Loading...
HomeMy WebLinkAbout20201391 Ver 1_PreFiling Email 30-Day Clock Reached Email_20201105Strickland, Bev From: laserfiche@ncdenr.gov Sent: Thursday, November 5, 2020 12:01 AM To: donaldcauble@gmail.com Cc: Johnson, Alan Subject: Pre -Filing Time Clock has been reached for CAUBLE Shoreline rip rat overcoat - CAUBLE Shoreline rip rat overcoat - 20201391 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for CAUBLE Shoreline rip rat overcoat that you submitted on 10/5/2020. The I D number for that project is 20201391, Version 1 Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored 1 ID#* 20201391 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/5/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Donald Cauble donaldcauble@gmail.com CAUBLE Shoreline rip rat overcoat Donald Cauble Iredell Street Address 144 Carlton Drive Address Line 2 aty Mooresville Rbstal / Zip Code 28117 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country United States Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson I believe. Do not know anyone but him so far. Please give a brief project description below. * The original and last time the shoreline stabilization was completed on this lot was the late 80's/ early 90's. We are wanting to put an overcoat of riprap over the existing riprap on the shoreline. There is no buffer clearing or work that needs to be done except the overcoat of the existing shoreline. There is also a 10', flat, grass path around the entire shoreline that the work will be done from as well as a drive that goes from Carlton to the water. All work will be completed from land and none from the water. There is approximately 300' of shoreline to have the refresher coat. A new dock was completed last year and has already received its Duke Energy license tag. Please give a couple of dates you are available for a meeting. 10/20/2020 10/21 /2020 10/22/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/5/2020