Loading...
HomeMy WebLinkAbout20091322 Ver 1_Certification of Completion_20100528J Lynn Caldwell DWQ# 09-1322 reissuance May 11, 2010 Page 4 of 4 tw? I o uA-@V9'J, MAY ^ ?psi) OBIR.WAZR OJAUTY WETLAWS AND STORLMr.vER DRANC 1 DWQ Project No.: 09- X322 County: /?%fe?ar1 Applicant: A4-fi pwci/ ?c?nrn.`f}ee 4-r -d? Al&a ?'?re? Project Name: Ole cr1 4/ vev Se- i??t /' ?- - e?/, 'vC f Tr a-cc Date of Issuance of 401 Water Quality Certification: tl Lyi 17, 2,91 0 fe;sc4,cea? /W tar d Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40] /Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: A 's ertifrcatioll ,gaz . -u , hereby state that, to the best of my abilities, due care and diligenp? as used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Date:, (e, a D d Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date CWMTF 2008-409 Restoration South Fork New River at New River State Park, Oliver Tract Oliver Tract 5-24-10