HomeMy WebLinkAbout20140090 Ver 7_November inspection_20201110 Wetland Inspection Report
Project Num: 20140090 Version: 7 Status: Issued
Project Name: NCDOT-US 158 (U-2579B) Project Type: Road
County• Forsyth intena c /repair/improveme
Region: nston- ayem
Location: NCDOT-US 158 (U-2579B)
Latitude: +360 07' Longitude: -80' 07' 55"
SW Plan Location:
Site Owner Name: NC DOT PDEA
Inspection Date: 11/5/2020
Reason for Inspection: Routine
Inspection Type: Site Inspection(DOT)
Inspection Contact Person: Title: Phone:
On-Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit(401 WQC)
Inspection Summary:
page 1
Site Number: 20140090 Owner: Thorpe,Greizory
Inspection Date: 11/5/2020 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine
Permit(401 WOO Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: I reviewed several project impact sites along with DOT staff,Roadside and the Corps. We reviewed
Sites 2,4,5,8,11,12,11a,18 and 9. All sites were built to plans and functioningas s designed. Site 8 outlet,
which was slightly perched at the sill,was remediated several, ergo per WRC and DWR by placing
riprap at the sill to lessen the perch. It appears to be functioning well with no instability.
Vegetation/cover is flourishing in all completed areas.
page 2