Loading...
HomeMy WebLinkAbout20190745 Ver 3_CAMA - Request for Modification_20201109 Carpenter,Kristi From:Steenhuis, Joanne Sent:Monday, November 09, 2020 12:11 PM To:Carpenter,Kristi Subject:FW: CAMA Permit 561- Request for Modification- Southport Dock Reconstruction Attachments:CAMA Permit 561- Request for Modification- Dock Reconstruction Packet.pdf; Southport DEV_SMU_Utility_Pier_S04_090209.pdf; Request for permit comments.docx From: Brittingham, Cathy <cathy.brittingham@ncdenr.gov> Sent: Friday, November 6, 2020 2:25 PM To: Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil) <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Cc: Lane, Stephen <stephen.lane@ncdenr.gov> Subject: CAMA Permit 561- Request for Modification- Southport Dock Reconstruction Hello, I hope you are doing well! Please find attached 2 pdf files that constitute a permit modification request from NCDOT for CAMA Major Permit 561 to allow reconstruction of the dock at the Southport Ferry Terminal that was heavily damaged during Hurricane Isaias. Also please find attached in WORD a document requesting your agency’s comments. Due to the NCDOT project schedule, your agency’s comments are requested as soon as possible. Please let Stephen Lane or me know if you have any questions or need additional information. Sincerely, Cathy Brittingham Cathy Brittingham, Transportation Project Coordinator N.C. Division of Coastal Management (919) 707-9149 phone cathy.brittingham@ncdenr.gov Mailing Address: : c/o DWR Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Physical Address: 512 North Salisbury Street Archdale Building 12th Floor, Room 1204C 1 Raleigh, NC 27604 Please visit https://deq.nc.gov/about/divisions/coastal-management/ for more information about the N.C. Division of Coastal Management. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties 2