Loading...
HomeMy WebLinkAbout20070939 Ver 2_Time Ext Request_20100517May 14, 2010 401 Oversight/Express Review Permitting Unit North Carolina Division of Water Quality 2321 Crabtree Boulevard Raleigh, North Carolina 27604 Attention: Ian McMillan Reference: Request for More Information Durham Wal-Mart Durham County, NC DWQ Project # 07-0939, Ver. 2 Dear Mr. McMillan, 1R@UT?DW2 PrfAY 1 7 20fo wEnAsPo - M YER CMITy AND „TOR9WAIER DRAWN In your April 16, 2010 letter you requested additional stormwater plan information on the project referenced above. The deadline to have the items submitted is May 16, 2010. The project engineer is preparing the requested information but does not have it completed at this time. At present, the engineer has 1. Completed an initial design and layout for BMPs that should meet the mandated treatment requirements 2. Begun the process of discussing and coordinating the proposed BMP measures with the Owner, the City of Durham, and the NCDWQ The applicant is requesting an extension of the May 16, 2010 deadline for 60 calendar days from the date of this letter so that the appropriate information can be compiled and submitted. If you have any questions, please contact me at (864) 271-3040 or chris(a)-enviropermit.com. Thank you for your assistance in this matter. Respectfully, Chris Grose Environmental Permitting Consultant, Inc. Cc: Mike Ranks, Freeland & Kauffman, Inc. EPC Project # 09033 P.O. Box 3744 • Greenville, South Carolina 29608 9 (864) 271-3040 • Fax (864) 235-9299