM: Cathy Brittingham, DCM Transportation Project Coordinator c/o DWR Transportation Permitting Unit 1617 Mail Service Center, Raleigh, NC 27699-1617 Cathy.brittingham@ncdenr.gov SUBJECT: CAMA / Dredge & Fill Application Review – modification request Applicant: N.C. Department of Transportation, Ferry Division Project Location: Cape Fear River at NCDOT Ferry Basin, Brunswick/New Hanover County. Proposed Project: Request for a Modification of existing CAMA Major Permit 561 to allow reconstruction of the dock at the Southport Ferry Terminal that was heavily damaged during Hurricane Isaias. Please indicate below your agency’s position or viewpoint on the proposed project. Due to the NCDOT project schedule, your agency’s comments are requested as soon as possible at the mail/email address above. If you have any questions regarding the proposed project, please contact Cathy Brittingham at cathy.brittingham@ncdenr.gov or Stephen Lane at Stephen.lane@ncdenr.gov. When appropriate, in-depth comments with supporting data are requested. REPLY ___ This agency has no objection to the project as proposed. **Additional comments may be attached** ___ This agency has no comment on the proposed project. ___ This agency approves of the project, only if the recommended changes are incorporated. See attached. ___ This agency objects to the project for reasons described in the attached memo. PRINT NAME __________________________________________________________________ AGENCY __________________________________________________________________ SIGNATURE __________________________________________________________________ DATE _________________________________________________________________