HomeMy WebLinkAbout20190745 Ver 3_CAMA - Request for Modification_20201109
Carpenter,Kristi
From:Steenhuis, Joanne
Sent:Monday, November 09, 2020 12:11 PM
To:Carpenter,Kristi
Subject:FW: CAMA Permit 561- Request for Modification- Southport Dock Reconstruction
Attachments:CAMA Permit 561- Request for Modification- Dock Reconstruction Packet.pdf;
Southport DEV_SMU_Utility_Pier_S04_090209.pdf; Request for permit comments.docx
From: Brittingham, Cathy <cathy.brittingham@ncdenr.gov>
Sent: Friday, November 6, 2020 2:25 PM
To: Shaver, Brad E SAW (Brad.E.Shaver@usace.army.mil) <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne
<joanne.steenhuis@ncdenr.gov>
Cc: Lane, Stephen <stephen.lane@ncdenr.gov>
Subject: CAMA Permit 561- Request for Modification- Southport Dock Reconstruction
Hello,
I hope you are doing well!
Please find attached 2 pdf files that constitute a permit modification request from NCDOT for CAMA Major
Permit 561 to allow reconstruction of the dock at the Southport Ferry Terminal that was heavily damaged during
Hurricane Isaias. Also please find attached in WORD a document requesting your agency’s comments.
Due to the NCDOT project schedule, your agency’s comments are requested as soon as possible.
Please let Stephen Lane or me know if you have any questions or need additional information.
Sincerely,
Cathy Brittingham
Cathy Brittingham, Transportation Project Coordinator
N.C. Division of Coastal Management
(919) 707-9149 phone
cathy.brittingham@ncdenr.gov
Mailing Address: :
c/o DWR Transportation Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Physical Address:
512 North Salisbury Street
Archdale Building
12th Floor, Room 1204C
1
Raleigh, NC 27604
Please visit https://deq.nc.gov/about/divisions/coastal-management/ for more information about the N.C. Division of
Coastal Management.
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties
2