Loading...
HomeMy WebLinkAbout20100227 Ver 1_Approval Letter_20100503LV-RXA WDENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor F. Durward Tyson, Jr., P. E. Rivers & Associates, Inc. P. O. Box 929 107 East Second Street Greenville, NC 27858 Coleen H. Sullins Director May 3, 2010 Natural Resources Dee Freeman Secretarv DWQ Project # 2010-0227 Beaufort County Subject Property: Keys Landing subdivision; Washington, NC UT to Herring Run Canal, Tar-Pamlico River Basin AUTHORIZATION of Tar-Pamlico River Buffer Rule (15A NCAC 02B.0259) Authorization Certificate Dear Mr. Tyson: You have our authorization, in accordance with 15A NCAC 02B .0259 and any conditions listed below, to impact approximately 240 ft2 of Zone 1 and 160 ft2 of Zone 2 of the protected riparian buffers for the purpose of constructing the sanitary sewer crossing of the subject feature as described within your application dated March 17, 2010, and received on March 18, 2010. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, Stormwater, and Division of Coastal Management regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Authorization are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: North Carolina Division of Water Quality Internet: www.newaterquality.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer- 50% Recycledl10% Post Consumer Paper NorthCarohna Naturally Page 2 of 2 Amount Approved Units an Location or Reference l Buffers 240 ft (square ft.) 160 ft2 s ft. (uare one 1 -both sides of UT ne 2 - both sides of UT tz ( 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0233(5). 3. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0259. This letter does not authorize any impacts to either Waters of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. If you have any questions, please telephone Chris Pullinger of the Washington Regional Office at 252- 948-3920 or Amy Chapman of the 401 Oversight/Express Unit at 919-715-6823. Si cerel , for Coleen . u in Enclosures: Certificate of Completion Buffer Rules cc: Corps of Engineers Washington Field Office DWQ 401 Oversight/Express Unit CAMA, WaRO DLR, WaRO DWQ WaRO File copy James C. Smith, City Manager, City of Washington Filename: 2010-0227