HomeMy WebLinkAboutWQ0042072_Application (FTSE)_20201110Permit Number W00042072
Program Category
Non -discharge
Permit Type
Gravity Sewer Extension, Pump Stations, $ Pressure Sewer Extensions
Primary Reviewer
dean.hunkele
Coastal SWRuIe
Permitted Flow
Facility Name
Woodlands at Echo Farms Tract 2
Location Address
Owner
Owner Name
Cape Fear Public Utility Authority
Dates/Events
Scheduled
Orig Issue App Received Draft Initiated Issuance
10/22/2020
JL ,J-ouNTE
E N Co I N E E Ft I N C--
1 2 2 C I N E M A D R I V E
W I L M I N G T O N, N C 2 8 4 0 3
9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F)
T. F T T F. R O F T R A N S M T T T A L
OCT 2 2 2020 a f
To:
NCDE — Division of Water Resources
Date
I October 22, 2020
127 Cardinal Drive Extension
Wilmington, NC 28405
Re:
Woodlands at Echo Farms — Tract 2
Past Track Sewer System Ext. - Application
Attn:
To Whom It May Concern
Project No.
I 17358.PE
e are sendin
® Originals
® Prints
❑ Shop Drawings
❑ Calculations
❑ Correspondence
® Plans
❑ Specifications
® Other as listed below
he following items:
Quantity
Date
Dwg. No.
Description
2
Cover Letters
2
Fast Track Sewer App. & Supporting Docs. — Public Sewer (Orig. & Copy)
2
Flow Tracking for Sewer Extension App.
I
Application Fee - $480 (Check 12834)
1
07/28/20
CFPUA Approved Sewer Flow Letter
Issue Status: ® For Approval ❑ As Requested ❑ Construction ❑ Bid
❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks
ction Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit
❑ Rejected -See Remarks ❑ Approved as Submitted ❑ Other
Remarks:
Thank you for
your attention to this matter.
If you have any
questions, please contact Rob Balland at 910-791-6707 or rballand aramounte- n .com.
Cc: Signed: `__
Jerry Burks P. .
PARAMOUNTE
E N G I N E E R 1 N O I N C.
July 24, 2020
NCDEQ — DWR — Fast Track Sewer Extension
127 Cardinal Dr. Ext
Wilmington, NC 28405
RE: Woodlands at Echo Farms — Tract 2
NCAC 02T.0300 Fast Track Sewer System Extension
Cape Fear Public Utility Authority, New Hanover County, NC
To Whom It May Concern,
Enclosed is a public sewer extension application with supporting documentation for the proposed
residential development in the City of Wilmington. There are no proposed private sewer main extensions
as part of this project.
The proposed project will serve 54 new sewer connections, which will drain to an existing municipal
pump station and downstream sewer network.
The enclosed documents include the following items:
• Check in the amount of $480.00
• Fast Track Sewer System Extension Application
• Flow Tracking for Sewer Extension Applications
• Site Map
On behalf of Cape Fear Public Utility Authority and the developer, Cape Fear Commercial, we request
that you grant a permit for construction of this sewer system.
Sincerely,
Paramounte Engineering, Inc.
lr—�
.
Robert Balland, PE
President
12 2 C I N E M A D R I V E, W I L M I N D T D N, N❑ 26 40 3
P H 1 9 1❑ 1 7 9 1- 6 7❑ 7 F A X: 1 9 1 D 1 9 9 1' 6 9 6❑
State of North Carolina
DWR Department of Environmental Quality
Division of Water Resources
15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources 1' FTA 04-16 & SUPPORTING DOCUMENTATION
Application Number: W �G Wf)_01 Cy�d- (to be completed by DwR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Cape Fear Public Utility Authority (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Jeff Theberge, PE per 15A NCAC 02T .0106(b)
Title: Engineering Manager
4. Applicant's mailing address: 235 Government Center Drive
City; Wilmington State: NC Zip: 28403-_
5. Applicant's contact information:
Phone number: (910) 332-6673 Email Address: iefftheberge(a efpua.org
IL PROJECT INFORMATION:
1. Project name: Woodlands at Echo Farms - Tract 2
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: W000_ and issued date: _
If new construction but part of a master plan, provide the existing permit number: W000_
3. County where project is located: New Hanover
4. Approximate Coordinates (Decimal Degrees): Latitude: 34.1659' Longitude:-77.9325'
5. Parcel ID (if applicable): R07006-002-001-000
(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Rob Balland License Number: 31591
Firm: Paramounte Engineering, Inc.
Mailing address: 122 Cinema Drive
City: Wilmington State: NC Zip: 28403-
Phone number: (910) 791-6707 Email Address: rballand(@naramoume-eng.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Southside WWTP Permit Number:
Owner Name: Cape Fear Public Utility Authority
V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF):
1. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: _ inch
System Wide Collection System Permit Number(s) (if applicable): WQCS_
Owner Name(s):
FORM: FTA 04-16 Pagel of 5
VI. GENERAL REQUIREMENTS
I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Develooer's Operational Agreement (FORM: DEVI been attached?
❑ Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM: HOA) been attached?
❑ Yes ❑No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 100 % Domestic/Commercial _% Commercial
_ % Industrial (See 15A NCAC 02T .0103(20))
"Is there a Pretreatment Program in effect? ❑ Yes ❑ No
6. Hasa flow reduction been approved under I5A NCAC 02T .0114(fl? [-]Yes ®No
➢ If provide a copy of flow reduction approval letter
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(t))
Daily Design Flow a °
No. of Units
Flow
Single Family Residence
360 gal/connection
54
19,440 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
19,440 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A-4).
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 19,440 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, indicate why:
❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line
❑ Flow has already been allocated in Permit Number:
❑ Rehabilitation or replacement of existing sewer with no new flow expected
❑ Other (Explain): _
FORM: FTA 04-16 Page 2 of 5
VIL GRAVITY SEWER DESIGN CRITERIA (if Applicable) - 02'r .0305 & MDC (Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size (inches)
Length (feet)
Material
8
2,009
C-900 PVC
8
243
DIP
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC
VIll. PUMP STATION DESIGN CRITERIA (if Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: -
3. Design flow of the pump station: _ millions gallons per day (firm capacity)
4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1):
❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility
Or if the pump station has an average daily flow less than 15,000 gallons per day:
❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T
.0305(h)(1)(C)
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C):
➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement)
and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided
in the case of a multiple station power outage.
FORM: FTA 04-16 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) N Yes ❑ No
➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below vertical
24 inches
Water mains vertical -water over sewer including in benched trenches
18 inches
Water mains horizontal
10 feet
Reclaimed water lines vertical - reclaimed over sewer
18 inches
Reclaimed water lines horizontal - reclaimed over sewer
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water or tide elevation and wetlands see item IX.2
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches
10 feet
Any buildina foundation
5 feet
Any basement
10 feet
Top sloe of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade vertical
36 inches
➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved.
➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications weboage
➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application
2. Does the project comply with separation requirements for wetlands? (50 feet of separation) N Yes [:]No ❑ N/A
➢ Seethe Division's draft separation requirements for situations where separation cannot be meet
➢ No variance is required if the alternative design criteria specified is utilized in design and construction
➢ As built documents should reference the location of areas effected
3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? N Yes ❑ No ❑ N/A
➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202
4. Does the project require coverage/authorization under a 404 Nationwide or N Yes [:]No
individual permits or 401 Water Quality Certifications?
➢ Information can be obtained from the 401 & Buffer Permitting Branch
5. Does project comply with 15A NCAC 02T.0105(c)(61(additional permits/certifications)? N Yes ❑ No
Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have
been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and
sedimentation control plans, stormwater management plans, etc.).
6. Does this project include any sewer collection lines that are deemed "high -priority?'
Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer
positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer.
❑ Yes N No ❑ N/A
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections
documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit.
FORM: FTA 04-16 Page 4 of 5
ESN�1:)IIL!aLNS11[ &IT
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permittingof f Pump Stations
land Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for
review. Approval of the request is required prior to submittal of the Fast Track Anplication and sunnortina documents.
2. Professional Engineer's Certification:
Item 111.1
that this application for
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications,
engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best
of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer
Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6E, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation.
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I Jeff Theberge, Engineering Manager attest that this application for
(Signature Authority's name & title from Application Item 1.3.)
has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of
this application are not completed and that if all required supporting documentation and attachments are not included, this
application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non -
discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties,
injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition
of this permit be violated. I also understand that if all required parts of this application package are not completed and that if
all required supporting information and attachments are not included, this application package will be returned to me as
incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6E;, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
Signature: ���Qit�2 Date: 8/27/2020
FORM: FTA 04-I6 Page 5 of
SITE COORDINATES:
340 09 56.3" N
� u �_. .-•�`/S - .! r "� 77 55 56.5" W
D8`e 1,2DD USGS MAP
PARAMOUNTE oe� AEC20�
122Q-]Dd%W rc28403t9,0�791-67T Chk RPS Woodlands at Echo Farms
NC lkmre #: C-2846 P'q No: 17358.PE
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications
(FTSE 10-18)
Entity Requesting Allocation: Echo Farms, LLC
Project Name for which flow is being requested: Woodlands at Echo Farms - Tract 2
More than one FTSE maybe required for a single project if the owner of the WWTP is not responsible for ali pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Southside WWTP
b. WWTP Facility Permit #: NC0023973
c. WWTP facility's permitted flow
d. Estimated obligated flow not yet tributary to the WWTP
e. WWTP facility's actual avg. flow
f. Total flow for this specific request
g. Total actual and obligated flows to the facility
h. Percent of permitted flow used
All flows are in MGD
12.00
2.561
8.044
0.019440
10.625
88.5
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A)
(B)
(C)
(D)=(B+C)
(E)=(A-D)
Design
Average
Approx.
Obligated,
Pump Pump Daily
Current
Not Yet
Total Current
Station Station Firm Flow**
Avg. Daily
Tributary
Flow Plus
(Name or Permit Capacity, * (Firm / pt),
Flow,
Daily Flow,
Obligated
Available
Number) No. MGD MOD
MGD
MGD
Flow
Capacity***
36 WQ0038099 2.664 0.888
0.353
0.213
0.566
0.322
* The Firm Capacity (design flow) of any pump
station is defined as the maximum
pumped
flow
that can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor
(pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Cape Fear Public Utility Authority
Downstream Permit Number:
Page 1 of 6
FTSE 10-18
III. Certification Statement:
I Jeff Theberge, PE certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
10/19/2020
Official Signature Date
Engineering Manager
Title of Signing Official
Page 2 of 6
FTSE 10-18