Loading...
HomeMy WebLinkAboutNCG070089_Rescission Granted_20201105 , \r ROY COOPER , Governor MICHAEL S.REGAN Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality November 5, 2020 Steve Wyse General Shale PO Box 3547 Johnson City TN 27602 Subject: Rescission of NPDES Stormwater Permit General Shale Brick, Inc. Certificate of Coverage: NCG070089 Lee County The Division of Energy, Mineral and Land Resources received your request to rescind coverage under NPDES Stormwater Permit NCG070089 for the above named facility. Coverage of NCG070089 has been rescinded effective immediately. Operating a treatment facility, discharging wastewater, or discharging specific types of stormwater to waters of the State without valid coverage under an NPDES permit is against federal and state laws and could result in fines. If something changes and your facility would again require stormwater or wastewater discharge permit coverage, you should notify this office immediately. We would be happy to assist you in assuring the proper permit coverage. If the facility is in the process of being sold, you would be performing a public service if you inform the new or prospective owners of their potential need for NPDES permit coverage. If you have questions about this matter, please contact the Stormwater staff in our Raleigh regional office 919-791-4200. ' cerely, For Brian Wrenn Director steve.wyse@generalshale.com warren.paschal@generalshale.com v�/ 512 NorthNorth Carolina Salisbury DepartmentStreet of 1612 EnvironmentalMailService Center I Raleigh,Quality I DivisionNorth of Energy,MCarolinaineral27699-1612 and Land Resources NOR CAROLINAD. Department me Emtronmenhi aw\ /`� 919.707.9200 Compliance Inspection Report Permit:NCG070089 Effective: 06/01/18 Expiration: 05/31/23 Owner: General Shale Brick, Inc. SOC: Effective: Expiration: Facility: General Shale Brick, Inc County: Lee 737 Colon Rd Region: Raleigh Sanford NC 27330 Contact Person:Warren Pascal Title: Phone:919-775-2121 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 11/05/2020 Entry Time 10:30AM Exit Time: 11:30AM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Stone, Clay, Glass,and Concrete Products Stormwater Discharge COC Facility Status: Compliant Ei Not Compliant Question Areas: El Storm Water (See attachment summary) Page 1 of 3 Permit: NCG070089 Owner-Facility:General Shale Brick, Inc. Inspection Date: 11/05/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Meet with Warren Paschal and all the paper work was in order.We walked the site and it was completely vegetated except where the old building was located and it was completely gone except for the concrete floor. Looked at the outfall and there were no problems there. The requested rescission is OK to approve Page 2 of 3 Permit: NCG070089 Owner-Facility:General Shale Brick,Inc. Inspection Date: 11/05/2020 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? • 0 0 ❑ #Does the Plan include a General Location(USGS)map? • 0 0 0 #Does the Plan include a"Narrative Description of Practices"? • 0 0 0 #Does the Plan include a detailed site map including outfall locations and drainage areas? • 0 0 0 #Does the Plan include a list of significant spills occurring during the past 3 years? • 0 0 0 #Has the facility evaluated feasible alternatives to current practices? • 0 0 0 #Does the facility provide all necessary secondary containment? • 0 0 0 #Does the Plan include a BMP summary? • 0 0 0 #Does the Plan include a Spill Prevention and Response Plan (SPRP)? II 0 0 0 #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? • 0 0 0 #Does the facility provide and document Employee Training? • 0 0 0 #Does the Plan include a list of Responsible Party(s)? • 0 0 0 #Is the Plan reviewed and updated annually? • 0 0 0 #Does the Plan include a Stormwater Facility Inspection Program? • 0 0 0 Has the Stormwater Pollution Prevention Plan been implemented? • 0 0 0 Comment: Everrything is up to date Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? • 0 0 0 Comment: Everything is up to date Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 0 • 0 #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ I ❑ Comment: N/A Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? • 0 0 0 #Were all outfalls observed during the inspection? • 0 0 0 #If the facility has representative outfall status, is it properly documented by the Division? 0 0 • 0 #Has the facility evaluated all illicit(non stormwater)discharges? • 0 0 0 Comment: All is in order Page 3 of 3