HomeMy WebLinkAbout20100405 Ver 1_401 Application_20100510L LAND MANAGEMENT GROUP ixc.
Environmental Consultants
TO: Mr. Richard Spencer
U.S. Army Corps of Engineers
69 Darlington Avenue
Wilmington, NC 28403
May 25, 2010
20100405
(;Ou RTESY
COPY
L?Le0ty/
AV j
f?IA I 6 ZG 10
WETL1,AND STORWA ER 8"CH
RE: NWP 39 Application; Sewer Upgrades for FORSCOM Headquarters Building
Old North Utility Services, Inc.
Fort Bragg; Cumberland County, NC
Dear Mr. Spencer:
Enclosed is a NWP 39 application for your review. This application is submitted on
behalf of Old North Utility Services, Inc. for the open-cut installation of two wastewater lines
that will be located within an existing utility easement in Fort Bragg. These lines are needed to
upgrade services for the new FORSCOM Headquarters building. Two existing sewer lines will
be discontinued. Temporary impacts include 0.059 acres of 404 wetlands and 30 LF of stream.
Additionally, 0.008 acre of 404 wetlands and 0.001 acre of RPW will be permanently impacted.
The easement is currently mowed, therefore, no mitigation is proposed.
The Pre-Construction Notification form, associated maps, and site plan are enclosed for
your review. Please contact me if you have any questions. Thank you for your assistance with
this project.
Sincerely,
Kim Williams
Wetland Scientist
Encl.
C: Ms. Heather Adams, ONUS
Mr. Phil Weaver, Pope Air Force Base
Mr. Mike Zaccardo, CE Group, Inc.
t Mr. Chad Turlington, DWQ
Mr. Ian McMillan, DWQ
www.lmgroup.net • info@lmgroup.net • Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403 • P.O. Box 2522, Wilmington, NC 28402
20100405
OF WAT??Q
? r
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A.
Applicant Information CC
COU RTES
1. Processing
1 a. Type(s) of approval sought from the
Corps:
® Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply): N/A
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
1e. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
® Yes ? No For the record only for Corps Permit:
? Yes ® No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: Sewer Upgrades for FORSCOM Headquarters Building
2b. County: Cumberland County p *p n
2c. Nearest municipality / town: Fort Bragg it
2d. Subdivision name: N/A MAY 2 6 ZDj
2e. NCDOT only, T.I.P. or state
project no: N/A OENR-WATER QUALITY
3. Owner Information
3a. Name(s) on Recorded Deed: Sewer line is an easement located within Fort Bragg/Pope Air Force Base
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner):
4a. Applicant is: ? Agent ® Other, specify: Contractor
4b. Name: Ms. Heather Adams
4c. Business name
(if applicable): Old North Utility Services, Inc.
4d. Street address: 110 North 4th Street
4e. City, state, zip: Spring Lake, NC 28390
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: Kim Williams
5b. Business name
(if applicable): Land Management Group, Inc.
5c. Street address: 3805 Wrightsville Avenue, Suite 15
5d. City, state, zip: Wilmington, NC 28403
5e. Telephone no.: (910) 452-0001
5f. Fax no.: (910) 452-0060
5g. Email address: kwilliams@lmgroup.net
Page 2 of 11
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): Project area is located within easement
1 b. Site coordinates (in decimal degrees): Latitude: 35.177012 N Longitude: -78.998742 W
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: Easement: 30'x 9000' (6.2 ac)
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to Tank Creek
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: Cape Fear 03030004
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
The project area consists of an existing utility easement that currently contains two wastewater lines (30" and 15"
diameter). These lines deliver wastewater to the Fort Bragg Wastewater Treatment Plant located just north of the corridor.
The existing easement is currently kept in a mowed condition.
3b. List the total estimated acreage of all existing wetlands on the property:
< 0.5 acre within project area
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
-- 30 feet (easement crosses Tank Creek)
3d. Explain the purpose of the proposed project:
The purpose of the project is to upgrade the existing wastewater services for the new FORSCOM Headquarters building.
The two existing lines will be discontinued.
3e. Describe the overall project in detail, including the type of equipment to be used:
This project entails the installation of two new wastewater lines (.42" and 24" diameter) Silt fences will be installed along
the corridor. Excavators will be used to dig a trench and the pipe will be installed in sections. Material will be stockpiled in
an upland area and placed back once the pipe is in place. Most wetland areas will be returned to grade and seeded.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ® Yes ? No ? Unknown
project (including all prior phases) in the past?
Comments:
4b. If the Corps made the jurisdictional determination, what type
? Preliminary [E Final
of determination was made?
Agency/Consultant Company:
4c. If yes, who delineated the jurisdictional areas? Land Management Group, Inc.
Name (if known): Corey Novak
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Richard Spencer with the ACOE approved the wetland line in the field on 5/11 /10.
5. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
N/A
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
N/A
Page 4 of 11
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ? Buffers
® Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact
number -
Type of impact
Type of wetland
Forested Type of jurisdiction
(Corps - 404, 10
Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ?P®T Installation of
utility line Non-Riparian El Yes
®No ® Corps
®DWQ 0.059
W2 ®P ? T Installation of
utilit
y line
Non-Riparian El Yes
® No ® Corps
El DNQ 0.008
? Yes ? Corps
W3 ? P ®T ?No ?DWQ
? Yes ? Corps
W4 ? P ? T ? No ? DWQ
El Yes El Corps
W5 ? P ? T ? No ? DWQ
? Yes ? Corps
W6 ? P ? T ? No ? DWQ
2g. Total wetland impacts 0.067
2h. Comments: Impacts will occur within an existing easement.
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
S1 ? P ®T Installation of
utility line Tank Creek ® PER
? INT ® Corps
® DWQ 10 30
? PER ? Corps
S2 ? P ? T ? INT ? DWQ
? PER ? Corps
S3 ? P ? T ? INT ? DWQ
3h. Total stream and tributary impacts 30
3i. Comments:
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts:
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individual) list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water
impact number - Name of waterbody
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary T
01 ®P ? T N/A Installation of Utility Line RPW 0.001
02 ?P?T
03 ?P?T
04 ?P?T
0. Total open water impacts 0.001
4g. Comments: Impact 01 is grouped with Wetland Impact #2 on drawings.
5. Pond or Lake Construction: N/A
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ): N/A
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number - Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary (T) impact required?
?Yes
B1 ?P?T ? No
? Yes
B2 ? P ? T ? No
?Yes
B3 ?P?T ? No
6h. Total buffer impacts
6i. Comments:
Page 6 of 11
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Most of the impacts to wetlands and stream will be temporary in nature. These jurisdictional areas will be returned to
natural grade and will be seeded with a wetland seed mix upon project completion. One impact, W2/01, will be
permanent in order to achieve the correct slope for this gravity driven sewer line. This impact has been minimized as
much as possible. The applicant plans to abandon the existing sewer lines. Much of these lines are located in wetlands
and removing or replacing these lines would disturb more wetlands than simply abandoning them.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Silt fencing will be installed to prevent erosion into adjacent wetland areas and to clearly demarcate limits of authorized
disturbance. Most wetland impacts will be returned to grade and seeded. The contractor will use logging mats in wetter
areas to minimize compaction in these sections.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank: N/A
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program: N/A
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: N/A
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): N/A square feet
4e. Riparian wetland mitigation requested: N/A acres
4f. Non-riparian wetland mitigation requested: N/A acres
4g. Coastal (tidal) wetland mitigation requested: N/A acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan: N/A
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required. NIA
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
NIA
6h. Comments: N/A
Page 8 of 11
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
? Yes ? No
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? No impervious except for a few
manholes
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why:
No impervious cover is associated with the installation of the sewer line except for a few manholes.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review: N/A
3a. In which local government's jurisdiction is this project?
? Phase II
? NSW
3b. Which of the following locally-implemented stormwater management programs ? USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review: N/A
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply):
? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review: N/A
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ® No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes ? No
letter.)
Comments:
2. Violations (DWQ Requirement)
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
2a
.
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
N/A
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
A new wastewater line will be installed to replace two existing lines. The service area will not be expanded.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
The line will tie into the Fort Bragg WWTP.
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
? Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
The NC Natural Heritage Program GIS layer was used to determine the presence of federally listed species. No federally
protected species in or near the site were noted. Several state-listed rare plant species have been sighted near the
project area. However, none of these species are protected and none appear to be located within the project area.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
The NOAA Fisheries Essential Fish Habitat Mapper GIS program was used to determine the presence of Essential Fish
Habitat. The project area is not considered EFH.
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
The National Trust for Historic Preservation website mapping resource was used to determine the presence of cultural
resources. No cultural resources were found.
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? The NC Floodplain Mapping Information System
website was used to determine the boundaries of the 100-year floodplain.
Kim Williams IV_v,x' /jam-- 05/25/2010
ApplicanUAgent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 11 of 11
AGENT AUTHORIZATION FORM
TO WHOM IT MAY CONCERN:
Uwe, the undersigned, hereby authorize Land Management Group, Inc. to act as our went in the
preparation and representation of information related to the permit application for the
FORSCOM HQ Utility Line project at Fort Bragg. All questions in regards to this proJect should
be directed to Land ManacTement Group, Inc.
Sincerely,
?f ,,I`
'gym F"- sue. :.? y
OwneilApplicant
Print Name
/ r
' Date
24
87
r` _5
600
'? i? 4a \ $
-f6la d BR-A( k(
i
SITE rt?"?`??,?
A'IR ; €- A,5 N-u ? aM-' and
lit,
Yw
len
R)
i
nd Ai
210 `7-
i,
Tex
arft???
*Boundaries are approximate and are
not meant to be absolute
Map Source: North Carolina Atlas & Gazetteer. Pg 61.2003 SCALE 1" = 1 Mile
FORSCOM HQ LMG
Sewer Line Upgrades Figure 1
www.LMGroup.net Vicinity Map
Cumberland County, NC Phone: 910.452.0001.1.866.LMG.1078
March 2010 Fax: 910.452.0060
P.O. Box 2522, Wilmington, NC 284n2
Map Source: Manchester & Overhills Quadrangles 7.5 minute (topographic) 1990
SCALE 1" = 1200'
FORSCOM HQ LMG
Sewer Line Upgrades 14\r"" ? , Figure 2
?www.LMGroup.net USGS Topographic Map
Cumberland County, NC Phone: 910.452.0001 •1.866.LMG.1078
March 2010 Fax: 910.452.0060
P.O. Box 2522, Wilmington, NC 28402
not meant to be absolute.
I
r
*Boundaries are approximate and are
not meant to be absolute.
Map Source: NRCS Soil Survey. SCALE 1" - 1000'
FORSCOM HQ LMG
Sewer Line Upgrades k, MA Figure 3
www.LMGroup.net Soils Map
Cumberland County, NC Phone: 910.452.0001 •1.866.LMG.1078
March 2010 Fax: 910.452.0060
P.O. Box 2522, Wilmington, NC 28402
Map Source: 2008 NAPP Aerial Photography
SCALE 1" = 1000'
FORSCOM HQ LMG
Sewer Line Upgrades _ Figure 4
www.LMGroup.net Aerial Photograph
Cumberland County, NC Phone: 910.452.0001 •1.866.LMG.1078
March 2010 Fax: 910.452.0060
P.O. Box 2522, Wilmington, NC 28402
not meant to be absolute.
6£L -? # aeua?q eugoJeD y4JoN 00
16L4- L9E (6 i 6) -FA 06L4-LDE (616) -1-11 OO J 7,??s o
41 SLZ '0 N ! -7 '01 b 93'^S 'Ae"Wd A?"? J 0001 1 1 v 11 ?i
Cclq
) ?D N 1\-.-A n s a N `d-I
ddW 1C)ddW1 aNVIJL3M =U) O
E:)N I N N`d-lcA a N`d-1 ZV I O N110 89Z8.O,LO.OO9OdS 'ON 103f Oad oz
S3OIAb3S tamin HIHON alO JO; z0 w
dnoij Q =
dnW IDVd W I a N-VI13M llYH3AO Z cn
z Q ¢ O
w ? W 3 3
U 3 cn U a
w
C Q
U
Q
w a
co Z
a N M co N W
LL LL LL ,. F
6) Lo, Q?
yO9 L (/J J a fn Cl)
J
S J
r
? r w
y
V
Q
CL
2
Q
tis ? ? D
't Z
•r
t O
U-
0
N
w
w
7
CL }
?? Q r
? • ,t
2 l1! Z Lf. F
2 MIg1EP?s j . z
O FR .a? ???13b
a
w w > •\
W y Z 1
O
LL.
? I
6£L 1 -0 N aeuGOII eullGJe' 44JONj
ww _ w z co
16L4-L9£(6f6)xed OGLB'L9£(616)-I0A 0Y �`
815LZ '0 N '&eD'014 03"g'1-'I'e,J A—F'� 000; 1 1 fr 11 V O
�I�IIJ.�/�ZInS aNd-104
L ddW 1OddW1 dNd"113M =U) O
JNI���NIJN� -II/WD
�N I N N`d-1�J Cl N`d-1 L'b LO NICO 8SZ8.3-ZO-009OdS 'ON 103f oUd �z
�u S301AU3S A.Lnun HIUON 0'10 JOI � zco w
dno.zq Q =
L# dnW lOdd W 1 0 N�J.3M Z m
1
1
W Z 1 1
LLj LU1 1
3: o= 1
} z0 ; 1
1
F-Q�J
cc J_ J Q
Q Q W 1 1 w
ZOLu �m 1 1 Q
I-wQ 1 o u 1 N C14 U
�jZU� + 1 Lr)O lfi
Q O 1z Lr)
LU I� 1 N 1
1 co CL
co
n O�
Q. N
� �
1 w uj
F-
1
LLJ}
F
J
_jOW
❑�z u
W J Q
OWo
U 1
zwcn u
a- W❑
At
� � z
1 + o
a� a
U
Z U Q
W Q 1 s
c°jo
co <
QW 1 r
U) i
1 x U vi
z Im a-oo
J a LQ
Q 1 q N Q
F- >- N QLOQ�' n
W F- m JaHQ
W J
0.
W Lu Lu — 0-1
W
U \ ' > F- Q
Z
F- J
x
W J m
z
z T 7F F-
1 w
F-
CD U �
m d � ❑
co Z cv
1 Q
\ L W
+ 1 t E
Q F- 1 F-
F-
�� U
a
2
1 �
n �
0 00
Q 1
w } o
Q PRM m LLJz
O oto T��0 1
CL
W W
Sw
ui
a O >�
< m d
07 O
LI) O�
O p O p O� O� (O N c0 I�
07 r I� N O
� O'� I� O p � cri c") N a0 a0 O N � � N
Z_ �p � OJ 07 00 I� O � � d' � M N N M N O p
O p 0 0 0 0 0 0 0 0 0 p O 0 0 0 0 0 p
~ 00 M O O p 00 O p a0 O O p O O p O O�
� m p p p p p (030, p p p p p p p O O p O p
Q� rn rn rn� rn rn rn�rn� a) (M
p p r t0 00 It f� � M
W � � N tC) N � 00 O_ ti p O � � (D CO � O � N
Z � (00 � � � N O N � � M O � � M � � � �
III M � 117 � O ON � � O N N N In �
O N N N N N N N N N N N N N N N N N N
O
N
Z Z
� d
C7 Q Q �
Q � Q � O N_ M_ V �_ Z
LL
m
p
m
a? 1
0
0
d7
w
J
w
z
w
b3AOO 31OHNV/
1HJ11 ?131`dM H11A
8o'L96=1nOW
80'L96=NIW
9Z'SL6=W1,
w
0
0
Oo
U o
H
O ca)
=w
w J
N CD
?' ch
lO`d_d W 14 NVT
ON3 9£'8Z+8L =
E-
>- Q
wC? a
O :5.2
CL Z
W J
w
w
0
z?
Q
zw
?a
Xm
wa
a
f- F}-
Q
Z
J ?
J
a
O
U d
wo
N
U
z >
Q w
H3AOO 31OHNVIN
( 1HJ112i31`dM H11M
lOtldWl 4Nd113M
-
7----
'
- _
-- --- -- - -
___ £6-_996H1n0 nNI
aN3 L£
80+L6:ViS £6'991INl
LZ'bL?=VlWf?l
0
'
6+91
ViS
o ti#HINSS
co
u
w
J
w ,
H
l•'tiL l•
J
1
I
I
i
3
L'£L t-
ti'£L I
£'£L l
0'£L L
L'ZL 6
97L
l
£'ZL 6
9'ZL l
O
O
N
0
0
0
N
0
O
+
O
O
O
00
0
0
Q
a5
? J
FL
Dp
z
ol 1
4
0
m
U
o z 00 cD N o 00 0 ' N o ti'ZL l
ao w O CD CD cD
> CD
?
6£1 I -D N asua?Dlj ewloJe' yaJON
6GB-L9£ (6 i V wi06L9-L9£ (616) aeon C
G £LZ£ -N 'L?eO 'C 0 I b nsRo;'?,'ed Ra5arj 0001 .0e Q LL
t : B mlvo VC
?NI??n?ns DNb1 NVld L dVW 1OVdWI aNV'713M _ U) O
?NI?J??NIJN? 11/?1? ?
D N I N N `d-l.A a N b-l Cb L 0 N110 8938.3-L0-0090dS 'ON 103f OIJd z
d own S3omu3S A.Lnan HIHON a`10 JO; zco w
no.z? co
_
Z# dnW 10dd W 1 a Nd'i13M z
W
J zQ
v cn w DO
U ?
w
v LL Cl)
J
O
O
w z
co 00 CO M M O CO M O
X
Cl) co 00
W W I-
} o
ff
0
a 0 ? ? ? ? ? N LO O Cl) O OMO P- Co CO
Qz°
I_- co J J
(D N? ti p N ? IN Cl) 0 N0
Q Q w ti
w W
O co z N LO J ? CO m N M 00 N - O
4 Z W Q N N ? N N
cjz0? Z L,)
0
X 1 -1
w 0- LL
F- F-
z O
4
LL O C9 C7 C7 C7 C7 ? EL 0- 0- 0- z
W
0 W ?
zZ z J +a
I- w CL
x 0 1-
W J
>- z U
O
Q
Dc z
Z
00 Z Z> gw?
+
N P: ?W xJLLJ
O > Q~
z cn5 H wwT
O F? Z Uzi
o zavi ° <U0-
F-
w z Q o?W 00 U
Q C a Zz}-co
I- 3 a z :i
z>
F- w
w x J •
z W w o
00
r- N = Z a-- 1
co
r
W Q 2 LL /
? CO M QUO N
w
LL
J
F- F-
` ` m Z U a w
F ZQLL ZFv W m
:22 Uww?
co wY>cn
co CL LLU00? u
J J 2 CO
woE- QOZ
/? d c
C? p ?i
z na
a Z
(I ? - «?
Co < ca
Q c w U
G
°? } Z rn U
L6 U) (D
(D
cZJ W gT. Z F d M D
y ?1 fEP? m a?11b '
INNER, Z Q N Q
U F- w e
U) /
W W /
Z
W
?
?
?
?
?
N
0
0
O
o m 0
0
0
?
O ?
0
0
N
n u") j
0
0
?
L O 7
0
0
?
O O
0
0
O
? M
0
0
( N D
?
0
N
0
0
?
in
?
0
e1'
c0
?
0
N
O 00
?
? 0
O
ti
0
0
z (D ? O N N ? r.- N ? ? ? N ? LO
Z d O ? M a ~ 0 ? ? c0 o
J 2
?- p :
? I? m m u ) (D o0 ? (O CO
? ?
N
I ?
? ?n ? ? LO ca ? co c? ?t ? ca co co ti
O N ? N N N N
' N N N
Z ? to Lc) U
) ? ? L0 (n ? LO ?
O
? N M IT
Z_ Z Z z
O _
O _
O O
O
U
Q
U
Q
U
Q U
Q
?
? C7 C7 ? ? C7 0
6£L I _) # asua?rl ewlole) H410N
16L9L9£(6i6) 06L9L9£(bi6)a?'Cn 0? co
•Ire,) ,(?,.a6a? 000 i I 1 11
B I SLZ '7'N 'tie0 'O I b ^7in5?cem
?ED N Ike /\-.-A n s a N `d-I
0
2lQQNIDN? ?In1? Ned L ddW 1DVdW1 aN"13M O
?N1 Lr)
J N I N N `d-1 .=A Cl N d--l ZV 10 N113 89Z8.O-LO-0090dS 'ON 103f Okfd
Sul dno.z S3OIAa3S A.Lnun HIHON 010 JOI W LLJ
z# dnW 13dd W 1 0 NV 113M =
W
L"l96
I rn 0000 co 000 co co ti ° 00 (o
T T T T T T T T T T T T r
0
0
5"6L L co
6 "LL ?
4m
O .
4
0
0
Z'9L L
M
N
L "9L L
a
o ?-
° US
Z"9L L C)
Q
CL W
0"9L O
Z cr
IL
O
O
b"5L L N
6"lL6
0
0
Z'9L 6 co
N
0"9L 1
0
0
9"LL L I+
N
0
n
ui
m
U
(n
6£L -? # asu991? ewlole:) 4?oN
16L9-L9£(6i 6)xrS 06L8'L9£(6i 6)aio?
81 SCZ -ON '?+r?'OI b rams (rrn?ar,) .(:au6aa 0001 I
?NI??n?nS aN`c1-1
JNI?I??NIJN? 11n1?
J N I N N`v'-l ?A Cl Nd-l
:. F
?u1 ?dno
OYw _ .31vos
1 11
Ned L ddW 1C)ddW1 aN"13M
Cb t 0 MID 8SZ8.3,L0-009OdS 'ON 103f Oad
soollueS f4min 4WoN PIO a0:d
W dVW 13ddWi WV3HIS
t ^
O
O
=U)
Z
oM
co
Z
00
L
O
w
M
Cn
A N
Q Z
CO tZ ?
C6 2 d
N Z CO ? U
N
a
2 a A v W
Q of 2
? Q
cf) co U
?
a c
J_
0 ? V
Q L-L
>- CL
w
J
Q
N ?
`? ?
°
1-
Z ?
Z
O
CL O ?w w
A a w 1-W
U Z F- F- U) Q
Q
CL
? < U
F5
H
m U ?
Lo Q
2 ~
U) N -
+
CN
Cl) w
C/) C0
A
T
01
C
d'
A
1- w
1
U
v? i
1
Z F- 1
Q
J °
LL 1
Z W
H F- 1 w w F-
}o?
F-
o Cl)
I 1=
'
}
w' ooJ-
QQ
O A
cn LU Lu
a ° 1 + OpQm
li
i 1 ZF- w¢
1 U) Z U?
w -
1 w a
1
F I
F- 1
1 A
1
1
1
1 A
i
1
1
a I
.
Q 1
a ? ? 1
owl
N
LU
v
Ao s? Z
TE LL
lows,
vi
1 O
r-
Z c ARMIS
m ?113a ammoR Z +
IL V A
W _
> U)
i
W N Z
C
? (L 00
_ I
1
6HL. I -:) # 9GUO911 eullcJe:) yauoN
16LB'L9E It, 06L9-L5£ a0ro? 'Oi „ ¦ ¦31VOS
41 `LZ '7N -/.iFD e?'(D 'Ol ;xrns Ao;need A-?xaD ay pip; I y ` ¦
a N d? ?-
JNI?J??NIJN? NV'7d L dVF M 1C)Vd1A11 aNV713M O
J N 1 N N`d-I-l Cl Nd-l Lb 10 N110 8938.O-LO-0090dS 'ON 103f oUd ~
?ul `dnoif) •.?, s3Oina3s A.Lnun HIHON C110 JO; w
W dVW 13VdWl WV3HIS
0'98 L
u-
? J
Lo
M g g
o
69'08L=in0'ANl tl•981
ce)
6L'08L=NI'ANl
t,Z'98 L="N
8E'LL+Z , '` iS
Z L#HWSS
DWI HV33 JiS ---- 0'L8L g
------------------------------------ - - - --------------------------- ?----- --------------- --
a'8£+Zti :d1S
-- ---------------------------------- - - ----- -------------- ---?•--------------------------
9'LZ+Ztb :ViS
SO'08L=1n0'ANl
= S 4'08 L=NI'nNl o0
~ 6818L=WN £'98L +
w o 06+H7 'ViS ?r
HL L#HWSS
do
z0
(n ' (n W L
W W S U1 aa0
` z
C/) z
UU_ i > Oaf
z (D LO 5 zo
Q L'88L Q
N Z0
J o Q
WQ ?m W
V) W y t ?O00 >
?D2 0 I N U- of Wcn
coZ C) Q W Wal- > II
LL z
-Z QO t]??2z
o Q W
c°o? zW Cj0 L'L8L a J b
N o U) Z . d
Ln 0 lion 2 -
X 0 o N
W a 00
00:T 0? O
c0
U
(n
? Q a
L'L8L W
M
C) F-
i
0
8'98L 0
i
0'98 L
LL
J
00
co
0
O
I
L
96'LLL=inuANI C,92
SO'8L L=WANI
SE'S8L=AN
8E'ZL+8£ '` iS
L L#HWSS
L'b8 L
M rn m ? 0 00 0 ado co 0000 0ti0 It IN °
r r r r r r r r r r r r r
6£L I -? # asuoDll ewfOje:) yIJON ¦ co
IGZg L9£(6i6)'a? 06LB-L96(616)--A O
81SLZ '0' N'tie0 '0 b Wg '/ce?l`J .(?ua6ab 0001 I 1 11 LL
?N I???? ns O N?r-l NVId L ddW J.C)VdIMI (31Y"13M O
DNI-IggNIJN;l co
) N 1 N N`v'-1-1 Q N-,V-l ZV t 0 NII3 89Z8.3-L0-009OdS 'ON 103f oUd
S301Aa3S A11' un H1aON alO JOi W
dnoig . _
SNO1103S SSOUD Z# 10ddWI cn
z
Ow
U
ONI=? Q O 3
Z W X W U x
az w 00
??}O W }W Q
O?pJ w°D Q
LL oFLL<o =p O co
p F?pcqLwu
w ? Q
o >. X x Al.
aw wz0?C7 Q$QQ t-
°OEww a
ovwi ?vaQw :SQ~J Z
H} o LLg w U) w? N LL
OQ >?OrF > F- F-
0 xr pzLLZZ pzz
a- x0LL Z W} N¢ CL 0 a00 T
0 ? F- v cn z
ILLL,
> -
z° I N 0
WLL o? I 00
U
? co
? =Z I 0-1
cD L-) J C7 W I
o Z N?_ Q
?
p N 0 LL I w m J
wX W
N
x9° o= I Z
UQ Q
J W ? J
(7? LLa
zQ z 01 ? Q
F 00 ' cn 22 z
CnNQ ZW O
w?U ?Q
It co U
LL x W
° w Cl)
Fw
LL°3 co
O Q
Y>Q N + F
O
=m~ 6'LL? N Cl) z
Z
N
oWn LL #
o?° W
a0U
Z z Q V
U >
o Q
C)
C0 CL I
Qc)
/ Z
0
0
+
O m Co N O m Co 'IT N O O Co co
fC
O 00 O O O O ti ti??? CD CD N V U
r r r r r r r r r r r r r ? ? (n
J
W w
F Z ?
U Q o N
Z L) CV V N
O p C) m O W LL LLT
U Z N J O W ?i 0-
W? Z H W O
S T< LL ? ? r ° ? Q LL
-
tOp Ow w u a>- m
0?
?? az
ELLUO ZU LLO NaF =N
- v
?g F-U > W? co p
LL w LL W fn 0 ---?
LL y
OOU °W OLL co
0? W Y U QL
o °; N z
H O O ?- o W
F II W r N
wW z0 6ZL6 0 LL - QJ n
Uz P: r U °o} [zj a°
o=o > W a? Q
ova J C) w? °W= J
zLL w
NU)z co ?< 00 O F
zX Q (1) LLU U z
LL LU 0 _j LL z: (n Z M
0
0 W coo0 W
o a w F- wO
mLL C)
W N JW¢O
=()f? f-
Q'T Z
o U o ')} o
W ° J }
It CN1 0 co CD 't N O O 6 L 6 O Z = Q Q
I-- Co O CD O O co
LL
O 04 w
U
U 0 @)F-
_ U)
._ W U
CV LL 6i
2 °
U Z
Q
W
J
Q
U
a
}
LL
a
co
co