Loading...
HomeMy WebLinkAboutNCC200346_MODIFICATION Supporting Documents (Lots Closed Out)_20201110North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Davidson Project: Maple Leaf Village Offsite Septic Fields River basin: Yadkin-PeeDee Person financially responsible: D.R. Horton, Inc. - Jessica Meyer, Erosion Control Project #: DAVID-2020-037 Manager Address: 4150 Mendenhall Oaks Pkwy, Suite 100, High Point, 1. Project Location: Harvey Teague Rd, Winston-Salem Pictures: Yes - Digital 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Marty Jones Inspection report: Sent Report 9. Corrective action needed: Title: D.R. HORTON Date given/sent: November 09, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. Reported by: Blane Houck Others present: Date of inspection: November 04, 2020 Time arriving on site: 9:00 AM Time leaving site: 10:00 AM cc: