HomeMy WebLinkAbout20091322 Ver 1_Certification of Completion_20100528J
Lynn Caldwell
DWQ# 09-1322 reissuance
May 11, 2010
Page 4 of 4
tw? I o
uA-@V9'J,
MAY ^ ?psi)
OBIR.WAZR OJAUTY
WETLAWS AND STORLMr.vER DRANC 1
DWQ Project No.: 09- X322 County: /?%fe?ar1
Applicant: A4-fi pwci/ ?c?nrn.`f}ee 4-r -d? Al&a ?'?re?
Project Name: Ole cr1 4/ vev Se- i??t /' ?- - e?/, 'vC f Tr a-cc
Date of Issuance of 401 Water Quality Certification: tl Lyi 17, 2,91 0
fe;sc4,cea? /W tar d
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the 40] /Wetlands Unit,
North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form
may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applicant's Certification
hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Signature:
Date:
A 's ertifrcatioll
,gaz . -u , hereby state that, to the best of my abilities, due care and
diligenp? as used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved
plans and specifications, and other supporting materials.
Date:, (e, a D d
Engineer's Certification
Partial Final
I, , as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature
Registration No.
Date
CWMTF 2008-409
Restoration South Fork New River at New River State Park, Oliver Tract
Oliver Tract 5-24-10