Loading...
HomeMy WebLinkAboutSW1200501_Calcs (Stage-storage) (2)_20201109 Stage Storage Calculations Project #:19.00154 Project Name:Fairview Elementary Car Rider Road Date:8/6/2020 By:N Sawyer Basin Name:Bio Retention Cell #2 Contour ElevationContour Area (sf)Depth (ft)Incremental Volume (cf)Cumulative Volume (cf) 22702793.6N/AN/AN/A 22713471.5613132.583132.58 22724206.0713838.826971.40 Minimum Volume Required for Design Storm of 1" = 1847 cu.ft. or 58% of the actual volume at 12" of ponding. 12" x .58% = 6.96" or .58' Elevation of the 1" design storm = 2270.58 Buncombe Co. Pre vs Post 1 yr, 24 hour event, Volume to be treated = 3048 cu.ft. or 97% of the actual volume at 12" of ponding. 12" x 97% = 11.64" or .97' Elevation of the treated volume = 2270.97