Loading...
HomeMy WebLinkAbout20201081 Ver 2_USACE Correspondence_20201102Strickland, Bev From: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil> Sent: Monday, November 2, 2020 5:12 PM To: Carrie Caviness; Homewood, Sue Cc: Joe Furman; Teresa Buckwalter Subject: [External] RE: [Non-DoD Source] SAW-2019-00861, DWR#20121081 v2 Watauga County; Question on Permit Modifications posed by DEMLR Categories: put into LF External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Carrie, I don't need see the need for us re-issuing/modifying the permit if impacts have not increased or change location substantially (within 50-feet is fine if we have the new location shown on the plan sheet) so I will just place this information in the file in case anything comes up and/or we do a compliance inspection. Amanda 828-271-7980 ext. 4225 From: Carrie Caviness <carrie.caviness.l@gmail.com> Sent: Monday, November 2, 2020 3:09 PM To: Fuemmeler, Amanda J CIV (USA) <Amanda.Jones@usace.army.mil>; Homewood, Sue <sue.homewood@ncdenr.gov> Cc: Joe Furman <joe.Furman@watgov.org>; Teresa Buckwalter <teresa@mosaiccivic.com> Subject: [Non-DoD Source] SAW-2019-00861, DWR#20121081 v2 Watauga County; Question on Permit Modifications posed by DEMLR Good afternoon - I'm emailing you both in reference to the approved permits issued in 2019 for the Middle Fork Greenway Section #4 in Watauga County. The project has changed in scope since the permits were issued. The purpose of this email is to glean whether the changes warrant official permit modifications and any re -submittal. Here are the proposed changes (the table is from the PCN originally submitted for the project): S1- this crossing has been excluded from the current design. S2 - this crossing has been excluded from the current design. S3 - this crossing has been excluded from the current design. S4 - this crossing remains in the plans but has been shifted — 50' downstream of its originally proposed position. This was done for two reasons: 1) S5 is no longer proposed and 2) a span bridge is currently proposed at the area previously proposed for the temporary ford crossing. S5 - this stabilization has been excluded from the current design. S6 - this crossing remains the same in impact length and location. S7 - this temporary crossing remains but has been proposed as a timber mat rather than a stone ford crossing per NCDEMLR recommendations and shifted from upstream of the proposed span crossing to downstream. No additional stream or any wetland impacts will occur as a result of design changes; S4, S6, and S7 remain. , Rr�aondar Mrp�ul+- js��poa s� , Typf olNnpre4' , 0.nrnrr� Slrtar�Tjpi+ �W �+ 9, arE�h' rah. I�aer �I �9g, i 07114q}O19C11 nw Onwa7 Mod WOWS ire.el h 10 is �apCwU I�w Mq CroYNp 6[ 9C2 Uf= , &W &With — — 19 g anp3urtem{*f %Al 8fl>W&Y MFhFki l a is U7 H21 Ift"'MW ]V*w "aPNK rwwM1q Term Straam[.UW*VAll vrWa7 N4 urd IS sa"Mm &MMM6on L 81rA &8b2Mbon WNR arc" W 167 {feel W&V &Vj C+irfalrp M WA Ur• -A~2 hWmw&�"l �6 IFM IYr�' tarp 4w M*-*O"kVa 1`pp}gfy $ifq�Illpn emno Pfmnrial iD 15 ISU M*Mil-q Ek*r .. /�-v�fFilm4 11rr�'ra4 In a letter of disapproval dated 10/30/2020, relevant to the revised ESC planset, Ms. Tamera Eplin of NCDEMLR Winston Salem posed the following question which prompted this email. 1. The 401 C ertilication was issued on Junc 28, 2019 but the scope oFthe work has changed_ A conveys don between the FSC plan reviewer and the Water Quality Regional Operations Section fiW ROS) indicated a modification to the 401 Certification may he necessary if the crossing locations changod significantly. Please verify with WQROS vvbcrh,--r a modification to the 401 Certification is necessary. Ise order to review the E C plan for limitation of stream and/or wetland impact, clearly label all areas of proposed and/or approved temporary and/or permanent impact. Please summarize any discussions with the WROS. [G.S. 113A-57(3), 1 SA NC.AC 4B .0 106, 15A NCAC 4B .01 15] A copy of the revised planset is attached to this email as well as the original PCN. Please note - S6 is now referred to as Stream Crossing #2 and S7 is now referred to as Stream Crossing #1 on Sheet C-2. The S4 temporary crossing impact is shown on Sheet C-2.1. Thank you for your review of this matter and your response. Please note we are within the 15 day window for response which began on 10/30/2020. If you are unable to respond by 11/13, please let me know so that we may alert NCDEMLR. Sincerely, Carrie Caviness Carrie Caviness, PhD Interface Environmental Consulting, LLC. 476 Hidden Pond Rd Boone, NC 28607 (919) 656-4543 0