HomeMy WebLinkAboutNCC204093_ESC Approval Submitted_20201106ROY COOPER
Governor
MICHAEL S. RECAN
Secretary
S. DANIEL SMITH
Director
LGI Homes - NC, LLC
ATTN: Kevin Vautier, VP of Construction
1450 Lake Robbins Drive, Suite 430
The Woodlands, TX 77380-3258
NORTH CAROLINA
Environmental Quality
January 24, 2020
LETTER OF APPROVAL
RE: Project Name: Lot Clearing Plan for Lot 80 at Avery Pond Sub, Ph IIIC
Acres Approved: 0.27
Project ID: HARNE-2020-058
County: Harnett
City: Hectors Creek Township
Address: Old Head Way
River Basin: Cape Pear
Stream Classification: HQW
Submitted By: Lee R. Hines, Jr., PE
Date Received by LQS: January 7, 2020
Plan Type:
Dear Mr. Vautier:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan shall expire three (3) years following the date of approval, if no land
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
CNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General
Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on
the above -named project The NOI form may be accessed at dea.nc.govJNCG01. the NOI form to Annette Lucas at
Annette.lucasna ncdear.gov or Paul Clark at Paul.clarkt&ncdenr.gov. After you submit a complete and correct NOI
Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice
of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
ME ;.�� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
•1 Fayetteville Regional Office I M Green Street, Suite 7[4 I Fayetteville, North Carolina 28301
eeaar c euwa
�^ ^°°'°'��^^°.°'A"'� 910.433.3300
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGOI permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina`s Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project,.the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute I I3A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are requested to
file an amended form if there is any change in the information included on the form. This
permit allows for a land -disturbance, as called for on the application plan, not to
exceed the approved acres. Exceeding the acreage will be a violation of this permit and
would require a revised plan and additional application fee. Any addition in impervious
surface, over that already noted on the approved plan, would also require a revised plan
to verify the appropriateness of the erosion control measures- and the stormwater retention
measures. (GS 1 I 3A-54. 1 (b)). In addition, it would be helpful if you notify this office of
the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
G 6:4 ?>A4,,.
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Lee Hines, P. E., Lee R. Hines, Jr. — electronic copy
Landon Chandler, Harnett County Planning & Inspections Office - electronic copy
Fayetteville Regional Office