Loading...
HomeMy WebLinkAbout20091339 Ver 1_More Info Received_20100518Lucas, Annette From: Lucas, Annette Sent: Tuesday, May 18, 2010 12:01 PM To: Leo Green III Cc: Scott Joyner; Lucas, Annette Subject: RE: Reser's Detention Basin Plants Leo, That will he fine to replace the foxtail plants with bulrush. I will print this email for the file and that will be sufficient documentation of the change. Thanks, Annette From: Leo Green III [mailto:LeoIII@greeneng.com] Sent: Monday, May 17, 2010 4:29 PM To: Lucas, Annette Cc: Scott Joyner Subject: FW: Reser's Detention Basin Plants Annette Will you please read the email below and let me know if this is acceptable? If it is will it require us revising our planting schedule and providing you a copy? Thanks for your help. E. Leo Green, III; P.E., P.L.S. Green Engineering, PLLC 303 Goldsboro Street E Wilson, North Carolina 27893 252-237-5365 (Phone) 252-243-7489 (Fax) elg3 @greeneng.com From: Scott Joyner [mailto:sjoyner@rightmyer.com] Sent: Monday, May 17, 2010 4:29 PM To: Leo Green III Subject: Reser's Detention Basin Plants Good afternoon Leo, Our landscaper called this morning. He said he is having a hard time finding the foxtail plants called for in the detention basin at Reser's. Every supplier said they are not growing them because they do not grow well in our area. Their recommendations are to replace the foxtail plants with bulrush plants that will grow well here and be more susceptible to survival. Will this be OK? Please review and reply. Thanks. f" Seet ?? Rightmyer Machine Rentals, Inc. 497 Hwy. 48 1 Roanoke Rapids, NC 27870 Ph: 252-537-3223 Fax: 252-537-4645 soynerA htm Leer_com