HomeMy WebLinkAbout20201391 Ver 1_Pre-Filing Meeting Request_20201005ID#* 20201391
Version* 1
Regional Office* Mooresville Regional Office - (704) 663-1699
Reviewer List* Alan Johnson
Pre -Filing Meeting Request submitted 10/5/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Donald Cauble
donaldcauble@gmail.com
CAUBLE Shoreline rip rat overcoat
Donald Cauble
Iredell
Street Address
144 Carlton Drive
Address Line 2
aty
Mooresville
Rbstal / Zip Code
28117
Is this a transportation project?* r Yes r No
State / Frovince / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Alan Johnson I believe. Do not know anyone but him so far.
Please give a brief project description below. *
The original and last time the shoreline stabilization was completed on this
lot was the late 80's/ early 90's. We are wanting to put an overcoat of
riprap over the existing riprap on the shoreline. There is no buffer clearing
or work that needs to be done except the overcoat of the existing shoreline.
There is also a 10', flat, grass path around the entire shoreline that the
work will be done from as well as a drive that goes from Carlton to the
water. All work will be completed from land and none from the water. There
is approximately 300' of shoreline to have the refresher coat. A new dock
was completed last year and has already received its Duke Energy license
tag.
Please give a couple of dates you are available for a meeting.
10/20/2020
10/21 /2020
10/22/2020
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/5/2020