Loading...
HomeMy WebLinkAboutWM0100391_Permit (Issuance)_20160823 N. PAT MCCRORY co. DONALD R. VAN DER VAART RT —'.' Water Resources ENVIRONMENTAL QUALITY S. JAY ZIMMERMAN Dereaa� August 23,2016 Cary Oil Company. 110 Mackenan Drive Cary,NC 27511 Re: Well Construction Permit: WM0100391 HHA Development LLC Property Property PIN: 2766651221 Caldwell County,NC Dear Madam or Sir, In accordance with the application submitted on your behalf by Christine Schaefer on August 18,2016, with additional information received August 22,2016,we are forwarding well construction permit WM0100391 dated August 23,2016.The permit is for the construction of one monitoring well on -- property owned by HHA Development LLC as described in the application and the attached permit. The permit will be effective from the date of issuance for a period of one year and is subject to the conditions and limitations as specified therein.A Well Construction Record shall be completed and signed by the certified drilling contractor for each well.This form shall be submitted to the Division of Water Resources upon completion of each well and shall reference the permit number. Please review the attached permit conditions. If you should have any questions or need additional information contact Andrew Moore at 828-296- 4500. Sincerely, G.Landon Davidson,P.G. Regional Supervisor Water Quality Regional Operations Section cc: ARO file Christine Schaefer,ATC Group Services LLC(via email) SLA,ofNAAh CATBO HTv.,, nMua Quality I WAIL,RL.0 L 2090 U.S.Hwy 70 Sww,.v NOA Carolina 28778 8282964500 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF MONITORING WELL In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws,Rules and Regulations. PERMISSION IS HEREBY GRANTED TO - Cary Oil Company FOR THE CONSTRUCTION OF A MONITORING WELL SYSTEM consisting of one well owned by Cary Oil Company, 110 Mackenan Drive,Cary,NC 27511. The well will be located on property owned by HHA Development LLC located in Caldwell County(PIN#2766651221).This Permit is issued in accordance with the application received on August 18,2016,with additional information received August 22,2016, in conformity with specifications and supporting data,all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only,and does not waive any provision or requirement of any other applicable law or regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well construction. If any requirements or limitations specified in this Permit are unacceptable,you have a right Is an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the Form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings,6714 Mail Service Center,Raleigh,North Carolina 27699-6714. Unless such a demand is made,this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations,or exceptions as follows: 1. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency. 2. The well(s)shall be located and constructed as shown on the attachments submitted as part of the Permit application. 3. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(0)where applicable. 4. The monitoring well shall be maintained in accordance with 15A NCAC 02C.0108. 5. A Well Construction Record (GW-1) for each well shall be submitted to the Division of Water Resource's Information Processing Unit within 30 days of the well completion in accordance with 15A NCAC 02C.0114. 6. When the well is discontinued or abandoned,it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resource's Information Processing Unit and the property owner within 30 days of the well abandonment in accordance with 15A NCAC 2C.0114. Permit issued the 23rd day of August, 2016 FOR THE NORTH CAROLINA ENVIRON ENTAL MANAGEMENT COMMISSION Landon Davidson, Regional Supervisor Water Quality Regional Operations Section By Authority of the Environmental Management Commission Permit No.# WM0100391