HomeMy WebLinkAbout20070939 Ver 2_Time Ext Request_20100517May 14, 2010
401 Oversight/Express Review Permitting Unit
North Carolina Division of Water Quality
2321 Crabtree Boulevard
Raleigh, North Carolina 27604
Attention: Ian McMillan
Reference: Request for More Information
Durham Wal-Mart
Durham County, NC
DWQ Project # 07-0939, Ver. 2
Dear Mr. McMillan,
1R@UT?DW2
PrfAY 1 7 20fo
wEnAsPo - M YER CMITy
AND „TOR9WAIER DRAWN
In your April 16, 2010 letter you requested additional stormwater plan information on the project
referenced above. The deadline to have the items submitted is May 16, 2010. The project
engineer is preparing the requested information but does not have it completed at this time. At
present, the engineer has
1. Completed an initial design and layout for BMPs that should meet the mandated
treatment requirements
2. Begun the process of discussing and coordinating the proposed BMP measures with
the Owner, the City of Durham, and the NCDWQ
The applicant is requesting an extension of the May 16, 2010 deadline for 60 calendar days from
the date of this letter so that the appropriate information can be compiled and submitted. If you
have any questions, please contact me at (864) 271-3040 or chris(a)-enviropermit.com. Thank
you for your assistance in this matter.
Respectfully,
Chris Grose
Environmental Permitting Consultant, Inc.
Cc: Mike Ranks, Freeland & Kauffman, Inc.
EPC Project # 09033
P.O. Box 3744 • Greenville, South Carolina 29608 9 (864) 271-3040 • Fax (864) 235-9299