HomeMy WebLinkAbout20201536 Ver 1_Buffer Determination_20201106ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Pantheon Manufacturing Services, LLC
ATTN: Natalie Brown
5900 Martin Luther King Jr. Highway
Greenville, North Carolina 27834
NORTH CAROLINA
Environmental Quality
November 6, 2020
2020-1536 v1 (Express)
Pitt County
Subject: On -Site Determination for Applicability to Tar -Pamlico Riparian Buffer Rules (15A NCAC 02B .0734)
(EXPRESS program)
Subject Property/ Project Name: ThermoFisher Site Improvements
Address/Location: 5900 Martin Luther King Jr. Highway, Greenville, North Carolina
Stream(s) Evaluated: (1) — UT to Parker Creek, Class C, NSW; Stream Index 28-95; Tar -Pamlico River Basin
Determination Date: November 4, 2020
Staff: Chris Pullinger
Determination Type:
Buffer:
Stream:
❑ Neuse (15A NCAC 02B .0714)
❑ Intermittent/Perennial Determination
® Tar -Pamlico (15A NCAC 02B .0734)
❑ Catawba (15A NCAC 02B .0614)
❑ Jordan (15A NCAC 02B .0267) (governmental
and/or interjurisdictional projects)
❑ Randleman (15A NCAC 02B .0724)
❑ Goose Creek (15A NCAC 02B .0605-.0608)
Stream
E/I/P*
Not
Subject
Subject
Start@
Stop@
Soil
Survey
USGS
Topo
2020-1536
E
X
2020-1536 Start
2020-1536 Finish
X
X
*E/1/P = Ephemeral/Intermittent/Perennial
The Division of Water Resources has determined that the streams listed above and included on the attached map
have been located on page 26 of the most recent published (1974) NRCS Soil Survey of Pitt County, North Carolina
and/or the most recent copy of the Greenville NE USGS Topographic map at a 1:24,000 scale and evaluated for
applicability to the Tar -Pamlico Riparian Buffer Rule. Each stream that is checked "Not Subject" has been
determined to not be at least intermittent or not present on the property. Streams that are checked "Subject"
have been located on the property and possess characteristics that qualify them to be at least intermittent
streams. There may be other streams or features located on the property that do not appear on the maps
referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and subject to
the Clean Water Act.
D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
NORTH CAROLINA -
oePanmem of Environmental Quality /� 252.946.6481
This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties
that dispute a determination made by the DWR may request a determination by the Director. An appeal
request must be made within sixty (60) calendar days of date of this letter to the Director in writing.
If sending via US Postal Service:
c/o Paul Wojoski
DWR — 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
If sending via delivery service (UPS, FedEx, etc.):
clo Paul Wojoski
DWR — 401 & Buffer Permitting Unit
512 N. Salisbury Street
Raleigh, NC 27604
This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days.
This determination only addresses the applicability to the buffer rules and does not approve any activity
within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any
inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of
Engineers Raleigh Regulatory Field Office at (910)-251-4629.
If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3918.
Sincerely,
Plow TR..t.•,
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: WaRO DWR File Copy/LASERFICHE
Natalie Brown, Pantheon Manufacturing Services, LLC (via e-mail: Natalie. brown @thermofisher.ccom)
Michelle Clements, The East Group (via e-mail: Michelle.clements@eastgroup.com)
Emily Thompson, USACE Washington Field Regulatory Office (via e-mail)
Randall Jones, WaRO DEMLR (via e-mail)
Lyn Hardison, One Stop Permitting — WaRO (via e-mail)
MPF-
2-020-01a36 �1 Start
2020-1536 ,1,�p pe.inlet
202/0-1536 V1 pipe outlet waa
y 2020-1536 v1 Finish '
N f Jj
40
kw
e
Bb .:.
AgB
\ GOB r'r
Ro
4 1 WaB
` C+7 T u ��` — - -- -- ---- — — —'
VPRa
oA
o LOA
L A '
B
ExA
W �r
aB
o
a 0 Bd
o B „
ExA
o
Tu Vila B
r-1 V1 pipe inlek
1 p'petlet0- v1 Finish
9133