HomeMy WebLinkAbout20121081 Ver 2_Correspondence_20201102Strickland, Bev From: Homewood, Sue Sent: Monday, November 2, 2020 4:33 PM To: Carrie Caviness Subject: RE: [External] SAW-2019-00861, DWR#20121081 v2 Watauga County; Question on Permit Modifications posed by DEMLR Hi Carrie, I apologize, I should have clarified when DEMLR asked about changes to crossing locations that we would be mostly concerned with permanent crossing locations. Since the impacts are less than what was approved and the only modifications are to S4, temporary crossing location and S7 type of temporary crossing, the Division would not require modifications to the 401. We do always recommend that Permittees double check with us about design changes as our approval letter states that it is only valid for the project and plans we reviewed/approved, however for small modifications such as these we will just put the updated plans on file and not require an 401 modification. Sue Homewood Division of Water Resources, Winston Salem Regional Office Department of Environmental Quality 336 776 9693 office 336 813 1863 mobile Sue. Homewood@ncdenr.gov 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 3" i From: Carrie Caviness <carrie.caviness.l@gmail.com> Sent: Monday, November 2, 2020 3:09 PM To: Fuemmeler, Amanda J CIV (US) <amanda.jones@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Joe Furman <joe.Furman@watgov.org>; Teresa Buckwalter <teresa@mosaiccivic.com> Subject: [External] SAW-2019-00861, DWR#20121081 v2 Watauga County; Question on Permit Modifications posed by DEMLR External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good afternoon - I'm emailing you both in reference to the approved permits issued in 2019 for the Middle Fork Greenway Section #4 in Watauga County. The project has changed in scope since the permits were issued. The purpose of this email is to glean whether the changes warrant official permit modifications and any re -submittal. Here are the proposed changes (the table is from the PCN originally submitted for the project): S1- this crossing has been excluded from the current design. S2 - this crossing has been excluded from the current design. S3 - this crossing has been excluded from the current design. S4 - this crossing remains in the plans but has been shifted — 50' downstream of its originally proposed position. This was done for two reasons: 1) S5 is no longer proposed and 2) a span bridge is currently proposed at the area previously proposed for the temporary ford crossing. S5 - this stabilization has been excluded from the current design. S6 - this crossing remains the same in impact length and location. S7 - this temporary crossing remains but has been proposed as a timber mat rather than a stone ford crossing per NCDEMLR recommendations and shifted from upstream of the proposed span crossing to downstream. No additional stream or any wetland impacts will occur as a result of design changes; S4, S6, and S7 remain. I Lm Ii ..El Mnptt,• 547 kJrcd 6na�rS 1Q 75 FQk pr�1111 +tir�rpAaal �+aKj C�eeiSp 1p sC3 kif• Bud &iYClr �O+. row 0 111 ti+evwll 93 -V sosrrn U.'*1 ar M gae6i4�eeah - MFr-R I eh+namtna k5 Lrr.1fWI Nreya{Wl am rum 34 6 —ya1 r-T—Ary 51aWimba PA rwrW 16 PSUbKmAbn PwmKwY ffiI�n hR 187 AAnWftSj *weft M $G Lr- . A~ 2 h Warm Wdt NR2 +irW Arc+ Mr4 Wwrhovew ul 9rindi I 15 4d +++F �M Awrp{Ira? 1xu rt l In a letter of disapproval dated 10/30/2020, relevant to the revised ESC planset, Ms. Tamera Eplin of NCDEMLR Winston Salem posed the following question which prompted this email. The 401 Certification was issued on June 28, 2014 but the scope of the work has clanged_ A conversation between the RSC plan reviewer and the Water Qwlity Regional Operations ration (WQP.OS) indicated a modification to the 401 Certification may be necessary if the crossing locations changed significantly. Please verify with V QROS whether a modification to the 401 Certification is necessary, in order to review the ESC plan for limitation of stream and/or wetland impact, clearly label all areas of proposed and/or approved temporary and/or permanent impact. Please summarize any discussions with the W ROS. (G.S. 113A-57(3), 15A NCAC 4B .0106, 1 SA NCAC 48.01151 A copy of the revised planset is attached to this email as well as the original PCN. Please note - S6 is now referred to as Stream Crossing #2 and S7 is now referred to as Stream Crossing #1 on Sheet C-2. The S4 temporary crossing impact is shown on Sheet C-2.1. Thank you for your review of this matter and your response. Please note we are within the 15 day window for response which began on 10/30/2020. If you are unable to respond by 11/13, please let me know so that we may alert NCDEMLR. Sincerely, Carrie Caviness Carrie Caviness, PhD Interface Environmental Consulting, LLC. 476 Hidden Pond Rd Boone, NC 28607 (919) 656-4543