Loading...
HomeMy WebLinkAbout20140090 Ver 7_November inspection_20201110 Wetland Inspection Report Project Num: 20140090 Version: 7 Status: Issued Project Name: NCDOT-US 158 (U-2579B) Project Type: Road County• Forsyth intena c /repair/improveme Region: nston- ayem Location: NCDOT-US 158 (U-2579B) Latitude: +360 07' Longitude: -80' 07' 55" SW Plan Location: Site Owner Name: NC DOT PDEA Inspection Date: 11/5/2020 Reason for Inspection: Routine Inspection Type: Site Inspection(DOT) Inspection Contact Person: Title: Phone: On-Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit(401 WQC) Inspection Summary: page 1 Site Number: 20140090 Owner: Thorpe,Greizory Inspection Date: 11/5/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine Permit(401 WOO Yes No NA NE Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I reviewed several project impact sites along with DOT staff,Roadside and the Corps. We reviewed Sites 2,4,5,8,11,12,11a,18 and 9. All sites were built to plans and functioningas s designed. Site 8 outlet, which was slightly perched at the sill,was remediated several, ergo per WRC and DWR by placing riprap at the sill to lessen the perch. It appears to be functioning well with no instability. Vegetation/cover is flourishing in all completed areas. page 2