Loading...
HomeMy WebLinkAbout20201536 Ver 1_Buffer Determination_20201106ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director Pantheon Manufacturing Services, LLC ATTN: Natalie Brown 5900 Martin Luther King Jr. Highway Greenville, North Carolina 27834 NORTH CAROLINA Environmental Quality November 6, 2020 2020-1536 v1 (Express) Pitt County Subject: On -Site Determination for Applicability to Tar -Pamlico Riparian Buffer Rules (15A NCAC 02B .0734) (EXPRESS program) Subject Property/ Project Name: ThermoFisher Site Improvements Address/Location: 5900 Martin Luther King Jr. Highway, Greenville, North Carolina Stream(s) Evaluated: (1) — UT to Parker Creek, Class C, NSW; Stream Index 28-95; Tar -Pamlico River Basin Determination Date: November 4, 2020 Staff: Chris Pullinger Determination Type: Buffer: Stream: ❑ Neuse (15A NCAC 02B .0714) ❑ Intermittent/Perennial Determination ® Tar -Pamlico (15A NCAC 02B .0734) ❑ Catawba (15A NCAC 02B .0614) ❑ Jordan (15A NCAC 02B .0267) (governmental and/or interjurisdictional projects) ❑ Randleman (15A NCAC 02B .0724) ❑ Goose Creek (15A NCAC 02B .0605-.0608) Stream E/I/P* Not Subject Subject Start@ Stop@ Soil Survey USGS Topo 2020-1536 E X 2020-1536 Start 2020-1536 Finish X X *E/1/P = Ephemeral/Intermittent/Perennial The Division of Water Resources has determined that the streams listed above and included on the attached map have been located on page 26 of the most recent published (1974) NRCS Soil Survey of Pitt County, North Carolina and/or the most recent copy of the Greenville NE USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the Tar -Pamlico Riparian Buffer Rule. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or not present on the property. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify them to be at least intermittent streams. There may be other streams or features located on the property that do not appear on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 NORTH CAROLINA - oePanmem of Environmental Quality /� 252.946.6481 This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski DWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.): clo Paul Wojoski DWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days. This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Raleigh Regulatory Field Office at (910)-251-4629. If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3918. Sincerely, Plow TR..t.•, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: WaRO DWR File Copy/LASERFICHE Natalie Brown, Pantheon Manufacturing Services, LLC (via e-mail: Natalie. brown @thermofisher.ccom) Michelle Clements, The East Group (via e-mail: Michelle.clements@eastgroup.com) Emily Thompson, USACE Washington Field Regulatory Office (via e-mail) Randall Jones, WaRO DEMLR (via e-mail) Lyn Hardison, One Stop Permitting — WaRO (via e-mail) MPF- 2-020-01a36 �1 Start 2020-1536 ,1,�p pe.inlet 202/0-1536 V1 pipe outlet waa y 2020-1536 v1 Finish ' N f Jj 40 kw e Bb .:. AgB \ GOB r'r Ro 4 1 WaB ` C+7 T u ��` — - -- -- ---- — — —' VPRa oA o LOA L A ' B ExA W �r aB o a 0 Bd o B „ ExA o Tu Vila B r-1 V1 pipe inlek 1 p'petlet0- v1 Finish 9133